10 H 12 HUD Elevator Modernization Draft Bid Sheet.xlsx

XLSX spreadsheet 61 KB Posted

Attached to
National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million Federal contract opportunity
Solicitation number
47PM1124R0011
Issued by
General Services Administration Public Buildings Service

About this file

This document contains a draft request for proposal for an indefinite delivery/indefinite quantity contract for elevator construction and modernization task orders valued over $1 million. The General Services Administration intends to award the IDIQ contract for a base year and four option years with a maximum value of $650 million. The NAICS code is 238290 with a small business size standard of $22 million. GSA aims to award up to six contracts under the IDIQ. The solicitation will be released on April 19, 2024 along with two initial task order solicitations. A pre-proposal conference and site visits for the task orders are planned. Vendors are requested to submit any questions, comments or recommendations on the draft RFP or task order attachments by April 11, 2024 to help inform the final solicitation. Responses should identify the relevant section and page number being addressed.

View the file

Other files for this federal contract opportunity

Other files attached to National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million, newest first.
File Type Posted
10 L 17 SOW ATT 13 LAFAYETTE HISTORIC STRUCTURE REPORT 7 1986.pdf PDF
10 L 10 SOW ATT 6 CD WasteMonthly Report TEMPLATE.pdf PDF
10 L 9 SOW ATT 5 CD Waste Mgmt Plan TEMPLATE.pdf PDF
10 L 6 SOW ATT 2 Section 02085 Asbestos Abatement .pdf PDF
10 L 5 SOW ATT 1 Section 01546_October_2007.pdf PDF
10 L 14 SOW ATT 10 GSA Affiliated Customer Account GACA.pdf PDF
10 H 09 Vol1 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 H 01 02085-Asbestos April 2013.pdf PDF
10 01 IDIQ attachment Section 01546 Safety and Health Specification.pdf PDF
10 05 IDIQ attachment Section 02090 Control of Lead Based Paint Specification.pdf PDF
10 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming.pdf PDF
10 H 08 SECTION 01546 SAFETY AND HEALTH.pdf PDF
10 L 18 SOW ATT 14 PIB 21 06 PIV Card Management Training Final.pdf PDF
10 L 8 SOW ATT 4 Section 211313 GSA Guide Specification Wet Pipe Sprinkler.pdf PDF
10 H 06 Hazmat DC0092ZZ 2023 O M Inspection of Robert C Weaver.pdf PDF
10 L 0 SF18 Lafayette Elevator.pdf PDF
10 L 2 SOW 2023 10 11.pdf PDF
10 L 1 Table of Contents.pdf PDF
10 H 05 Hazmat Bulk Sampling Test Report Submittal_11 1 16.pdf PDF
10 09 ADM 2181 1 Homeland Security Presidential Directive 12 Personal Identity Verification for Contractor Employees.pdf PDF
10 02 IDIQ attachment Section 02085 Asbestos Abatement Procedures.pdf PDF
10 H 02 02090-ControlofLBP January_2013.pdf PDF
10 12 IDIQ attachment Past Performance.xlsx XLSX spreadsheet
10 National Elevator IDIQ RFP and Agreement 2024 03 17.pdf PDF
10 L 11 SOW AT 7 CIW Form.pdf PDF
10 L 16 SOW ATT 12 2019 REINSPECTION OF LAFAYETTE BLDG.pdf PDF
10 L 13 SOW ATT 9 Elevator Final Study DLR.pdf PDF
10 H 11 Weaver Building Elevator Study_100_ Submission_COMBINED_ALL.pdf PDF
10 H 04 Hazmat ASBESTOS-8987_FINAL CLEARANCE AIR MONITORING VISUAL INSPECTION REPORT_10 19 2015.pdf PDF
10 H 00 HUD Elevator Modernization Draft SOW.pdf PDF
10 H ZZ HUD Programatic Agreement signed.pdf PDF
10 10 IDIQ attachment Reps and Certifications.pdf PDF
10 INFORMATIONAL not official attachment GACA__GSAAffiliatedCustomerAccounts_May_2016v2.pdf PDF
10 04 IDIQ attachment Section 02087 Removal of Bird and Bat Droppings.pdf PDF
10 18 IDIQ attachment Task Order Pricing Sheet.xlsx XLSX spreadsheet
10 07 IDIQ attachment ADM 7002.1 GSA Smart Buildings.pdf PDF
10 H 03 CD Waste Mgmt Plan.xlsx XLSX spreadsheet
10 17 IDIQ attachment Small Business Participation Plan_SBPP_Template .docx DOCX document
10 13 Past Performance_Customer Surveys.pdf PDF
10 08 IDIQ attachment CIO 2180.2 GSA Rules of Behavior for Handling Personally Identifiable Information PII.pdf PDF
10 11 IDIQ attachment GSA 527 Contractors Qualifications and Financial Information.pdf PDF
10 L 12 SOW ATT 8 DB Schedule Detailed Small Project 07022018.pdf PDF
10 L 7 SOW ATT 3 Section 02090 REMOVAL AND DISPOSAL OF LEAD BASED PAINT.pdf PDF
10 L 19 Wage Determination.pdf PDF
10 L 15 SOW ATT 11 Key Sustaniable Products.pdf PDF
10 H 10 Vol2 1999 Robert C Weaver Fed Building Historic Structure Report.pdf PDF
10 H 07 Hazmat DC0092ZZ CONVERTERS ACM 1 23 07.pdf PDF
10 16 IDIQ attachment SF24 23a.pdf PDF
10 14 IDIQ attachment Bonding Insurance Geography Qualification Sheet.xlsx XLSX spreadsheet
10 00 IDIQ attachment NDA_Document_Security.pdf PDF
Show all 50

