10 L 9 SOW ATT 5 CD Waste Mgmt Plan TEMPLATE.pdf

PDF 29 KB Posted

Attached to
National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million Federal contract opportunity
Solicitation number
47PM1124R0011
Issued by
General Services Administration Public Buildings Service

About this file

This document contains a waste management plan template and details of a federal contract opportunity for a national elevator modernization indefinite delivery/indefinite quantity multiple award contract. The waste management plan template outlines the required format for tracking estimated waste diversion and actual waste diversion for construction projects, including weight conversion factors for common construction materials. The federal contract opportunity is seeking proposals for elevator modernization task orders over $1 million totaling $650 million over five years. Responses to the draft solicitation are requested by April 11, 2024, and the final solicitation is planned for release on or around April 19, 2024 with proposals due approximately 30 days later. The General Services Administration intends to award up to six contracts to small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million, newest first.
File Type Posted
10 L 18 SOW ATT 14 PIB 21 06 PIV Card Management Training Final.pdf PDF
10 L 8 SOW ATT 4 Section 211313 GSA Guide Specification Wet Pipe Sprinkler.pdf PDF
10 H 06 Hazmat DC0092ZZ 2023 O M Inspection of Robert C Weaver.pdf PDF
10 L 0 SF18 Lafayette Elevator.pdf PDF
10 L 2 SOW 2023 10 11.pdf PDF
10 L 1 Table of Contents.pdf PDF
10 H 05 Hazmat Bulk Sampling Test Report Submittal_11 1 16.pdf PDF
10 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees.pdf PDF
10 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures.pdf PDF
10 H 02 02090-ControlofLBP January_2013.pdf PDF
10 12 IDIQ attachment Past Performance.xlsx XLSX spreadsheet
10 National Elevator IDIQ RFP and Agreement 2024 03 17.pdf PDF
10 L 11 SOW AT 7 CIW Form.pdf PDF
10 L 16 SOW ATT 12 2019 REINSPECTION OF LAFAYETTE BLDG.pdf PDF
10 L 13 SOW ATT 9 Elevator Final Study DLR.pdf PDF
10 H 11 Weaver Building Elevator Study_100_ Submission_COMBINED_ALL.pdf PDF
10 H 04 Hazmat ASBESTOS-8987_FINAL CLEARANCE AIR MONITORING VISUAL INSPECTION REPORT_10 19 2015.pdf PDF
10 H 00 HUD Elevator Modernization Draft SOW.pdf PDF
10 H ZZ HUD Programatic Agreement signed.pdf PDF
10 10 IDIQ attachment Reps and Certifications.pdf PDF
10 INFORMATIONAL not official attachment GACA__GSAAffiliatedCustomerAccounts_May_2016v2.pdf PDF
10 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings.pdf PDF
10 18 IDIQ attachment Task Order Pricing Sheet.xlsx XLSX spreadsheet
10 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings.pdf PDF
10 H 03 CD Waste Mgmt Plan.xlsx XLSX spreadsheet
10 17 IDIQ attachment Small Business Participation Plan_SBPP_Template .docx DOCX document
10 13 Past Performance_Customer Surveys.pdf PDF
10 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII.pdf PDF
10 L 17 SOW ATT 13 LAFAYETTE HISTORIC STRUCTURE REPORT 7 1986.pdf PDF
10 L 10 SOW ATT 6 CD WasteMonthly Report TEMPLATE.pdf PDF
10 L 6 SOW ATT 2 Section 02085 Asbestos Abatement .pdf PDF
10 L 5 SOW ATT 1 Section 01546_October_2007.pdf PDF
10 L 14 SOW ATT 10 GSA Affiliated Customer Account GACA.pdf PDF
10 H 09 Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 H 01 02085-Asbestos April 2013.pdf PDF
10 01 IDIQ attachment Section 01546 Safety and Health Specification.pdf PDF
10 H 12 HUD Elevator Modernization Draft Bid Sheet.xlsx XLSX spreadsheet
10 05 IDIQ attachment Section 02090 Control of Lead Based Paint Specification.pdf PDF
10 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming.pdf PDF
10 H 08 SECTION 01546 SAFETY AND HEALTH.pdf PDF
10 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information.pdf PDF
10 L 12 SOW ATT 8 DB Schedule Detailed Small Project 07022018.pdf PDF
10 L 7 SOW ATT 3 Section 02090 REMOVAL AND DISPOSAL OF LEAD BASED PAINT.pdf PDF
10 L 19 Wage Determination.pdf PDF
10 L 15 SOW ATT 11 Key Sustaniable Products.pdf PDF
10 H 10 Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 H 07 Hazmat DC0092ZZ CONVERTERS ACM 1 23 07.pdf PDF
10 16 IDIQ attachment SF24 23a.pdf PDF
10 14 IDIQ attachment Bonding Insurance Geography Qualification Sheet.xlsx XLSX spreadsheet
10 00 IDIQ attachment NDA_Document_Security.pdf PDF
Show all 50

National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Type:

Waste Diversion Plan

(Anticipated) :

X

Waste Diversion Report

(Final) :

(to be filled out by GSA)

Project Name: ECC: Project Manager:

Project Short Description:

Building Number: Budget Activity: (list all applicable)

(to be filled out by Contractor)

Diversion

Rate

Waste not

Diverted

Reuse Recycle Compost

Estimate % of each material diverted

Landfill Diverted lbs Landfilled lbs

Asphalt

Concrete

Soil, Rock, Land Clearing Debris

Cardboard

Carpet, Padding/Foam

Brick, Masonry, and Tile

Metals

Sheetrock (not painted)

Clean Wood

Ceiling tile

Painted wood, painted drywall, plywood 0

Reusable items

Roofing

Other Debris:

Other Debris:

Other Debris:

0 0 0 0

Reuse List: Reusable items such as cabinets, built-ins, framing lumber, siding, etc. are encouraged to be reused on-site or off-site. Please list accordingly.

Weight Conversion Factors

Concrete , scrap, loose = 1,855 lbs / cubic yard

Use the following conversion factors to help you with your estimated diversion for the Waste Diversion Plan. The Waste Diversion Report is a record of your actual diversion and disposal. The Waste Diversion Report and receipts from landfills, processing facilities, and recyclers must be available for review at project close-out.

Asphalt paving, crushed = 1,380 lbs / cubic yard

Asphalt/shingles comp, loose = 418.5lbs / cubic yard

Brick, laid flat = 20 lbs/square foot flat

Brick, loose = 120 lbs / cubic foot, 3,200 lbs / cubic yard

Ceramic tile, scrap , loose = 1,214 lbs / cubic yard

Fiberglass insulation, loose = 17lbs / cubic yard

Sheetrock scrap , loose = 393.5 /cubic yard

Rock, crushed = 2,570 lbs / cubic yard

Earth, loose = 2,052 lbs / cubic yard

; On-site ; Off-site

; On-site ; Off-site

Off-Site Benefactor or Deconstruction Company

; On-site

; On-site

Item Use location

Vendor / Facility

Total:

; On-site ; Off-site

; Off-site

; Off-site

Diversion

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction (with final Construction Documents)

Total Diverted +

Landfilled lbs

Actual Waste Diversion Report To be submitted during Project Close-Out

Diverted Materials all methods

Material

(see weight conversion factors below)

Waste not Diverted

Estimate % of landfill material

Vendor / Facility

(complete Reuse List below)

Service Center / Field Office:

Project Waste Management Plan ePM/ePMX Project # :

gBUILD Project # :

RWA # :

PM email or phone:

File details come from the government source that posted it. Updated .