10 06 IDIQ attachment PIB 18 02 Attachment 6 File Naming.pdf
PDF 32 KB Posted
- Attached to
- National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million Federal contract opportunity
- Solicitation number
- 47PM1124R0011
About this file
This document provides file naming requirements and sample file names for documents related to a federal indefinite delivery/indefinite quantity (IDIQ) contract for elevator construction and modernization task orders valued over $1 million. The General Services Administration (GSA) intends to award the IDIQ for a period of one base year and four one-year options with a maximum value of $650 million. The solicitation will be a full and open competition issued on or around April 19, 2024. Two initial task order solicitations will be released concurrently. Questions and comments on the draft solicitation and task order attachments are due by April 11, 2024. Responses should identify the solicitation section or attachment being referenced.
View the file
Other files for this federal contract opportunity
Show all 50
National Elevator Modernization & Construction IDIQ for Task Orders over $1 Million has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIB 18-02 Attachment 6 1 04/19/2018
PBS EASi/EDMS FILE NAMING REQUIREMENTS
Documents posted in the official electronic contract file system are part of the contract file and accessible by multiple parties within PBS.
Access to contents of the file will be determined by the assigned roles in the contract writing system.
Do not upload duplicate, draft or working contract files stored in EASi/EDMS.
All documents uploaded to the electronic contract file system must follow these file naming requirements. Refer to the sample file names following the instructions below.
Instructions
1. Begin the document file name with a brief description that provides a narrative of the content, purpose or subject.
2. It is not required to include the Award or Modification Procurement Instrument Identifier (PIID) in the file name as each electronic contract file folder will contain it.
a. If you opt to include the PIID then it must be the complete PIID without any dashes.
3. Include a date, where appropriate, in the file name using the YYYY MM DD format.
a. Use the approval or signed date when the document contains such.
b. If the document does not contain an approval signature, use another date identifier (e.g., prepared date, issued date, etc.).
c. Spacing is used, instead of periods (2018 04 01 vs 2018.04.01), as recommended for 508 compliance.
4. Include the form number in the file name, if applicable.
5. Emails may be uploaded manually, or by using the automated application programming interface
(API) which allows users to send emails directly from Google Mail to EASi/EDMS. When using API, the award PIID must be listed on the first line of the email and the subject line must contain the brief description as this will become the file name. Additional information on using this email tool can be found in the EASi Hub.
6. Avoid using abbreviations, codes and acronyms that are not commonly understood. However, use of common GSA wide abbreviations are acceptable (e.g., PBS, FAS, COR, RWA, etc.)
7. Use capital letters or a space to differentiate each word.
8. Do not include symbols such as @,#,$,/,\ _,-, in folder/file name.
9. Do not include the word “final” in the file name unless it is denoting a final submission of a file.
10. If a revision is required to a fully executed document already uploaded, include a revision identifier and revision date in the file name.
PIB 18-02 Attachment 6 1 04/19/2018
SAMPLE FILE NAMES
Award Forms, Other Forms, Award Documentation
● SF1442 Wilkie Rm 45A Renovations 2017 06 22
● SF1442 Broadway Plaza Reconstruction 2018 03 04
● SF252 AE Services Washington DC 2017 09 07
● GSA 300 Emergency Light Replacement Customs House Denver 2016 02 03
● GSA 184 Construction Progress Report 2016 01 24
● GSA 49 PR Mod M0001 2017 03 24
● SF330 AE Qualifications 2017 07 13
● RWA N98798543 Fund Approval 2017 03 04
● SOW 2016 03 23
● Limited Source Justification 2018 01 10
● Determinations and Findings 2016 10 03
● COR Appointment Letter 2017 09 08
● Price Negotiation Memo 2017 08 24
● Price Analysis PS04 2017 06 08
● Contract File Checklist 2017 11 30
● RSNAP Funds Notification 2017 11 13
● Services Janitorial Muskie 2018 02 04
● ABC Contractor Original Proposal 2018 03 02
● ABC Revised Proposal 2018 03 04
● ABC Contractor Final Accepted Proposal 2018 03 08
Award Modification SF30 and Related Documentation
● SF30 Relocate Pipe 2017 08 02
● Stop Work Order Letter 2017 09 29
● Option To Exercise Memo 6 2016 11 01
● IGE Relocate Pipe 2017 06 03
● Option 2 Exercise Program Office Request 2017 12 14
● Option 2 Exercise Contractor Notice 2017 12 17
● Option 2 Exercise Memo to File 2018 01 13
● AMD Review and Approval Checklist 2018 02 01
Revisions made to fully executed documents
● SF30 Exercise Option 1 2017 11 13
● SF30 Revised Exercise Option 1 2017 11 15
● Acquisition Plan Muskie FB Janitorial 2017 10 03
● Acquisition Plan Muskie FB Janitorial Revised 2017 10 24
File details come from the government source that posted it. Updated .