10 H 04 Hazmat ASBESTOS-8987_FINAL CLEARANCE AIR MONITORING VISUAL INSPECTION REPORT_10 19 2015.pdf
PDF 6 MB Posted
- Solicitation number
- 47PM1124R0011
About this file
This document contains a federal contract opportunity notice for an indefinite delivery/indefinite quantity contract for elevator modernization and construction task orders over $1 million. The General Services Administration intends to award this IDIQ to up to six vendors for a one year base period and four one-year options with a total maximum value of $650 million. Small businesses are eligible as defined by NAICS code 238290 with a size standard of $22 million. Questions on the draft solicitation are due by April 11, 2024 with responses incorporated into the final solicitation releasing on or around April 19, 2024. The initial task order attachments are provided in Google folders for review.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structural Engineering Group, Inc. 21135 Whitfield Place, #201 • Sterling, Virginia 20165 Engineering/Design-Build/Construction Tel (703) 574-4813• fax (703) 579-0074
WWW.SEG-INC.COM
Submittal Cover Sheet
To:
From:
Mark Haase Quality Control Manager Ling Qu, SEG
Project Name: West Plaza & Loading Dock Repairs Robert C. Weaver Federal Building
Contract Number: GS-11P-15-YT-C-0019 Project Number: 00759-0059 Submission Date: October 15, 2015
Item Spec.
Submittal No. Spec. Para. Item Name Item Description Pages: Submitte d for: Submitted: RESPONSE:
1 020850-01 1.4A.1 Five Projects Five projects completed by Power Component systems 2 Approval
2 020850-01 1.4A.2 Five Air Tests 5 Test Reports 3-40 Approval
3 020850-01 1.4A.3, 1.4A.4
Qualification of Supervisor/Wor kers Resumes for PMs and Supervisors 41-44 Approval
4 020850-01 1.4A.3, 1.4A.4, 1.4A.5
License/Qualific ations
Licenses and qualifications for supervisor and worker 45-57 Approval
Notes:
1. Products submitted for “Approval” require review and response.
Reviewed and Submitted by: Ling Qu, Structural Engineering Group (SEG)
Remarks:
Subcontractor: Power Component Systems
Five Asbestos Projects
AOC Small Arms Firing Range Washington, DC John MacDonald / Kiewit Building Group, Inc.
703-415-2689 x 2966
GPO C-736
Washington, DC D. Kevin McGuinness / GPO 202-512-1626
WNY Energy Projects Washington, DC Claudio Nally / Corinthian Contractors, Inc.
301-568-6510
GPO Building A 7th Floor & Building D 3rd Floor Washington, DC
GPO
D. Kevin McGuinness / GPO 202-512-1626
Carl Moultrie 2nd Floor West Washington, DC Brian Orndorff / Forrester 301-255-0346
020850-01
AirMatrix
08/13/15Received
PO Number:Number: 50863
Customer: PCS Power Component Systems, Inc (4120)
Project: GPO Room 736
Hanover, MD 21076
Order #: 139371 Address: 7526-R Connelley Drive
Attn:
Reported 08/14/15
Analyzed
Location: 732 N Capitol St NW
08/14/15
2512 W. Cary Street • Richmond, Virginia • 23220-5117 804-353-6778 • 800-785-LABS (5227) • Fax 804-359-1475
Schneider Laboratories Global, Inc Analysis Report
Density
(f/mm²)
Exposure
(f/cc) Cust. IDSample ID Location Date Time Vol. Fibers
(f/field)
NIOSH 7400 Issue 2 Aug. 12 1994Method
30 Min
TWA (f/cc)
8 Hr
TWA (f/cc)
<7.01 <0.0360<0.055008/06/15 30 min 75.0 L139371-001 1 Clean Pipes/Glove Bags
<7.01 <0.00514<0.055008/06/15 210 min 525 L139371-002 2 Clean Pipes/Glove Bags
<7.01 <0.0180<0.055008/06/15 60 min 150 L139371-003 3 Clean Pipes/Glove Bags
<0.00675Vasquez, E.
Microscopy Supervisor
Reviewed By:
Analyst: Hashim, Reel
139371-08/14/15 02:14 PM
Hind Eldanaf Sr
Analyst Sr
RangeInitials
5 0.182RBH 20-
20.5 0.15850-
50.5 0.0747100-
Personal and/or Excursion Samples. OSHA Asbestos PELs are 1.0 f/cc for 30 min excursion and 0.1 f/cc for 8 hour TWA. Est. limit of detection: 7 f/mm² or 0.055 f/field. (<) refers to less than limit of detection. Results are not blank-corrected unless noted by analyst. Exposure calculations are based on client-supplied information and assume zero exposure for time not sampled. Analyst relative standard deviation (Sr) calculated using historical data. Calculated values are reported to three significant figures. The test results reported relate only to the samples submitted.
