12505B23Q0009_Questions and Answers dated 12.8.22.pdf

PDF 305 KB Posted

Attached to
Boiler/Chiller Chemical Water Treatment - Ames, IA
Solicitation number
12505B23Q0009
Issued by

About this file

This combined synopsis and solicitation requests proposals for boiler and chiller chemical water treatment services at the National Centers for Animal Health in Ames, Iowa. The services include providing bulk chemicals, equipment, and weekly visits to maintain a comprehensive water treatment program for chillers, cooling towers, steam boilers, and associated systems. The contract will have a one-year base period and four one-year options. Proposals are due by December 8, 2022 and the contract will be a total small business set-aside awarded based on lowest price technically acceptable criteria. The document outlines technical requirements for experience, personnel qualifications, and past performance. Pricing shall be broken out by contract line item. The solicitation incorporates numerous standard federal acquisition clauses and provisions.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12505B23Q0009 – Boiler/Chiller Chemical Water Treatment, Ames, IA

Questions and Answers dated 12/8/22

1) Can the team provide the current boiler chemical pump manufacturer and output (gal/day) of the pumps?

All pumps are controlled by 4-20ma signal to ramp up and down from the chemical controller, rather than on/off.

For pressures under 100 psi.

Cole Parmer MasterFlex L/S Model 07528-30 Flow rate of 0.06 to 3400 ml/min depending on drive rpm, pump head and tubing size.

For pressures over 125 psi.

Prominent GMXA 1602 232 psi

0.61 gph

2.3 Lph

2) Can the team provide the current tower and chilled loop chemical pump manufacturer and output (gal/day) of the pumps?

All pumps are controlled by 4-20ma signal to ramp up and down from the chemical controller, rather than on/off.

For pressures under 100 psi.

Cole Parmer MasterFlex L/S Model 07528-30 Flow rate of 0.06 to 3400 ml/min depending on drive rpm, pump head and tubing size.

3) Can we request to add a site visit?

Yes.

Organized site visits are scheduled for December 13, 2022 at 1:00 PM Central Time (CT) and December 14, 2022 at 10:00AM CT. COVID-19 requirements in place at the time of the site visit shall be followed by all those in attendance. The site visit will be held at the project location. The same information will be provided at all site visits, so offerors only need to attend one. In order to attend the site visit, you MUST pre-register by 12:00 PM CT on December 12, 2022. Pre-register by emailing melissa.grice@usda.gov with your company name, the name(s) of the representatives who will attend, and which site visit you are registering for. An email response will be sent confirming your registration.

The site visit will be held for the purpose of providing contractors with the opportunity to familiarize themselves with the site which may be helpful in the preparation of offers. Attendance at this site visit is not mandatory for offer submission; however, failure to visit the site will not relieve or mitigate the successful contractor's responsibility and obligation to fully comply with the terms, conditions, and specifications contained and/or referenced in this document.

4) What is the incumbent contract #?

Unknown

5) What are the proposal requirements for past performance?

Offerors shall submit three to five projects that are within the last 5 years with similar scope and magnitude similar to the requirements in this solicitation to show the offeror has experience the performing the work as outlined in the Statement of Work.

6) There are various technical requirements that need to be addressed in the proposal that are identified throughout the proposal. Will the contracting office be willing to provide an “Instructions to Offerors” page?

This is a streamlined solicitation so no “Instruction to Offerors” page will be issued. Offerors should address the technical requirements in the proposal package they submit.

7) We could not find a price schedule. Respectfully requesting a price schedule or advise how you would like us to price the CLINS. We’re anticipating the facility might want the cost of the controllers or any other costs to be broken out from the service and chemicals costs.

This is a Firm Fixed Price contract. The pricing should be broken out based on the contract line item structure listed in the solicitation on SAM.gov.

8) What is required to show proof of “certified personnel” for delivery of chemicals?

Current certification of the contractors own training program for chemical delivery would sufficient.

9) Can the weekly service requirement be reduced once the VA staff is trained?

No. We want better control and accountability of our chemicals with weekly visits.

10) What is the average condensate return percentage?

40 to 60 percent

11) We request to feed any remaining chemicals from the incumbent directly out of their tanks rather than mixing the chemicals in the new tanks.

Yes. This is the plan. And then the previous contractor’s tanks will be returned to them.

12) How many spill containment/response kits are required to be onsite?

We have our own spill containment and response kits. None are required to be provided by the incoming contractor.

13) Please confirm that the tanks will remain property of the successful offeror and will be returned after completion of the contract if not found successful on the next recompete.

Yes. This is the plan. And then the previous contractor’s tanks will be returned to them.

14) Is any of the current chemistry out of range?

From time-to-time chemistry goes out of range but it would have to be spot checked to see what the current situation is.

15) Would the facility be willing to provide the service reports for the last year?

We can on request

16) What does the facility expect for the transition period? Such as a certain amount of time or specific tasks that needed to be completed.

We need to use all existing chemicals from the previous contractor so the transition for some chemicals could be months. I don’t know what specific tasks they would be talking about other than transitioning to the new chemicals and different testing procedures.

17) After installation of controls and equipment, if the facility wants to reconfigure the chemical feed layout, will the contractor be able to submit a labor and materials quote to be authorized on a separate purchase order?

Yes.

18) It is stated that service reports should be emailed within 24 hours, but they are also required to be available in the online portal. Is there an expected timeline of when documentation should be in the online portal?

24 hours to the portal would work. I’m not sure why they are asking this. If you have it in a report already, I don’t think it would be too hard to copy it to the portal.

END