10 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings.pdf

PDF 70 KB Posted

Attached to
National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million
Solicitation number
47PM1124R0011
Issued by

About this file

This document is a draft request for proposal for an indefinite delivery/indefinite quantity contract for elevator construction and modernization task orders valued over $1 million. The General Services Administration intends to award up to six IDIQ contracts for a base year and four option years with a maximum value of $650 million. Small businesses are eligible under NAICS code 238290 with a size standard of $22 million. The solicitation is being released concurrently with two initial task order solicitations for site visits. Questions are due by April 11, 2024 regarding the draft RFP and task order attachments in Google folders. Awards are anticipated in early 2025.

View the file

Other files

File Type Posted
10 H 08 SECTION 01546 SAFETY AND HEALTH.pdf PDF
10 17 IDIQ attachment Small Business Participation Plan_SBPP_Template .docx DOCX document
10 13 Past Performance_Customer Surveys.pdf PDF
10 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII.pdf PDF
10 L 18 SOW ATT 14 PIB 21 06 PIV Card Management Training Final.pdf PDF
10 L 1 Table of Contents.pdf PDF
10 L 0 SF18 Lafayette Elevator.pdf PDF
10 10 IDIQ attachment Reps and Certifications.pdf PDF
10 H 06 Hazmat DC0092ZZ 2023 O M Inspection of Robert C Weaver.pdf PDF
10 16 IDIQ attachment SF24 23a.pdf PDF
10 L 15 SOW ATT 11 Key Sustaniable Products.pdf PDF
10 L 9 SOW ATT 5 CD Waste Mgmt Plan TEMPLATE.pdf PDF
10 L 5 SOW ATT 1 Section 01546_October_2007.pdf PDF
10 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures.pdf PDF
10 L 8 SOW ATT 4 Section 211313 GSA Guide Specification Wet Pipe Sprinkler.pdf PDF
10 L 14 SOW ATT 10 GSA Affiliated Customer Account GACA.pdf PDF
10 03 IDIQ attachment Section 02085 Roofing.pdf PDF
10 00 IDIQ attachment NDA_Document_Security.pdf PDF
10 15 IDIQ attachment IDIQ Pricing Sheet_for eval purposes.xlsx XLSX spreadsheet
10 L 19 Wage Determination.pdf PDF
10 H 07 Hazmat DC0092ZZ CONVERTERS ACM 1 23 07.pdf PDF
10 14 IDIQ attachment Bonding Insurance Geography Qualification Sheet.xlsx XLSX spreadsheet
10 H 10 Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 H 09 Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 L 7 SOW ATT 3 Section 02090 REMOVAL AND DISPOSAL OF LEAD BASED PAINT.pdf PDF
10 L 12 SOW ATT 8 DB Schedule Detailed Small Project 07022018.pdf PDF
10 L 2 SOW 2023 10 11.pdf PDF
10 H 05 Hazmat Bulk Sampling Test Report Submittal_11 1 16.pdf PDF
10 L 6 SOW ATT 2 Section 02085 Asbestos Abatement .pdf PDF
10 H 01 02085-Asbestos April 2013.pdf PDF
10 H 12 HUD Elevator Modernization Draft Bid Sheet.xlsx XLSX spreadsheet
10 L 17 SOW ATT 13 LAFAYETTE HISTORIC STRUCTURE REPORT 7 1986.pdf PDF
10 01 IDIQ attachment Section 01546 Safety and Health Specification.pdf PDF
10 H 02 02090-ControlofLBP January_2013.pdf PDF
10 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming.pdf PDF
10 L 10 SOW ATT 6 CD WasteMonthly Report TEMPLATE.pdf PDF
10 05 IDIQ attachment Section 02090 Control of Lead Based Paint Specification.pdf PDF
10 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees.pdf PDF
10 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information.pdf PDF
10 12 IDIQ attachment Past Performance.xlsx XLSX spreadsheet
10 H 00 HUD Elevator Modernization Draft SOW.pdf PDF
10 INFORMATIONAL not official attachment GACA__GSAAffiliatedCustomerAccounts_May_2016v2.pdf PDF
10 H 04 Hazmat ASBESTOS-8987_FINAL CLEARANCE AIR MONITORING VISUAL INSPECTION REPORT_10 19 2015.pdf PDF
10 H 03 CD Waste Mgmt Plan.xlsx XLSX spreadsheet
10 L 16 SOW ATT 12 2019 REINSPECTION OF LAFAYETTE BLDG.pdf PDF
10 H 11 Weaver Building Elevator Study_100_ Submission_COMBINED_ALL.pdf PDF
10 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings.pdf PDF
10 L 13 SOW ATT 9 Elevator Final Study DLR.pdf PDF
10 National Elevator IDIQ RFP and Agreement 2024 03 17.pdf PDF
10 H ZZ HUD Programatic Agreement signed.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 2012 Revision 02087-1

