Salt Lake City Airport 2300 West Realignment
Closed State & local contract opportunity Posted
- Solicitation number
- SLCDA-DCM-542605
- State
- Utah
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 91327 Construction, Highway And Road
- 83829 Cable, Fiber Optic W/Interconnecting Components And Accessories (See Class 280 For Other Communications Cable
- 91310 Construction: Airport Roadway, Runway And Taxiway
- 91364 Maintenance And Repair: Airport Roadway, Runway And Taxiway
- 96218 Cable Construction, Installation And Maintenance (Fiber Optic, Communication, Computer, Etc.)
- 91345 Construction, Sewer And Storm Drain
- 91360 Construction, Water System/Plants, Main And Service Line
- 91340 Construction, Pipeline
- 96861 Pavement Marking Services (Including Removal Of Markings)
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- UNSPSC codes
- 72151306 Pavement marking service
- 72141103 Highway and road paving service
- 72141120 Sewer line construction service
- 72141121 Water main construction service
- 26121637 Outdoor fiber optics cable
- 72141101 Airport runway construction service
- 72141104 Highway and road resurfacing service
- 72141115 Electrical cable laying service
- 95111601 Street or avenue or road or boulevard
- 95121625 Road bridge
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
Salt Lake City is seeking sealed bids from licensed Utah general contractors for a construction procurement to perform site development work at Salt Lake City International Airport's General Aviation Zone 3, located on the east side of the airport. The project, titled "Salt Lake City Airport 2300 West Realignment" (Project No. 542605, Contract No. CA-007368), involves constructing a new access road west of existing 2300 West, removing existing 2300 West pavement, and relocating existing utilities (water, gas, power, communications, sanitary sewer, and storm drainage) into the new roadway alignment to facilitate future airport expansion. The bid schedule contains 38 line items encompassing concrete and asphalt removal, utility line installations totaling over 1,450 linear feet, storm drain and sanitary sewer systems, water line installations, and associated grading and drainage improvements. Qualified contractors must be licensed Utah general contractors with comprehensive knowledge of airport construction safety and security protocols, Foreign Object Debris (FOD) management, and FAA compliance requirements. The mandatory pre-bid conference is scheduled for Tuesday, February 17, 2026 at 2:00 p.m., with bids due on Thursday, March 5, 2026 at 1:00 p.m., followed by an administrative notice to proceed on March 26, 2026 and construction notice to proceed on April 20, 2026, with substantial completion required within 156 calendar days by September 23, 2026. Bidders must submit a 5% bid bond or cashier's check, comply with all specifications outlined in the Construction Safety and Security Compliance Manual and detailed construction plans, and register for notification of bid document changes.
No set-aside designations or disadvantaged enterprise restrictions have been identified in the procurement documents; however, contractors may receive beneficial consideration under Salt Lake City's Value-Based Procurement Program (Administrative Rule 53-1A-20) for certain workplace practices. Contractors must obtain Airport ID badges for all employees, maintain $5 million in liability insurance for ramp access, submit security deposits ranging from $5,000 to $100,000 based on contract value, and comply with specialized training requirements for airfield driving and security protocols. Upon contract execution, contractors must provide performance and payment bonds equal to 100% of the total contract price. Liquidated damages are assessed at $500 per day for failure to meet the substantial completion deadline. The project is funded by Salt Lake City Corporation; however, the specific contract value or budget range is not disclosed in the available procurement documents. All work must comply with Utah wage and hour laws, federal equal employment opportunity requirements, and Transportation Security Administration requirements in addition to the comprehensive airport-specific construction safety and security standards outlined in the governing compliance manual last revised in March 2018.
Opportunity text
This project involves site development within General Aviation Zone 3, located on the east side of Salt Lake City International Airport (SLCIA) to facilitate future expansion. Work includes the construction of a new access road to the west of existing 2300 West, removal of the existing 2300 West pavement, and relocation of existing utilities into the new roadway alignment.
Files
| File | Type | Posted |
|---|---|---|
| 2-2300 W Realignment - Project Manual.pdf | ||
| 1-2300 W Realignment - ConstructionSafetyManual.pdf | ||
| 3-2300 W Realignment - Plans.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity