3-2300 W Realignment - Plans.pdf
PDF 19 MB Posted
- Attached to
- Salt Lake City Airport 2300 West Realignment
- Solicitation number
- SLCDA-DCM-542605
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a comprehensive set of construction plans and specifications issued by the Salt Lake City Department of Airports for the 2300 West Realignment project at Salt Lake City International Airport in Utah. The project involves site development within General Aviation Zone 3 on the east side of the airport to facilitate future expansion. The primary scope of work includes construction of a new access road to the west of existing 2300 West, removal of existing 2300 West pavement, and relocation of existing utilities into the new roadway alignment. Major work items encompass pavement removal and asphalt mill and overlay, utility relocation (water, gas, power, communications, sanitary sewer, and storm drainage), grading and drainage improvements, new pavement construction with curb and gutter, and pavement markings. The project is organized into two phases with construction safety and phasing plans provided. Control points have been established using the West Airport Grid System with survey data collected on September 26, 2024. The plans are issued for construction dated February 6, 2026, prepared by WSP USA Inc. (Utah License No. 11-1531569), with the project drawing sheet number 542605.
The construction will be managed under strict airport safety and security protocols outlined in the Construction Safety and Security Compliance Manual (CSSCM). The contractor must maintain compliance with all airport operations, including Foreign Object Debris (FOD) management, security identification procedures, and coordination with Salt Lake City Department of Airports engineering staff. The contractor bears responsibility for field verification of existing utilities and conditions, survey work, damage repairs, erosion control measures, dewatering operations, pavement restoration, and coordination with all utility companies and the FAA. Contractor staging areas, haul routes, and equipment positioning are designated on the plans. Water usage from Salt Lake City sources requires metering and payment through Salt Lake City Public Utilities. All waste materials must be removed from airport property unless directed otherwise, with excess excavation hauled to designated airport stockpiles. The contractor must obtain all necessary permits and bonding prior to contract award and submit a quality control plan with work schedule and construction methods consistent with the phasing plan prior to the Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2300 W Realignment - Project Manual.pdf | ||
| 1-2300 W Realignment - ConstructionSafetyManual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Powered by Esri
AIRCRAFT DESIGN GROUP
AIR OPERATIONS AREA
APPROXIMATE
AUTOMATED SURFACE OBSERVING
SYSTEM
AVENUE
BOULEVARD
CONSTRUCTION SAFETY & PHASING PLAN
CONSTRUCTION SAFETY AND SECURITY
COMPLIANCE MANUAL
COMMON TRAFFIC ADVISORY FREQUENCY
DEMOLITION OR DEMOLISH
DO NOT DISTURB
DRAWING
EAST/EASTING
EACH
EXISTING
FEDERAL AVIATION ADMINISTRATION
FOREIGN OBJECT DEBRIS
GENERAL PROVISION
HEIGHT OR HORIZON
HAZARDOUS MATERIAL
HOT MIX ASPHALT
HORIZONTAL
LENGTH
LINEAR FEET
LUMP SUM
LEFT
MAXIMUM
MONUMENT DISK
MINIMUM
MILES PER HOUR
MEAN SEA LEVEL
MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES
NAVIGATIONAL AID
NORTH/NORTHING
