12-D RFP - UTD SSC SU - Bid Form - Overall PKG D Humanscale.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Student Union/Student Success Center FFE
Solicitation number
UTD20260128-TB
Issued by
Dallas County, Texas

About this file

This is a bid form for Package D of the Student Union/Student Success Center Furniture, Fixtures, and Equipment (FFE) procurement at the University of Texas at Dallas (UTD). The project, managed by UTD in conjunction with design firm Perkins & Will and construction company SpawGlass, requires the procurement and installation of new furniture for a facility under construction with completion scheduled for fall 2026. Package D consists of Humanscale furniture products totaling 104 items across four item types: 95 NeatHub Worktool units with Convenience Power, one Ballo Ergonomic Balance Stool, seven Efloat Go Ergonomic Height Adjustable Tables, and one Mini Float Mobile Table. The bid issue date is February 13, 2026, with questions due by March 6, 2026, and proposals due by March 20, 2026. Furniture delivery and installation must be completed prior to the start of Spring 2027 classes. Bidders are responsible for verifying all quantities, formulas, and totals, with any discrepancies considered part of the offer.

All pricing information, including unit list prices, discounts, extended sell prices, freight, fees and tariffs, and delivery and installation costs, must be entered into the provided spreadsheet template in designated grey-highlighted fields only. Bidders must establish a discounting structure based on the provided item quantities and include detailed assumptions, exclusions, and special conditions for any warehousing, storage, handling, and installation fees. No approvals or testing of COM (customer's own material) textiles are required for RFP pricing purposes, with final textile selection to occur post-award following Perkins & Will review. The bid form requires designation of a dealer name, project manager, designer, and project coordinator with contact information, and submissions must follow the prescribed spreadsheet format without alteration.

View the file

Other files

File Type Posted
17-05 Parking Pass.pdf PDF
6-02 SPEC BOOK-selected.zip ZIP file
3-000 TERMS AND CONDITIONS.pdf PDF
21-000 Revised E RFP - UTD SSC SU - Bid Form - Overall PKG E.xlsx XLSX spreadsheet
13-E RFP - UTD SSC SU - Bid Form - Overall PKG E.xlsx XLSX spreadsheet
24-000 Addendum No. 1 for Student Union-Student Success.pdf PDF
5-000 HSP Form.pdf PDF
7-03 FURNITURE PLANS.zip ZIP file
1-000 General Questionnaire.docx DOCX document
9-A RFP - UTD SSC SU - Bid Form - Overall PKG A Kimball.xlsx XLSX spreadsheet
4-000 UTD PO TCs.pdf PDF
20-01 RFP UTD20260128-TB SSC-SU FFE.pdf PDF
16-H RFP - UTD SSC SU - Bid Form - Overall PKG H OUTDOOR.xlsx XLSX spreadsheet
18-05 UTD MAP.pdf PDF
14-F RFP - UTD SSC SU - Bid Form - Overall PKG F.xlsx XLSX spreadsheet
22-000 Revised F RFP - UTD SSC SU - Bid Form - Overall PKG F.xlsx XLSX spreadsheet
23-000 Package I RFP - UTD SSC SU - Bid Form.xlsx XLSX spreadsheet
10-B RFP - UTD SSC SU - Bid Form - Overall PKG B Haworth.xlsx XLSX spreadsheet
2-000 Signature Page.pdf PDF
8-04-PW Digital Release Form.docx DOCX document
19-Submission Instructions.pdf PDF
11-C RFP - UTD SSC SU - Bid Form - Overall PKG C MillerKnoll.xlsx XLSX spreadsheet
15-G RFP - UTD SSC SU - Bid Form - Overall PKG G.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

302-1414 UT Dallas SSC/SU - RFP | Package D
NOTE: Include dealer name in the suffix of the file name when returning. For example: If dealer is named XYZ then the file name will be “UTD JSOM III-RFP Bid Form-XYZ.xlxs”
Submitted By Dealer Name:Dealer NameProject Number:144081.000
Account Manager Name:First Last NameBid Issue Date:13-Feb-2026
Contact Telephone:xxx-xxx-xxxxQuestions Due:06-Mar-2026
Contact Email:Email AddressBid Due:20-Mar-2026
Contact Email:Email AddressBid Form Revision Number:00
INSTRUCTIONS TO BIDDERS
1. Reference RFP document for product information and furniture plans for overall layouts. The full project layout should be reflected in your response.
2. Site and Schedule should be taken into account when calculating delivery/install. Reference the RFP document for this information.

If none provided, assume after hours for all deliveries and trash removal per standard building management requirements.

Once product is staged, assembly can occur during normal business hours with the coordination with GC and trades on site.

3. Please use the count given to establish a discounting structure. Dealer is responsible for verification of all quantities prior to submitting your response.
4. No approvals or testing is required for the COMs to be completed for the RFP pricing. Please use COM specified for pricing and once the project is awarded, Perkins & Will and the awarded bidder will review approvals and testing,

and re-select any textiles not approved at that time.