Accrediting bodies: AIHA-LAP, LLC 100527
Job# 40-36-01 - May 21, 2015
June 9, 2015
Mr. D. Kevin McGuiness US Government Printing Office 732 North Capitol Street, NW Washington, DC 20401
Re: Asbestos Abatement Project Monitoring
US Government Printing Office (GPO) Building B - 2nd Floor – Room #D219 732 North Capitol Street, NW Washington, DC 20401
Dear Mr. McGuiness:
Enclosed is data produced through the industrial hygiene monitoring of the asbestos abatement project performed at GPO, Building B – 2nd Floor – Room #D219, 732 North Capitol Street, NW, in Washington, DC, that took place on May 21, 2015.
1.0 PROJECT SUMMARY
This project involved an asbestos abatement action performed by PCS. Maxximus Environmental, Inc. (Maxximus) provided fiber-in-air monitoring and industrial hygiene oversight during the asbestos abatement. Asbestos abatement work practices observed were performed in a manner consistent with the requirements of Title 29 of the Code of Federal Regulations (CFR) 1926.1101, the Occupational Safety and Health Administration’s (OSHA) asbestos construction standard. Abatement activities were supervised by Mr. Elvin Ventura with one worker onsite.
Building B – 2nd Floor – Room #D219 - Abatement involved the removal of approximately 20 LF of pipe insulation with two (2) asbestos containing mudded elbows/pipe fittings.
The removal activities occurred within a negative pressure glove bag and enclosure, with negative air provided using high-efficiency particulate air (HEPA) filtration devices and vacuums. Workers wore disposable, full-body coveralls and half-face, air-purifying respirators with HEPA cartridges during removal activities.
Mr. Kevin McGuiness
Job# 40-36-01 – May 21, 2015
2.0 SAMPLING AND ANALYTICAL PROTOCOL
Maxximus performed air monitoring and provided industrial hygiene oversight. Air samples were collected before, during and after abatement activities from locations inside the work area.
Maxximus collected air samples and analyzed them using National Institute for
Occupational Safety and Health (NIOSH) Method 7400 which uses 25 millimeter (mm), 0.8 microgram (m), mixed cellulose ester filters (MCEFs), calibrated sampling pumps, and phase contrast microscopy (PCM). Samples were analyzed on site by NIOSH 582-trained analysts Mr. James Robinson. Maxximus analysts participate in the American Industrial Hygiene Association (AIHA) proficiency analytical testing (PAT) program and are currently rated proficient for asbestos. (Please see below, for specific sample locations,)
GPO – Building B – 2nd Floor – Room #D219, 732 N. Capitol St, NW, Washington, DC
Date:
Sample ID
Material Abated:
Location:
F/CC
Cassette
Type
Area Clearance
Cleared/Fail
05/21/15
A5 & A6
20 LF of pipe insulation and two asbestos containing mudded elbows
Inside
Containment – 2nd Floor –
Room #D219
<0.01
(2)
PCM
CLEARED
3.0 SUMMARY OF RESULTS
Outside enclosure samples collected in the vicinity of the containment during abatement activities revealed an airborne fiber concentrations of less than 0.01 fiber per cubic centimeter (<0.01 f/cc) of air.
Final clearance samples collected in the work areas after abatement activities showed airborne fiber concentrations of <0.01 f/cc, which meets the District of Columbia and U.S.
Environmental Protection Agency (EPA)-recommended re-occupancy level after an abatement action.
Final clearance inspection of the work area showed that the areas were free of visible debris.
Mr. Kevin McGuiness
Job# 40-36-01 – May 21, 2015
Maxximus is pleased to have had the opportunity to provide these services to GPO. If you have any questions or comments, please contact us.
Sincerely, Khadijah A. Muse VicePresident
Job #40-36-01 - May 21, 2015
Daily Project Summary Sheet
Maxximus Environmental, Inc.
NIOSH 7400 Phase Contract Microscopy (PCM) Report
Client: GPO Job Number: 40-36-01
Client's Address: 732 N. Capitol Street, NW Asbestos Safety Technician: James Robinson
Washington, DC Sampling and Analytical Method: NIOSH 7400 (Issue 2, 08/15/94)
Project: GPO - 2nd Flr - Rm #D219 Telephone Number: 301-838-2730
Project's Address: Washington, DC Sampling Date: May 21, 2015
Contractor: S/A Client On site: X Lab:
Contractor Telephone:
Field Location or Sample Duration Air Fibers TWA
Identification Employee/SSN Type (mins.) (liters) per cc (f/cc)
052115-GPO-JR-A1 Field blank BLK NFO
052115-GPO-JR-A2 Field blank BLK NFO
052115-GPO-JR-A3 Abatement Area Rm #D219 IE 100 1,000 <0.01
052115-GPO-JR-A4 Front of Doorway OE 103 1,030 <0.01
052115-GPO-JR-A5 Room #D219 IEF 60 900 <0.01
052115-GPO-JR-A6 Room #D219 IEF 60 900 <0.01
COMMENTS/OBSERVATIONS/ACTIVITIES/CONDITIONS:
ABBREVIATIONS:
ARE = area sample CR = clean room IE = inside enclosure OE = outside enclosure BLK = QC field blank EX = microtrap exhaustIEF = final clearance PRE = background sample BZ = personal breathing zone GBA = glovebag area NFO = no fibers observed in 100 fields
Data Reviewed By: ________________________________________ Results expressed with a "<" symbol are below the limit of detection for the volume of air collected. Laboratory Quality Control data is available at the client's request.
H P E N V I R O N M E N T A L
I N C O R P O R A T E D
104 Elden Street Herndon, VA 20170
Herndon, Virginia 20170
Phone: 703•471•4200 Facsimile: 703•471•0020
Facsimil
Industrial Hygiene • Toxicology • Environmental Sciences Laboratories & Consultants
March!24,!2015!
Mr.!Mike!Schmidt!
Power!Component!Systems!
7526!Connelley!Drive!
Suite!R!
Hanover,!MD!21076!
Re:! Asbestos!Abatement!–!Rayburn!House!Office!Building!Garage!GN1!Level!Future!Small!
Arms!Firing!Range!!
Dear!Mr.!Schmidt:!!
Industrial!hygiene!inspections!and!air!monitoring!were!conducted!by!HP!Environmental,!
Inc.!(HPE)!during!the!removal!of!limited!quantities!of!asbestos!containing!drain!pipe!mud!
fitting!insulation!and!gray caulking material within steel pipe barrier on concrete columns!at!
the!Rayburn!House!Office!Building!Garage!GN1!Level!located!on!Independence!Avenue!
between!First!Street!SW!and!South!Capitol!Street!in!Washington,!DC.!!The!materials!that!
were!removed!consisted!of:!
Location:! Asbestos!Containing!Material!Removed:!
GN1!Level!Garage!Future!Firing!Range! AsbestosNcontaining!pipe!mud!fitting!
insulation!(24!elbows)!
GN1!Level!Garage!Fan!Room! AsbestosNcontaining!pipe!mud!fitting!
insulation!(4!elbows)!
GN1!Level!Garage!Carpenter!Storage!room! AsbestosNcontaining!pipe!mud!fitting!
insulation!(1!elbow)!
GN1!Level!Garage!Outside!Carpenter!Storage!
room!
AsbestosNcontaining!pipe!mud!fitting!
insulation!(1!elbow)!
GN1!Level!Garage!Future!Firing!Range! Caulk!on!concrete!columns!with!steel!pipe!
barrier!(20!LF)!
March!24,!2015!
Power!Component!Systems!
RE:!Asbestos!Abatement!
Rayburn!House!Office!Building!Garage!GN1!Level!!
Page!N!2!
Herndon, Virginia 20170
Laboratories & Consultants
During!the!abatement!process,!inside!and!outside!work!area!samples!were!collected!that!
document!that!abatement!activities!did!not!contaminate!areas!outside!of!the!protective!
barriers!(Regulated!Area).!!Personal!air!samples!were!also!collected!during!the!abatement!
process!on!workers!performing!different!tasks.!!Air!samples!were!analyzed!according!to!
the!specified!National!Institute!of!Occupational!Safety!and!Health!(NIOSH)!7400!method!
"A"!rules.!Samples!were!collected!on!0.8!micronNmixed!cellulose!ester!filters!using!25N millimeter!openNfaced!cassettes.!!Air!sample!results!can!be!compared!against!clean!air!
standards!established!by!OSHA!and!EPA.!OSHA's!permissible!exposure!limit!is!0.1!fibers!
per!cubic!centimeter!of!air.!The!currently!accepted!"cleanNair"!level!is!0.01!fibers!per!cubic!
centimeter!of!air.!!All!samples!met!these!criteria.!!See!attached!Certificate!of!Laboratory!
Analysis!#s!153278,!153279,!153280!&!153283!for!details.!!!
Before!the!abatement!work!area!was!broken!down,!a!final!visual!inspection!was!conducted!
and!final!air!samples!were!collected!inside!each!regulated!area.!The!inspected!areas!were!
found!to!be!in!satisfactory!condition!(i.e.!visibly!clean!of!mastic!scheduled!for!removal)!and!
the!results!of!the!air!samples!were!in!compliance!with!the!District!of!Columbia!criteria!!!