NOT APPLICABLE
NATIONAL GEODETIC SURVEY
NOTICE TO AIR MISSIONS
NOTICE TO PROCEED
NOT TO SCALE
ON CENTER
OBJECT FREE AREA
OBSTACLE FREE ZONE
OPERATIONS
QUANTITY
PRIMARY AIRPORT CONTROL STATION
PERMANENT IDENTIFIER
RADIUS
REQUIRED
RUNWAY OBJECT FREE AREA
RESIDENT PROJECT REPRESENTATIVE
RUNWAY SAFETY AREA
RIGHT
RUNWAY
SOUTH
SECONDARY AIRPORT CONTROL STATION
SCHEDULE
SOUTHEAST
SQUARE FEET
SPACES OR SPECIAL PROVISION
SAFETY PLAN COMPLIANCE DOCUMENT
SQUARE INCH
STREET
STANDARD
SOUTH VALLEY REGIONAL AIRPORT
OWNER/RPR*
SOUTHWEST
STORMWATER POLLUTION PREVENTION
PLAN
TOP BACK OF CURB
TEMPORARY
TAXIWAY OBJECT FREE AREA
TRAVERSE
TAXIWAY SAFETY AREA
TAXIWAY
TYPICAL
UTAH DEPARTMENT OF TRANSPORTATION
UNDERGROUND
USE IN PLACE
UNTREATED BASE COURSE
VARIES
VERTICAL
WEST OR WIDTH
WITH
WITHOUT
AT
NUMBER
PERCENT
PLUS/MINUS (APPROXIMATE)
DIAMETER
XX
XX
XX
XX
XX
XX
SCALE:
IDENTIFIES DETAIL #
IDENTIFIES SHEET CAN BE FOUND ON
XX
XX
SECTION DETAIL TITLE
SCALE:
SECTION
ADG
AOA
APPROX
ASOS
AVE
BLVD
CSPP
CSSCM
CTAF
DEMO
DND
DWG
E
EA
EX/EXIST
FAA
FOD
GP
H
HAZMAT
HMA
HORIZ
L
LF
LS
LT
MAX
MDISK
MIN
MPH
MSL
MUTCD
NAVAID
N N/A
NGS
NOTAM
NTP
NTS
OC
OFA
OFZ
OPS
QTY
PACS
PID
R
REQD
ROFA
RPR
RSA
RT
RW
S
SACS
SCH
SE
SF
SP
SPCD
SQ IN
ST
STD
SVRA
SLDCA*
SW
SWPPP
TBC
TEMP
TOFA
TRV
TSA
TW
TYP
UDOT
UG
UIP
UTBC
VAR
VERT
W W/ W/O Ø
ABBREVIATIONSLEGEND
POST
LIMIT OF DISTURBANCE
CONTROL POINT
AOA FENCE
STORM DRAIN LINE
BURIED POWER LINE
SEWER LINE
WATER LINE
TELEPHONE LINE
BURIED TELEPHONE LINE
CABLE LINE
GAS LINE
CURB & GUTTER
SEWER MANHOLE
STORM DRAIN MANHOLE
TELEPHONE MANHOLE
ELECTRICAL MANHOLE
GAS MANHOLE
MANHOLE
CLEAN OUT
CATCH BASIN
WATER METER
GAS METER
ELECTRICAL METER
LIGHT POLE
ELECTRICAL BOX
IRRIGATION BOX
TELEPHONE PEDESTAL
ELECTRICAL TRANSFORMER
AIR CONDITIONER
WATER VALVE
FIRE HYDRANT
GATE POST
SIGN
BOLLARD
EXISTING CONDITION PROPOSED CONDITIONDESCRIPTION
DETAIL TITLE
*SLCDA ENGINEERING OR OTHER DESIGNATED AIRPORT REPRESENTATIVE
(COLLECTIVELY REFERRED TO AS SLCDA)
INDEX
PAGE NO. SHEET NO. DRAWING TITLE IFC
1 G0.00 COVER SHEET ·
2 G0.01 INDEX, ABBREVIATIONS AND LEGEND ·
3 G0.02 SURVEY CONTROL PLAN ·
4 GP0.01 OVERALL SITE PLAN ·
5 GP0.02 CONSTRUCTION SAFETY AND PHASING NOTES - SHEET 1 OF 2 ·
6 GP0.03 CONSTRUCTION SAFETY AND PHASING NOTES - SHEET 2 OF 2 ·
7 GP0.04 OFF-SITE HAUL ROUTE PLAN ·
8 GP1.00 OVERALL PHASING PLAN ·
9 GP1.01 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 1 ·
10 GP1.02 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 2 ·
11 GP5.01 CONSTRUCTION SAFETY AND PHASING DETAILS ·
12 CD1.01 DEMOLITION PLAN ·
13 C1.01 GEOMETRY PLAN ·
14 CP1.01 ROADWAY PROFILE ·
15 C5.01 GRADING DETAILS ·
16 C5.02 PAVING DETAILS - SHEET 1 OF 2 ·
17 C5.03 PAVING DETAILS - SHEET 2 OF 2 ·
18 DR1.01 DRAINAGE PLAN ·
19 DR1.02 UTILITY PROFILES SHEET - STORM DRAIN ·
20 DR5.01 DRAINAGE DETAILS ·
21 UT1.01 UTILITY PLAN ·
22 UT1.02 UTILITY PROFILES SHEET - WATER LINE ·
23 UT1.05 UTILITY PROFILES SHEET - SANITARY SEWER ·
24 UT5.01 UTILITY DETAILS - SHEET 1 OF 2 ·
25 UT5.02 UTILITY DETAILS - SHEET 2 OF 2 ·
26 E5.01 LIGHTING DETAILS - SHEET 1 OF 2 ·
27 E5.02 LIGHTING DETAILS - SHEET 2 OF 2 ·
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT G0.01
2INDEX, ABBREVIATIONS AND LEGEND
KEY PLAN
W 470 N
N 2200 W
N 2360 W
W 700 N
I-215
340 N
PROJECT LOCATION
W 650 N
8'' W 8'' W 8'' W
BP BP BP
8'' SS 8'' SS 8'' SS
2'' G 2'' G 2'' G
15'' SD 15'' SD
D
S http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
EXISTING AOA
FENCE (TYP.)