National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

Bid Spreadsheet for HUD Elevator Modernization
Color Key
Data Input
Options Calculated Amount
GSA Fixed Amount
CLIN 1Base ContractDesign & Construction Services for Elevator 1-8 Modernization
1aCost of the Design Work$ - 0
1bCost of Elevator 1-8 Modernization Work$ - 0
1cCost of Electrical Work (ELN Switchboards) in Car 1-8 Machine Room$ - 0
1dCost of Hazmat (Asbestos) Sampling and Abatement (PE 1-8, FE 18)$ - 0
1eGeneral Conditions$ - 0
1fInsurance & Bonds$ - 0
1gOverhead$ - 0
1hProfit$ - 0
Base Bid (Lump Sum, Firm Fixed Price)$ - 0
A1Alternate No. 1 - Removal and Installation of Elevator 1-8 Doors$ - 0
A2Alternate No. 2 - Salvage North Machine Room Equipment for Parts$ - 0
A5Alternate No. 5 - Elevator Sump Pit Plumbing and Electrical (PE 1-8, FE 18)$ - 0
$ - 0
Base Bid Alternates Subtotal$ - 0
Total Base Bid Price (including Alternates)$ - 0
CLIN 2Option 1Construction Services for Elevator 9-16 Modernization
2aCost of Elevator 9-16 Modernization Work$ - 0
2bCost of Electrical Work (ELS Switchboards) in Car 9-16 Machine Room$ - 0
2cCost of Hazmat (Asbestos) Sampling and Abatement (PE 9-16, FE 17)$ - 0
2dGeneral Conditions$ - 0
2eInsurance & Bonds$ - 0
2fOverhead$ - 0
2gProfit$ - 0
Option 1 (Lump Sum, Firm Fixed Price)$ - 0
A3Alternate No. 3 - Removal and Installation of Elevator 9-16 Doors$ - 0
A4Alternate No. 4 - Salvage South Machine Room Equipment for Parts$ - 0
A6Alternate No. 5 - Elevator Sump Pit Plumbing and Electrical (PE 9-16, FE 17)$ - 0
$ - 0
Option 1 Alternates Subtotal$ - 0
Total Option 1 Price (including Alternates)$ - 0
CLIN 3Option 2Construction Services for Elevator 19,20, 21, and 22 Modernization
3aCost of Elevator 19,20, 21, and 22 Modernization Work$ - 0
3bCost of Electrical - Emergency Switchgear and Associated Work$ - 0
3cGeneral Conditions$ - 0
3dInsurance & Bonds$ - 0
3eOverhead$ - 0
3fProfit$ - 0
Option 2 (Lump Sum, Firm Fixed Price)$ - 0
A7Alternate No. 7 - Elevator Sump Pit Plumbing and Electrical (FE 19, HSE 20-21)$ - 0
A8Alternate No. 8 - Demo Existing Generator and Install New Standby Generator$ - 0
$ - 0
$ - 0
Option 2 Alternates Subtotal$ - 0
Total Option 2 Price (including Alternates)$ - 0

Total Evaluated Overall Price with Options $ - 0

Overhead Pricing
Overhead % (Home Office)0%
Extended General Conditions Per Calendar Day (Field Office)$ - 0

: @christopher.cahoon@gsa.gov You don't necessarily need this. I included it when we were concerned about what year our Contract Options would be exercised in, however yours is more straightforward here. you don't really need them to fill out this number unless you truly want them to. They could push back.

_Assigned to christopher.cahoon@gsa.gov_

-Hallie Futterman - WPIANotes
See Specification 012400 and Construction Documents for descriptions of Options.
See Specification 012300 for descriptions of all Alternates. The alternates listed above should include the difference in cost as an add or deduct from the Total Construciton Phase Services for that Option.

Sheet1

PhaseDescriptionSetty Cost Estimate
CLIN 1/
Base ContractBase Contract will consist of elevator and electrical design for all elevators included in the “Study” and modernization of gearless passenger elevators 1-8 and geared freight elevator 18 per the studies recommendations Elevators 17 and 18 were modernized in 2017, however there are several issues called out in the study that should be addressed while the groups of elevators are in work. Electrical design shall include plans and specifications for standby and emergency power to include analysis and recommendations for the emergency generator and installation of a new emergency switchboard and electrical infrastructure associated with the elevators.$ 12,114,022.00
CLIN 2/
Option 1Option 1 will consist of modernization of gearless passenger elevators 9-16 and geared freight elevator 17 per the studies recommendations. Elevators 17 and 18 were modernized in 2017, however there are several issues called out in the study that should be addressed while the groups of elevators are in work.$ 16,765,362.00
CLIN 3/
Option 2Option 3 will consist of modernization of hydraulic freight elevator 19, hydraulic passenger elevators 20 and 21, vertical wheelchair lift elevator 22 located in the penthouse as well as all work associated with standby and emergency power as they relate to elevators 20 and 21 per the study.$ 6,324,318.00
$ 35,203,702.00

File details come from the government source that posted it. Updated .