Furthermore,!all!observed!work!was!performed!in!a!manner!consistent!with!the!project!
specific!Work!Plan!(revision!3;!February!26,!2015).!!
Current!District!of!Columbia!asbestos!regulations!require!final!TEM!clearance!sampling!in!!
accordance!with!the!US!EPA’s!AHERA!regulations!(40CFR!763!Subpart!E!Appendix!A)!for!
asbestos!abatement!projects!that!are!NESHAP!size!or!larger.!!Under!current!US!EPA!
NESHAP!regulations!(40!CFR!61,!subpart!M)!a!“NESHAP!sized!project”!is!an!asbestos!
project!involving!the!removal!of!asbestos!in!quantities!>160!square!feet!or!>260!linear!feet!
or!>35!cubic!feet.!!The!removal!of!the!mudded!elbows!and!caulking!materials!did!not!
exceed!the!NESHAP!quantities,!thus!final!sampling!was!conducted!using!the!District!of!
Columbia’s!PCM!clearance!requirements,!which!is!two!(2)!final!PCM!samples!per!2,500!
square!feet!of!containment!area.!All!final!PCM!samples!must!be!below!0.01!f/cc!in!order!for!
the!containment!to!be!considered!cleared!(see!enclosed!Certificate!of!Laboratory!Analysis!
#s!153281!&!153282).!!
All!asbestos!contaminated!waste!collected!from!the!Rayburn!House!Office!Building!GN1!
Level!Garage!in!Washington,!DC!on!March!10N11,!2015!abatement!work!was!removed!by!
March!24,!2015!
Power!Component!Systems!
RE:!Asbestos!Abatement!
Rayburn!House!Office!Building!Garage!GN1!Level!!
Page!N!3!
Herndon, Virginia 20170
Laboratories & Consultants
Power!Component!Systems!and!taken!to!a!certified!landfill.!!Power!Component!Systems!is!
responsible!for!providing!the!building!owner!with!a!signed!copy!of!the!waste!manifest(s).!
All!personnel!conducting!this!abatement!operation!had!all!required!training!and!were!
medically!cleared!to!perform!this!type!of!work!in!accordance!with!OSHA,!EPA!regulations!
and!all!State!and!Local!laws,!rules!and!regulations.!
Note!that!the!following!asbestosNcontaining!materials!still!remain!within!this!area!and!
should!not!be!intentionally!disturbed!and!appropriately!flagged/labeled!to!prevent!
disturbance.!
Location:! Remaining!Asbestos!Containing!Material!&!
Quantity:!
GN1!Level!Garage!Future!Firing!Range! Fire!suppression!stand!pipe!insulation!–!5!Lf!
GN1!Level!Garage!Future!Firing!Range! Caulk!(gray)!–!concrete!wall!expansion!joint!
(NOT!TO!BE!REMOVED)!
GN1!Level!Garage!Future!Firing!Range! Black HVAC vibration dampener (assumed) (2 units)
GN1!Level!Garage!Future!Firing!Range! Fire Doors (assumed) (3 units) Sliding fire door (assumed) (1 unit)
At!this!time!HPE!certifies!that!the!specified!work!is!complete!and!the!area!is!approved!for!
reNoccupancy!by!normal!construction!trades.!
Respectfully!Submitted,!
HP!Environmental,!Inc.!
Brent!Sharrer,!M.S.,!CIH!
Director!of!Industrial!Hygiene!Services!