17+12
9+75 10+00 11+00 12+00 13+00
14+00 15+00
16+00 17+00
PI: STA 13+84.19
OFF 15.72'L
START ALIGNMENT ℄, STA 9+75.00
END ALIGNMENT ℄, STA 17+12.00
PT: STA 13+54.35
PC: STA 14+14.02
N: 1557.67 E: 4684.67
N: 1945.85 E: 5054.14
CONTROL POINTS
NO.
NORTHING
1946.30
2049.19
1573.49
1615.81
2048.64
1625.28
EASTING
4762.41
5017.10
5020.43
4536.88
4572.00
4827.01
ELEVATION
4223.08
4222.93
4224.14
4221.04
4221.16
4223.08
DESCRIPTION
PLUG
NAIL
PLUG
PLUG
PLUG
PLUG
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
70' 140'35'0
HORIZONTAL SCALE 1"=70'
N 2360 W
W
N
GENERAL NOTES:
1. WEST AIRPORT GRID SYSTEM (WAGS)
LOCAL SITE TRANSVERSE MERCATOR
ORIGIN LATITUDE: N40°46'25.42042"
ORIGIN LONGITUDE: W111°58'22.87366"
FALSE EASTING: 0.000 FT
FALSE NORTHING: 0.000 FT
GROUND SCALE FACTOR: 1.0001989069
BASIS OF BEARING IS NORTH (N00°00'00"E) FROM THE
ALUMINUM DISK LOCATED AT THE SOUTH END OF
THE MAIN RUNWAY (34R) TO THE ALUMIN DISK
LOCATED AT THE NORTH END OF THE MAIN RUNWAY
(16L), HORIZONTAL DISTANCE 12,337.00’.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
CONTROL POINT INFORMATION PRIOR TO
CONSTRUCTION. THE CONTRACTOR MUST
DOCUMENT AND REPORT TO SLCDA ANY
DISCREPANCIES FOUND DURING SURVEY
VERIFICATIONS. PRE-CONSTRUCTION CONTROL
VERIFICATION SUBMITTAL TO BE REVIEWED AND
VERIFIED BY SLCDA SURVEY.
3. CONTRACTOR MUST PRESERVE AND PROTECT
EXISTING CONTROL POINTS SHOWN ON PLAN. IF
DAMAGED, CONTRACTOR TO REPLACE AT
CONTRACTOR'S EXPENSE.
4. EXISTING CONDITIONS INCORPORATES PROJECT
SURVEY AND HISTORICAL DATA PROVIDED BY SLCDA.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VERIFY WITH SURVEY THE EXISTING
CONDITIONS. CONTRACTOR TO SURVEY EXISTING
PAVEMENT (INCLUDING ELEVATION) TO THE EXTENT
REQUIRED TO RE-ESTABLISH THE EXISTING GRADES
DURING PAVING OPERATIONS. THIS SHOULD BE
DONE PRIOR TO START OF CONSTRUCTION AND
CONTRACTOR MUST NOTIFIY SLCDA OF ANY
DISCREPANCIES. CONTRACTOR MUST NOT MODIFY
THE EXISTING GRADES WITHOUT THE PRIOR
WRITTEN CONSENT OF SLCDA.
5. CONTROL DATA WAS COLLECTED BY MERIDIAN
ENGINEERING ON SEPTEMBER 26, 2024.
