B09_Amd4_Spec015000Addendum_-_CO_FieldOffice_DEVA_318717_0004.pdf
PDF 151 KB Posted
- Solicitation number
- 140P2025R0082
About this file
This Request for Proposal (RFP) No.140P2025R0082 is for the rehabilitation of water and wastewater treatment systems at Furnace Creek and Cow Creek Areas in Death Valley National Park, located in Inyo County, California. The addendum specifically details requirements for the Contracting Officer's Field Office, which must be a separate structure from the Construction Contractor's Field Office.
The field office specifications include a minimum 80-square-foot prefabricated, job-built, or mobile unit with specific requirements such as operable windows, security screens, air conditioning, heating, paneled or freshly painted walls, acoustical tile or painted ceilings, resilient flooring, a dead-bolted exterior door, a 20-square-foot landing with steps, and broadband access with a phone connection. The office must be located near the Construction Contractor's Field Office, Admin Camp, and contractor-provided restroom facilities.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal (RFP) No.140P2025R0082 DEVA 318717 – Rehabilitate Furnace Creek and Cow Creek Areas, Water and Wastewater Treatment Systems at
Death Valley National Park (Inyo County, California)
ADDENDUM: Specification Section 01 50 00 - Temporary Facilities and Controls.
*Contracting Officer’s Field Office*
The Construction Contractor shall provide the Contracting Officer’s Field Office in accordance with the following, as a separate structure from the Construction Contractor's Field Office.
1. Prefabricated, job-built, or a mobile unit; excellent condition, structurally sound, nonflammable exterior construction, weather tight, minimum 80 square feet.
2. Operable windows and security screens, adjustable ventilation.
3. Air conditioner and heater.
4. Paneling or freshly painted walls, acoustical tile or painted ceilings, and resilient flooring.
5. Minimum of one exterior door with dead bolt keyed from outside,
6. Minimum 20-square-foot landing and steps at exterior door(s).
7. Broadband access (no internet service) and phone connection.
The Contracting Officer’s Field Office shall be located within the vicinity of the Construction Contractor’s Field Office and Admin Camp, if applicable, and contractor-provided restroom facilities.
File details come from the government source that posted it. Updated .