Herndon, Virginia 20170
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153278 Page 1 of 2
Certificate of Laboratory Analysis
Rayburn Bldg. G-1 Level Future Shooting Range
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-01 HPE Sample Number:
Collected:Air (710 L)
153278-01 03/10/15
Area Sample, Westside of future Shooting Range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0048 f/cc 0.0048 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-02 HPE Sample Number:
Collected:Air (712 L)
153278-02 03/10/15
Area Sample, Center of Future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0048 f/cc 0.0048 NFO
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-03 HPE Sample Number:
Collected:Air (710 L)
153278-03 03/10/15
Area Sample, Eastside of future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0048 f/cc 0.0048 BRL
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-04 HPE Sample Number:
Collected:Air (710 L)
153278-04 03/10/15
Area Sample, Outside entrance to future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0048 f/cc 0.0048 NFO
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153278 Page 2 of 2
Certificate of Laboratory Analysis
Rayburn Bldg. G-1 Level Future Shooting Range
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
5. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-05 HPE Sample Number:
Collected:Air (712 L)
153278-05 03/10/15
Area Sample, Outside future shooting range NW Corner
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0048 f/cc 0.0048 NFO
6. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-06 HPE Sample Number:
Collected:Air (0 L)
153278-06 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
7. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-030915-07 HPE Sample Number:
Collected:Air (0 L)
153278-07 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
Laboratory Director
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153279 Page 1 of 2
Certificate of Laboratory Analysis
Rayburn, Washington, DC
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-01 HPE Sample Number:
Collected:Air (600 L)
153279-01 03/10/15
Area sample, G1 Level garage, West side of future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0057 f/cc 0.0057 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-02 HPE Sample Number:
Collected:Air (606 L)
153279-02 03/10/15
Area sample, G1 Level garage, Center of future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0057 f/cc 0.0057 BRL
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-03 HPE Sample Number:
Collected:Air (606 L)
153279-03 03/10/15
Area sample, G1 Level garage, East side of future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0057 f/cc 0.0057 NFO
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-04 HPE Sample Number:
Collected:Air (610 L)
153279-04 03/10/15
Area sample, G1 Level garage, Outside decon to futureshooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0056 f/cc 0.0056 BRL
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153279 Page 2 of 2
Certificate of Laboratory Analysis
Rayburn, Washington, DC
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
5. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-05 HPE Sample Number:
Collected:Air (608 L)
153279-05 03/10/15
Area sample, G1 Level garage, NW Corner, Outside future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0056 f/cc 0.0056 NFO
6. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-06 HPE Sample Number:
Collected:Air (0 L)
153279-06 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
7. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031015-07 HPE Sample Number:
Collected:Air (0 L)
153279-07 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153280 Page 1 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., Garage G1 Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031115-01 HPE Sample Number:
Collected:Air (506 L)
153280-01 03/11/15
Area sample, future shooting range, West side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0068 f/cc 0.0068 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031115-02 HPE Sample Number:
Collected:Air (506 L)
153280-02 03/11/15
Area sample, future shooting range, Central side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0068 f/cc 0.0068 BRL
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031115-03 HPE Sample Number:
Collected:Air (506 L)
153280-03 03/11/15
Area sample, future shooting range, East side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0068 f/cc 0.0068 NFO
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031115-04 HPE Sample Number:
Collected:Air (2778 L)
153280-04 03/11/15
Area sample, outside entrance of future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0012 f/cc 0.0012 NFO
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153280 Page 2 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., Garage G1 Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
5. Client Sample No.:
Sample Matrix:
Sample Location:
pcm-031115-05 HPE Sample Number:
Collected:Air (496 L)
153280-05 03/11/15
Area sample, future shooting range, NW Corner
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0069 f/cc 0.0069 BRL
6. Client Sample No.:
Sample Matrix:
Sample Location:
pcm-031115-06 HPE Sample Number:
Collected:Air (0 L)
153280-06 03/11/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
7. Client Sample No.:
Sample Matrix:
Sample Location:
pcm-031115-07 HPE Sample Number:
Collected:Air (0 L)
153280-07 03/11/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153281 Page 1 of 3
Certificate of Laboratory Analysis
Rayburn Bldg., Washington, DC
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-01F HPE Sample Number:
Collected:Air (615 L)
153281-01 03/10/15
Working final, Garage G1 level, Carpentry room
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0056 f/cc 0.0056 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-02F HPE Sample Number:
Collected:Air (1020 L)
153281-02 03/10/15
Working final, Garage G1 Level, outside backside of carpentry door
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0034 f/cc 0.0034 BRL
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-03F HPE Sample Number:
Collected:Air (765 L)