SECTION 02087- REMOVAL OF BIRD AND BAT DROPPINGS

Part 1 - GENERAL

1.1 CONTROL AREA

A. The control area includes the following:

Describe work area and indicate on project drawings

B. Related work specified in other sections:

Section 01546, "Safety and Health," applies to all work covered by this section.

1.2 SUBMITTALS

Contractor’s plan of action: to be approved prior to the commencement of work.

A. Work practices and dust control measures to eliminate or reduce dust generation during the removal.

B. Material Safety Data Sheets (MSDS) for any products used on site.

1.3 CONTRACTOR RESPONSIBILITY

The contractor shall assume full responsibility for the protection of workers, visitors to the site, and persons occupying areas adjacent to the site.

1.4 SEQUENCING

Removal of droppings must be done in conjunction with other environmental abatement work as appropriate and prior to work of other trades.

Part 2 - PRODUCTS

2.1 EQUIPMENT

A. Equipment, protective clothing and respirators required for the execution of this contract shall comply with all applicable Federal, State, and local regulations, including but not limited to: 29 CFR 1910.132 and 29 CFR 1910.132.

March 2012 Revision 02087-2

B. At a minimum, workers shall wear disposable coveralls including disposable shoe coverings and gloves. Workers shall wear NIOSH-approved full face respirators with combination high-efficiency particulate air (HEPA) filters capable of excluding particles of 0.3 micron size. Chemical cartridges for chlorine are required if a chlorine-based disinfectant is used.

Part 3 - EXECUTION

3.1 WORK PROCEDURES

A. Isolate the work area by sealing off all openings and fixtures, including but not limited to heating and cooling system air intakes and doorways. Cover all non-removable items and equipment in the work area with plastic sheeting taped securely in place.

B. Prior to removal, saturate the contaminated area. Small areas can be wetted with a soapy water mixture/water with a surfactant. Alternatively, the contractor may use a chlorine-based disinfecting solution, used at the manufacturers’ suggested maximum concentration (requires pre-approval of the product’s MSDS). Apply solution using a low velocity sprayer to prevent debris from becoming airborne.

Use an application rate to completely saturate the material. If necessary, spray the area several times to fully saturate. The disinfectant solution should be sprayed intermittently during removal to keep debris saturated. Prevent drainage of gross debris into the building drainage system.

C. Use manual scrapers, shovels, and the like for gross debris removal. Bag the droppings in doubled, 6-mil plastic bags. Close bags securely and transport to a landfill for burial.

D. An acceptable alternative method is the use of an industrial HEPA vacuum to remove the debris. Truck-mounted or trailer-mounted HEPA vacuum systems are recommended for buildings with deep accumulations of bat or bird droppings, feathers, carcasses, etc.

3.2 CLEAN-UP AND DISPOSAL

A. Disposable coveralls shall be placed in plastic bags prior to exiting work area.

Provisions for showers shall be available in the event coveralls are torn or breached. It is recommended that workers shower, thoroughly washing their hair, at the end of each work shift.

B. After gross debris has been abated, if conditions allow, the surfaces shall be final cleaned using a water stream. If this is not feasible a final application of chlorinated disinfectant shall be applied.

March 2012 Revision 02087-3

C. Air sampling, surface sampling, or the use of any other sampling method intended to confirm cleanliness is unnecessary in most cases. However, before a removal activity is considered finished, the cleaned area should be inspected visually to ensure that no residual dust or debris remains. The Contracting Officer or his/her designated representative will inspect the work area prior to approval of decontamination work.

END OF SECTION 02087