5. All costs, credits, and pricing offers should be noted in the spreadsheet.
6. BIDDER IS RESPONSIBLE FOR VERIFYING ALL COUNTS, FORMULAS, AND TOTALS. ANY DISCREPANCIES WILL BE CONSIDERED PART OF THE OFFER.
7. DO NOT ALTER THE SPREADSHEET FORMAT. COMPLETE ONLY THE GREY-HIGHLIGHTED FIELDS.

ALL OTHER CELLS CONTAIN AUTOMATED CALCULATIONS. VERIFY THAT THE TOTALS ALIGN WITH YOUR OWN CALCULATIONS.

Base Packages
Package D - Humanscale, SummaryType "Yes" or "No Bid"
Quantity of Item Types4
Quantity104
Package B - Grand Total:$0.00
Services Fee Schedule:Notes / DescriptionCost
Fee for Order CancellationsProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00
Fee for Changes to an Order After Order is PlacedProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00
Fee for PPE Requirement Durring InstallationProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Day
Fee for Extended Storage (per day on cost per linear foot)Provide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Day
Fee for Extended Storage (per day on cost per square foot)Provide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Day
Fee for Receiving and Double Handling of TrailerProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Trailer
Trip Charge - Per Trip Outside of Quantity List AboveProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Trip
Fee for Stair Carry and/or Non-Operable ElevatorsProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00 per Day
Add Any Fees not Mentioned above hereProvide details on any assumptions, exclusions, or special conditions related to warehousing costs in this text box$0.00
Project Team:
Dealer Designer Name:First Last Name
Contact Telephone:xxx-xxx-xxxx
Contact Email:Email Address
Project Manager Name:First Last Name
Contact Telephone:xxx-xxx-xxxx
Contact Email:Email Address
Project Cooridiantor Name:First Last Name
Contact Telephone:xxx-xxx-xxxx
Contact Email:Email Address

Issue Purchase Order to:

&9Prepared By: Candace Kalugyer Office: Dallas, TX Phone Number: 469.872.5177

Package D_Details

302-1414 UT Dallas JSSC/SU - RFP | Package D
NOTE: Include dealer name in the suffix of the file name when returning. For example: If dealer is named XYZ then the file name will be “UTD JSOM III-RFP Bid Form-XYZ.xlxs”
Submitted By Dealer Name:Dealer NameProject Number:144081.000
Account Manager Name:First Last Name
Contact Telephone:xxx-xxx-xxxx
Contact Email:Email Address
Contact Email:Email AddressBid Form Revision Number:00
INSTRUCTIONS TO BIDDERS
1. Reference RFP document for product information and furniture plans for overall layouts. The full project layout should be reflected in your response.
2. Site and Schedule should be taken into account when calculating delivery/install. Reference the RFP document for this information.

If none provided, assume after hours for all deliveries and trash removal per standard building management requirements.

Once product is staged, assembly can occur during normal business hours with the coordination with GC and trades on site.

3. Please use the count given to establish a discounting structure. Dealer is responsible for verification of all quantities prior to submitting your response.
4. No approvals or testing is required for the COMs to be completed for the RFP pricing. Please use COM specified for pricing and once the project is awarded, Perkins & Will and the awarded bidder will review approvals and testing,

and re-select any textiles not approved at that time.

5. All costs, credits, and pricing offers should be noted in the spreadsheet.
6. BIDDER IS RESPONSIBLE FOR VERIFYING ALL COUNTS, FORMULAS, AND TOTALS. ANY DISCREPANCIES WILL BE CONSIDERED PART OF THE OFFER.
7. DO NOT ALTER THE SPREADSHEET FORMAT. COMPLETE ONLY THE GREY-HIGHLIGHTED FIELDS.

ALL OTHER CELLS CONTAIN AUTOMATED CALCULATIONS. VERIFY THAT THE TOTALS ALIGN WITH YOUR OWN CALCULATIONS.

Package D - Humanscale, Details
Furniture TagItem TypeManufacturer / ProductLead Time/WeeksUnit List PriceDiscountTotal QuantityUnit Sell PriceExtended Sell Price
MS.10Worktool -Convenience Power - NeatHubHumanscale - NeatHub$0.000.00%95$0.00$0.00
C.85Ergonmic Balance Stool - BalloHumanscale - Ballo$0.000.00%1$0.00$0.00
T.110Ergonomic Height Adjustable TableHumanscale - Efloat Go$0.000.00%7$0.00$0.00
T.118Mobile Table - Mini FloatHumanscale - Mini Float$0.000.00%1$0.00$0.00
Subtotal Product$0.00
Freight$0.00
Fees &Tariffs$0.00
Delivery & Installation$0.00
Package D Total$0.00

Comments/Clarifications/Exclusions:

&9Prepared By: Candace Kalugyer Office: Dallas, TX Phone Number: 469.872.5177 image1.png

File details come from the government source that posted it. Updated .