153281-03 03/10/15
Working final, Garage G1 Level, Future Shooting Range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0045 f/cc 0.0045 BRL
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-04F HPE Sample Number:
Collected:Air (1200 L)
153281-04 03/10/15
Final clearance, Garage G1 Level, future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0029 f/cc 0.0029 BRL
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153281 Page 2 of 3
Certificate of Laboratory Analysis
Rayburn Bldg., Washington, DC
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
5. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-05F HPE Sample Number:
Collected:Air (1215 L)
153281-05 03/10/15
Final clearance, Garage G1 level, Future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0028 f/cc 0.0028 BRL
6. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-06F HPE Sample Number:
Collected:Air (1200 L)
153281-06 03/10/15
Final clearance, Garage G1 level future shooting range
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0029 f/cc 0.0029 BRL
7. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-07F HPE Sample Number:
Collected:Air (0 L)
153281-07 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
8. Client Sample No.:
Sample Matrix:
Sample Location:
PCM-031015-08F HPE Sample Number:
Collected:Air (0 L)
153281-08 03/10/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153281 Page 3 of 3
Certificate of Laboratory Analysis
Rayburn Bldg., Washington, DC
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/10/15
Project Location:
Date Reported: 03/16/15
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153282 Page 1 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., G1 Garage Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-01F HPE Sample Number:
Collected:Air (1215 L)
153282-01 03/11/15
Final clearance, Future shooting range, west side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0028 f/cc 0.0028 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-02F HPE Sample Number:
Collected:Air (1200 L)
153282-02 03/11/15
Final clearance, Future shooting range, central side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0029 f/cc 0.0029 BRL
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-03F HPE Sample Number:
Collected:Air (1215 L)
153282-03 03/11/15
Final clearance, Future Shooting range, West side
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0028 f/cc 0.0028 BRL
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-04F HPE Sample Number:
Collected:Air (0 L)
153282-04 03/11/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153282 Page 2 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., G1 Garage Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
5. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-05F HPE Sample Number:
Collected:Air (0 L)
153282-05 03/11/15
BLANK
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 8.9 f/mm2 8.9 NFO
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153283 Page 1 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., Garage G1 Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
1. Client Sample No.:
Sample Matrix:
Sample Location:
PCS- 031015-01P HPE Sample Number:
Collected:Air (964 L)
153283-01 03/11/15
Personal sample, future shooting range, Odilio Martinez, Various abatement activities
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0036 f/cc 0.0036 BRL
2. Client Sample No.:
Sample Matrix:
Sample Location:
PCS- 031015-01P HPE Sample Number:
Collected:Air (60 L)
153283-02 03/11/15
Personal sample, future shooting range, Kelly Woodwin, Fitting Abatement
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.057 f/cc 0.057 NFO
3. Client Sample No.:
Sample Matrix:
Sample Location:
PCS- 031015-02P HPE Sample Number:
Collected:Air (60 L)
153283-03 03/11/15
Personal sample, future shooting range, Odilio Martinez, Caulk Abatement
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.057 f/cc 0.057 BRL
4. Client Sample No.:
Sample Matrix:
Sample Location:
PCS-031115-03P HPE Sample Number:
Collected:Air (450 L)
153283-04 03/11/15
Personal Sample, Future shooting range Glenda, Waste bagging
Asbestos & other Fibers by PCM - Asbestos Fiber Ct., "A" Rules
NIOSH 7400
Preparation Method:
Analysis Method:
NIOSH 7400 Prepared:
Analyzed:
See footnotes:
Container Tested: 25 mm 0.8 µ MCE
Analyte Result Units Reporting Limit Qualifier
Prepared By:
Analyzed By:
03/11/15 03/11/15
AS
AS
Fibers < 0.0076 f/cc 0.0076 NFO
703 • 471-4200 703 • 471-0020
Phone:
Facsimile:
www.hpenviron.com
H P E N V I R O N M E N T A L I N C O R P O R A T E D
Report Number: 153283 Page 2 of 2
Certificate of Laboratory Analysis
Rayburn Bldg., Garage G1 Level
Power Component Systems Attn: Michael Schmidt 7526 Connelley Drive Suite R Hanover, MD 21076
Date Received: 03/16/15
Project Location:
Date Reported: 03/16/15
Report Notes:
(1) Results are not corrected for field blanks.
BRL Some fibers were observed but at a concentration below the reporting limit of the analytical method.
NFO NFO = No fibers were observed within the 100 counting fields analyzed.
R. Hugh Granger, Ph.D.
CLIENT: PCS DATE: 03-09-15 PCM 7
PROJECT Rayburn Future Shooting Range SITE MONITOR: Tenzin Gonshar PLM
PROJECT MANAGER: Brent Sharrer TEM
SITE LOCATION: Rayburn Bldg., Washington
DC
PROJECT DIRECTOR:
Piotr Chmielinski
ABATEMENT
CONTRACTOR: PCS CONTRACTOR’S ON-
SITE SUPERVISOR: Kelly Goodwin
# CONTRACTOR’S
WORKERS ON-SITE: 3
Time Summary of Activities 1945 HPE on site. HPE meets Kiewit representative Ms. Lisa Thomson and PCS supervisor Mr. Kelly
Goodwin on G-1 level future shooting range area.
2000 HPE walks site with PCS & Kiewit representatives. PCS supervisor informs HPE that they will be removing only the fittings and the caulk this week. Vibration dampener, standpipe and fire doors will be removed later. PCS supervisor also informs HPE that they will removing six extra pipe fittings (four in the garage fan room, one in the carpenter storage room and one outside the carpenter storage room in the NW corner of G-1 level garage).
2100 Three PCS workers started to hang glove bag on fittings in the future shooting range area. HPE calibrates five low volume pumps and sets up five area samples during the process of hanging glove bags.
2200 PCS continues work.
2300 Workers continue to hang glove bags without incident.
0000 Workers take lunch break.
0130 Workers resumes work. Workers are hanging glove bags in the fan room.
0230 One worker is hanging a glove bag in the carpenter storage room and one in the NW corner of the garage.
0245 HPE collects all area samples and analyzes the samples.
0330 All area samples area acceptable.
0430 HPE completes paper work and leaves site.
HP Environmental Representative
CLIENT: PCS DATE: March 10-11, 2015 PCM 16
Range
SITE MONITOR: A. Smalley PLM 0
PROJECT MANAGER: J. Edwards TEM 0 SITE LOCATION: Rayburn Bldg., Washington
DC
PROJECT DIRECTOR:
B. Sharrer
ABATEMENT
CONTRACTOR:
Power Component Systems
(PCS)
CONTRACTOR’S ON-
SITE SUPERVISOR:
Kelly Goodwin
# CONTRACTOR’S
WORKERS ON-SITE:
2000 HPE (A. Smalley and T. Gonshar) arrive on site along with PCS. Today’s work will consist of glove bagging elbows in the future shooting range area as well as select glove bags in the carpentry room area.
2100 T. Gonshar has oriented A. Smalley to the job site and HPE proceeds to smoke test the pre-hung glove bags installed last night. HPE verifies that all glove bags are sealed and no smoke escapes.
2130 Mr. Gonshar off site. HPE places five area samples around the work area. PCS is currently finishing minor prep work needed in the main work area.
2230 Work begins in the carpentry room (two workers here to do the glove bags) and one worker begins to work inside the larger work area. HPE begins working finals in the carpentry glove bag areas.
2345 Glove bags associated with carpentry room are finished, HPE inspects for visual completion and finds each area free of any asbestos debris. HPE collects working final samples. PCS begins glove bags within the fan room. HPE begins a working final sample within the fan room.
0045 Fan room glove bags completed, HPE inspects to find fittings to be free of asbestos debris. HPE takes down the working final.
0130 PCS takes lunch break. Final samples have been analyzed and all are below the 0.01 f/cc limit and pass. PCS may remove barrier tape and signs from these areas.
0200 Work within the future shooting range work area resumes. HPE will conduct inspection of the progress of work around 3 AM and run final samples for the night to allow other work trades into the area during the day. All left over fitting/glove bags will be completed during the 3/11/15 night.
0300 HPE begins clearance sampling within the future shooting range area as well as inspecting PCS’s work.
0400 HPE collects clearance sampling. PCS’s work areas are visibly clean. HPE will now analyze the clearance samples.
0430 Clearance samples pass, PCS removes decon and signs for other trades. All remaining abatement will be done during the night of 3/11/15. HPE and PCS off site.
CLIENT: PCS DATE: March 11-12 2015 PCM 15
Range
SITE MONITOR: A. Smalley PLM 0
PROJECT MANAGER: J. Edwards TEM 0 SITE LOCATION: Rayburn Bldg., Washington
DC
PROJECT DIRECTOR:
B. Sharrer
ABATEMENT
CONTRACTOR:
Power Component Systems
(PCS)
CONTRACTOR’S ON-
SITE SUPERVISOR:
Kelly Goodwin
# CONTRACTOR’S
WORKERS ON-SITE:
2000 HPE and PCS arrive on site to complete abatement within the future shooting range site.
2030 PCS enters the future shooting range to complete elbow/caulking removal. HPE sets up area samples around the work area.
2230 Work continues without interruption. HPE runs personal 30-minute samples on the PCS workers.
2300 Personal samples collected.
2320 HPE conducts a final visual inspection of the work area as PCS has completed the remaining glove bags and three locations of caulking. HPE finds the areas free of any asbestos debris (Note: there are vibration dampeners and an elbow still within the room. This elbow is behind the duct and PCS is unable to secure a glovebag around it). HPE begins final clearance air sampling.
0040 HPE collects final clearance air samples.
0120 All samples taken today (final clearance, area, and personals) are below the 0.01 f/cc limit and pass.
PCS may tear down the work area.
0200 PCS and HPE off site.
Brian J. Lawton Brian@Powercomponentsystems.com
(410) 218-9638
EDUCATION
University of Maryland, Baltimore County - Graduated in May 2002
Bachelor of Arts Geography
WORK EXPERIENCE
Power Component Systems, Inc.
General Manager – 2006 - Present
Oversee construction, estimating and sales personnel
Supervise management and field personnel
Billing, accounts receivable and payable
Pay roll approval and processing
Contract review and approval
Set up the schedule of manpower
Oversight of budget cost, etc.