LEGEND
CONTROL POINT
LIMIT OF WORK
N 2300 W STREET
EXISTING PARKING LOT
EXISTING PARKING LOT
TAXIWAY
TA
XI
W
AY
PROPOSED ROAD CL
BEGIN STA. 09+75.00 - N: 1557.67, E: 4684.67
P.I. STA. 13+84.18 - N: 1973.58, E: 4719.33, R38'
END STA. 16+50.00 - N: 1945.85, E: 5054.14
G0.02
3SURVEY CONTROL PLAN
R38.00' http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
00 50' 100'25'
HORIZONTAL SCALE 1"=50'
N 2360 W
W
N
GENERAL CONTRACT NOTES:
1. THIS PROJECT INCLUDES THE FOLLOWING MAJOR WORK
ITEMS:
1.1. PAVEMENT REMOVAL AND ASPHALT MILL AND OVERLAY
1.2. UTILITY RELOCATION
1.3. GRADING AND DRAINAGE
1.4. PAVEMENT CONSTRUCTION
1.5. CURB AND GUTTER CONSTRUCTION
1.6. PAVEMENT MARKING
2. SALT LAKE CITY DEPARTMENT OF AIRPORTS (SLCDA) REFERS
TO ANY REPRESENTATIVE OF THE AIRPORT AND OWNER. THIS
INCLUDES, BUT IS NOT LIMITED TO, THE RESIDENT PROJECT
REPRESENTATIVE (RPR), SLCDA ENGINEERING STAFF, SLCDA
CONSTRUCTION STAFF, RESIDENT ENGINEER, ETC.
3. THE CONTRACTOR MUST STRICTLY KEEP TO THE ACCESS
ROADS AND THE WORK AREAS SHOWN IN THE PLANS. THE
CONTRACTOR MUST NOT ACCESS ANY SAFETY AREAS FOR
ANY REASON UNLESS PRIOR APPROVAL HAS BEEN
REQUESTED AND GRANTED BY SLCDA.
4. CONTRACTOR VEHICLES FOR PERSONNEL, MATERIALS
AND/OR EQUIPMENT DELIVERY MUST USE LOAD COVERS AND
MUST BE CHECKED TO CONFIRM LOAD AND EQUIPMENT ARE
SECURED TO THE VEHICLE. ANY MATERIAL, PARTS OF
EQUIPMENT, TOOLS, TRASH OR OTHER DEBRIS THAT FALL
FROM THE VEHICLE ONTO THE ACCESS ROADS ARE
CONSIDERED POTENTIAL FOREIGN OBJECTS DEBRIS (FOD).
ANY FOD DROPPED FROM THE CONTRACTOR VEHICLES ON
PUBLIC ROADWAYS OR THE ACCESS ROAD MUST BE
RETRIEVED AND CLEANED UP IMMEDIATELY AS FOD IS A
SERIOUS DANGER TO AIRCRAFT AND VEHICLES AND CAN
CAUSE SEVERE DAMAGE TO AIRCRAFT AND VEHICLES.
5. THE CONTRACTOR MUST ONLY UTILIZE THE CONTRACTOR
STAGING AREA AS DESIGNATED IN THE PLANS FOR MATERIAL
AND EQUIPMENT STORAGE AND TO PARK EMPLOYEE
VEHICLES. NO STORAGE OR STOCKPILING ALLOWED WITHIN
AN ACTIVE ROADWAY, RUNWAY OR TAXIWAY OBJECT FREE
AREA.
6. AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS ARE
TO BE COMPLETELY RESTORED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF SLCDA.
7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD
VERIFY WITH SURVEY THE EXISTING CONDITIONS WHICH
INCLUDE BUT ARE NOT LIMITED TO THE UTILITIES (WATER,
STORM, SANITARY SEWER, ETC.) COMMUNICATION LINES AND
DUCTS, POWER LINES AND DUCTS, ETC. THIS SHOULD BE
DONE PRIOR TO START OF CONSTRUCTION AND NOTIFY
SLCDA OF ANY DISCREPANCIES. NO SEPARATE PAYMENT WILL
BE MADE FOR SURVEY. ALL SURVEY WORK REQUIRED PER
THE CONTRACT DOCUMENTS PERFORMED THROUGHOUT THE
DURATION OF THE PROJECT IS TO BE CONSIDERED
INCIDENTAL TO MOBILIZATION UNLESS OTHERWISE CALLED
FOR DIRECTLY IN THE SPECIFICATION. IN SUCH CASE, IT IS TO
BE CONSIDERED INCIDENTAL TO THAT SPECIFICATION.
8. CONTRACTOR TO INSTALL AND MAINTAIN EROSION CONTROL
MEASURES PER APWA 015700 PRIOR TO LAND DISTURBING
ACTIVITIES.