Project Management/Estimating – 2005 – 2006
Responsible for bidding and securing work
Executing work in a safe, and timely matter
Writing safety and work plans
Attend pre-bids and pre-con meetings
Business Development Manager - 2003 – 2005
Cold calling new and potential clients
Maintaining rapport with existing clients
Manage bid calendar for estimates
Develop sales and marketing annual plan
Purchasing Manager – 2002 - 2003
Keeping accurate inventory of materials and equipment
Managing fleet vehicles, and warehouse
Monitor vendor pricing
Monitor jobsite deliveries
Gene Rush 1
Gene Rush Phone: (410) 371-6513
QUALIFICATIONS
Education - Thomasville Vo-Tech - Graduated in 1981
Licenses / Certifications -
• OSHA 30
• Confined Space Entry and Awareness Training
• Lead Abatement Supervisor licensed in the states of MD, and VA
• Lead Renovations & Repair Certification
• EPA AHERA Asbestos Abatement Supervisor licensed in the states of: MD, VA, DC, and WV
• Scaffold Safety Certified
• Fall Protection Certified
• Electrical Safety Certified
Senior Superintendent – 1988 - Present
Oversee field workers with crews between five and 40 workers Executing work in a safe, and timely matter
Project Experience
Army Reserve Center – Curtis Bay, MD Arriba Corporation – Travis Perry – 703-212-8024 February 2015 – Present $144,000 Selective Demolition and Asbestos Abatement
FBI Building 9 Lower Level - Quantico, VA Signature Renovations – Jerry Elmore - 703-354-1696 December 2014 – February 2015 $380,000 Asbestos Abatement, Selective Demolition and PCB Removal
FBI Building 9 - Quantico, VA Signature Renovations – Jerry Elmore – 703-354-1696 April 2014 - September 2014 $114,000 Selective Demolition and Asbestos Abatement
Flagger Force – Glen Burnie, MD
Keystruct Construction – Mike Sola – 717-764-1326 December 2013 - March 2014 $65,000 Selective Demolition
Gene Rush 2
BWI Airport Concourse C Widening – Hanover, MD Hunt Construction – Patrick Wipperman – 203-401-9214 December 2012 – May 2014 $764,000 Selective Demolition, Asbestos Abatement and Lead-based Paint Removal
US Naval Academy – Gymnasium – Annapolis, MD NICC jv – Courtney Severy - 301-440-6305 December 2011 – March 2012 $45,000 Mercury Removal and Selective Demolition
National Air Station – Dental Clinic – Patuxent River Allen & Shariff Construction Services, LLC– Mike Schooler - 443-545-1200 January 2012 – March 2012 $116,000 Asbestos Abatement
Locke Insulators – Baltimore, MD Locke Insulators – Charles Fader - 410-347-1749 1999 – Present $1 Million+ Asbestos Abatement
Mike Schmidt mikes@Powercomponentsystems.com
(410) 627-9683
EDUCATION
Lynchburg College - Graduated in May 2010 Bachelor of Arts Business Administration
Project Manager – 2013 - Present
Oversee construction, estimating and sales personnel Supervise management and field personnel Billing, accounts receivable and payable Pay roll approval and processing Contract review and approval Set up the schedule of manpower Oversight of budget cost, etc.
Estimator – 2010 – 2013 Responsible for bidding and securing work Executing work in a safe, and timely matter Writing safety and work plans Attend pre-bids and pre-con meetings
| HUD Blank Submittal Coverpage |
| 020850-01 (1.4A.1) Five Asbestos Projects |
| 020850-01 (1.4A.2) 50632 HE Consulting Asb Final Report 11.1.14 |
| 020850-01 (1.4A.2) 50723 Asb Testing 10.10.15 |
| 020850-01 (1.4A.2) 50863 GPO Room 736 Asb P 8.6.15 |
| 020850-01 (1.4A.2) Completed Report 40-36-01 - GPO Bldg B 2nd Floor Rm D219 052115 |
| 020850-01 (1.4A.2) LTR PCS Abatement Within Future Small Arms Firing Range March 2015 |
| 020850-01 (1.4A.3, 1.4A.4) Qualifications |
| Brian Resume |
| Gene Resume |
| Mike Schmidt |
| 020850-01 (1.4A.5) License information |
| 020850-01 (1.4A.5) License information |
| DC Asb 7.31.17 s |
| DC Asb 7.31.17 w |
| Asb Cert 9.14.16 s |
| Asb Cert 11.26.15 w |
| Fit 3.2.16 GR |
| Fit 3.2.16 Gwen |
| Physical 9.24.16 |
| Physical Full 4.24.16 |
File details come from the government source that posted it. Updated .