N 2300 W STREET
EXISTING PARKING LOT
EXISTING
PARKING LOT
EXISTING AOA
FENCE (TYP.)
TAXIWAY
TA
XI
W
AY
GP0.01
4OVERALL SITE PLAN
PROPOSED 2300 W STREET
LEGEND
ASPHALT PAVEMENT WITH CONCRETE CURB
AND GUTTER
ASPHALT PAVEMENT REMOVAL
CURB AND GUTTER REMOVAL
SIDEWALK REMOVAL
4" ASPHALT MILL
(DETAIL 2/C5.02)
FUTURE HANGAR LEASE LINE
*SEE SHEET G0.01 FOR ANY SYMBOLS NOT
REPRESENTED IN THIS LEGEND.
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
GENERAL NOTES
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR MUST PROVIDE SLCDA WITH A SURVEY VERIFYING EXISTING ELEVATIONS. THE SURVEY MUST BE PERFORMED USING SPECIFIED PROJECT CONTROL. THIS SURVEY WILL BE USED TO DETERMINE IF ANY MODIFICATIONS TO DESIGN GRADES ARE REQUIRED. THROUGHOUT THE PROJECT, ANY DISCREPANCIES IN EXISTING CONDITIONS MUST BE REPORTED TO SLCDA PRIOR TO CONSTRUCTION. THIS SURVEY MUST BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO SEPARATE PAYMENT WILL BE MADE. SEE UDOT 01721 SPECIFICATION "SURVEY" FOR ADDITIONAL
SURVEY INFORMATION.
2. DURING CONSTRUCTION, THE CONTRACTOR MUST MINIMIZE DISTURBANCES TO ALL CONSTRUCTION AREAS AND ACCESS ROUTES. THIS INCLUDES EQUIPMENT AND VEHICULAR RUTS CREATED IN ANY PAVEMENTS, OR ANY HAUL/ACCESS ROADS. THE CONTRACTOR MUST BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES OR ROADS. REPAIRS MUST BE MADE AT NO ADDITIONAL COST TO THE OWNER AND TO THE SATISFACTION OF SLCDA. ALL AREAS OUTSIDE OF THE PROJECT CONSTRUCTION LIMITS THAT ARE DISTURBED BY CONTRACTOR MUST BE RESTORED WITH MATERIALS AND CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. THE APPLICABLE SPECIFICATIONS MUST APPLY AS DETERMINED BY SLCDA.
3. PRELIMINARY PERMITTING INFORMATION WILL BE SUBMITTED BY THE CONTRACTOR TO SALT LAKE CITY DEPARTMENT OF AIRPORTS PRIOR TO AWARD OF CONTRACT. SPECIFIC ITEMS THAT WILL NEED TO BE COMPLETED BY THE CONTRACTOR INCLUDE, BUT ARE NOT LIMITED TO, SUPPLYING NECESSARY BONDING, AND PAYMENT OF ALL FEES PRIOR TO AWARD. CONTRACTOR MUST BE RESPONSIBLE FOR ENSURING ALL NECESSARY PERMITS HAVE BEEN
OBTAINED PRIOR TO START OF WORK.
4. ALL WASTE MATERIALS MUST BE REMOVED FROM THE AIRPORT PROPERTY AT NO COST TO THE OWNER UNLESS OTHERWISE DIRECTED BY THE OWNER. THE EXCEPTION IS ANY EXCESS EXCAVATION MUST BE HAULED TO THE AIRPORT STOCKPILE AS LOCATED ON THE PLANS.
5. PRIOR TO THE NOTICE TO PROCEED, THE CONTRACTOR MUST SUBMIT A QUALITY CONTROL PLAN WHICH INCLUDES A WORK SCHEDULE AND PROPOSED
CONSTRUCTION METHODS CONSISTENT WITH THE PHASING PLAN STATED IN THE DESIGN.
6. DURING CONSTRUCTION, THE CONTRACTOR MUST COMPLY WITH THE SLCDA "CONSTRUCTION SAFETY AND SECURITY COMPLIANCE MANUAL" (CSSCM). THE
CSSCM IS INCORPORATED AS PART OF THE BID DOCUMENTS.
7. IN ADDITION TO VERIFYING EXISTING UTILITIES (SEE NOTE 7 ON SHEET GP0.01), THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES.
REPAIRS DEEMED NECESSARY BY SLCDA WILL BE COMPLETED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. THIS MUST INCLUDE ANY
NECESSARY POTHOLING.
8. BEFORE ESTABLISHING SITE ACCESS AND HAUL ROUTES, THE CONTRACTOR MUST OBTAIN APPROVAL FROM SLCDA. WHEN POSSIBLE, ACCESS/HAUL ROUTES MUST UTILIZE EXISTING ROADS. THE CONTRACTOR MUST MAINTAIN AIRPORT SECURITY AT ALL TIMES.
9. THE CONTRACTOR SHOULD EXPECT TO ENCOUNTER WATER IN JUNCTION BOXES AND STRUCTURES. THE CONTRACTOR WILL BE RESPONSIBLE FOR
DEWATERING AT NO ADDITIONAL COST TO THE OWNER.
10. THE CONTRACTOR MUST HAVE A MINIMUM OF ONE (1) CURRENT COPY OF THE APPROVED PLANS (INCLUDING ANY CHANGE ORDERS, SUPPLEMENTAL AGREEMENTS, FIELD DIRECTIVES, ETC.), ONE (1) CURRENT COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB, ON SITE AT ALL TIMES WHEN CONSTRUCTION ACTIVITIES ARE TAKING PLACE.
11. CONTRACTOR MUST MAINTAIN EMERGENCY ACCESS THROUGH PROJECT SITE AT ALL TIMES. ALL ROADWAYS (TEMPORARY OR PERMANENT) MUST BE
MAINTAINED BY CONTRACTOR.
12. ALL CONTRACTOR EMPLOYEES ARE REQUIRED TO PARK IN THE CONTRACTORS DESIGNATED STAGING AREA ONLY.
13. THE CONTRACTOR MUST PROVIDE, AT ALL TIMES, A MINIMUM OF ONE SELF PROPELLED PICKUP VACUUM SWEEPER TO CONTINUOUSLY CLEAN THE SURFACE OF THE PARKING LOT AND ROADWAYS OF ANY FOREIGN OBJECT DEBRIS (FOD) THAT MAY RESULT FROM HAULING ACTIVITIES OR ANY OTHER CONSTRUCTION OPERATIONS. ADDITIONAL SWEEPERS MAY BE REQUIRED TO EXPEDITE THE CLEANING PROCESS OR TO MAINTAIN MULTIPLE WORK SITES. THE TYPE AND
NUMBER OF SWEEPERS ARE SUBJECT TO THE APPROVAL OF SLCDA.
14. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REPAIR OF ANY PAVEMENT, PAVEMENT MARKINGS, LIGHTING, UTILITIES, MANHOLES, SIGNAGE, OR ANY
OTHER INFRASTRUCTURE DAMAGED DUE TO CONSTRUCTION ACTIVITIES.
15. ALL WATER REQUIRED BY THE CONTRACTOR THAT IS OBTAINED FROM A SALT LAKE CITY SOURCE MUST BE METERED AND PAID FOR BY THE CONTRACTOR.
THE CONTRACTOR WILL BE REQUIRED TO OBTAIN A HYDRANT METER PERMIT FROM SALT LAKE CITY PUBLIC UTILITIES. ANY DAMAGE TO THE HYDRANT AS A RESULT OF THE CONTRACTOR'S OPERATIONS WILL BE REPAIRED AT THE CITY'S DISCRETION WITH THE ACTUAL COST OF SUCH REPAIRS BILLED TO THE
CONTRACTOR.
16. CONTRACTOR IS SUBJECT TO SALT LAKE CITY PUBLIC UTILITIES HYDRANT USE RULES, REGULATIONS AND FINES FOR VIOLATION. THE CONTRACTOR MUST
ARRANGE BILLING FOR WATER USE THROUGH SALT LAKE CITY PUBLIC UTILITIES.
17. CRAWLER TRACKED VEHICLES MUST NOT BE ALLOWED ON PAVED SURFACES. TRACKED VEHICLES MUST BE MOVED ACROSS PAVED SURFACES ON A
WHEELED VEHICLE.
18. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST COORDINATE WITH THE LOCAL UTILITY LOCATION CENTER (BLUE STAKES OF UTAH). ALSO, THE CONTRACTOR MUST COORDINATE WITH THE AIRPORT AND FAA FOR LOCATION OF PRIVATELY OWNED UTILITIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF THE UTILITIES. PRIOR TO CONSTRUCTION, THE CONTRACTOR MUST VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
19. THE CONTRACTOR MUST COORDINATE AND COOPERATE WITH THE FAA, AIRPORT, CITY, COUNTY, AND ALL UTILITY COMPANIES INVOLVED, WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, AND TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY
UTILITY SERVICE.
20. THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF SAFETY AND SECURITY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, AND TRAFFIC CONTROL.
21. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR
SPECIFICATIONS, THE CONTRACTOR MUST CONTACT SLCDA IMMEDIATELY.
22. ALL REFERENCES TO ANY PUBLISHED STANDARDS REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
23. THE CONTRACTOR MUST COMPLY WITH ALL TERMS AND CONDITIONS OF THE UTAH PERMIT FOR STORM WATER DISCHARGE, THE STORM WATER MANAGEMENT PLAN, THE EROSION CONTROL PLAN, AND ALL REQUIREMENTS OF THE LOCAL DRAINAGE AUTHORITY.
24. ALL STRUCTURAL EROSION CONTROL MEASURES MUST BE INSTALLED, AT THE LIMITS OF CONSTRUCTION, PRIOR TO ANY OTHER GROUND-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES MUST BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR, UNTIL SUCH TIME AS THE ENTIRE DISTURBED
AREA IS STABILIZED WITH HARD SURFACE OR LANDSCAPING.
QUANTITIES
1. ALL STATED QUANTITIES ARE CONSIDERED APPROXIMATE. ACTUAL QUANTITIES FOR DETERMINING PAYMENT WILL BE DETERMINED BY SLCDA FROM WORK
IN-PLACE.
2. ACTUAL RATES OF APPLICATION WILL BE DETERMINED BY SLCDA.
3. THE PROJECT PAY ITEMS PROVIDED ARE TO BE INCLUSIVE OF ALL WORK TO BE PERFORMED AS SHOWN IN THE CONTRACT DOCUMENTS. ALL WORK NOT IDENTIFIED WITH A SPECIFIC PAY ITEM IS TO BE CONSIDERED REQUIRED WORK TO COMPLETE THE PROJECT AND IS TO BE INCIDENTAL TO THE COST OF
PROJECT PAY ITEMS PROVIDED.
4. ALL PAVEMENT REMOVAL WILL BE MEASURED AND PAID TO NEAT LINE DIMENSIONS.
5. IF THE CONTRACTOR CHOOSES TO OVERBUILD PAVEMENT SECTIONS BEYOND THE DIMENSIONS SHOWN ON THE PLANS FOR CONSTRUCTABILITY, NO
PAYMENT WILL BE MADE FOR THIS ADDITIONAL MATERIAL.
6. THE FOLLOWING VALUES/ASSUMPTIONS WERE USED TO CALCULATE ESTIMATED QUANTITIES:
A.A. ASPHALT PAVEMENT REMOVAL IS BASED ON SQUARE YARD REGARDLESS OF ASPHALT DEPTH.
A.B. CONCRETE PAVEMENT IS BASED ON SQUARE YARD REGARDLESS OF DEPTH.
CONTRACTOR COORDINATION
1. CONTRACTOR MUST COORDINATE WITH OTHER CONTRACTORS ON ANY CONSTRUCTION PROJECTS ADJACENT TO THE SITE.
CONTRACTOR LIABILITIES
1. IN THE EVENT THAT AN EMPLOYEE OF THE CONTRACTOR VIOLATES A SAFETY PROVISION, THEY WILL BE PROHIBITED FROM RETURNING TO WORK WITHOUT REMEDIAL SAFETY TRAINING AND APPROVAL FROM SLCDA. VIOLATIONS MAY BE DEEMED AS JUST AND SUFFICIENT CAUSE TO REQUIRE THE EMPLOYEE TO BE PERMANENTLY REMOVED FROM THE JOB SITE. FOR THE CONTRACTOR'S VIOLATION OF THE SECURITY IDENTIFICATION DISPLAY AREA (SIDA), THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL PENALTIES ISSUED BY THE TRANSPORTATION SECURITY ADMINISTRATION (TSA) AND FOR ALL COSTS AND
DELAYS CAUSED BY SAFETY VIOLATIONS.
2. CONSTRUCTION PERSONNEL DRIVING ERRATICALLY ON THE AIRPORT, EXCEEDING THE SPEED LIMIT, OR VIOLATING ANY OTHER AIRPORT DRIVING RULE OR SAFETY REGULATION, AT A MINIMUM, WILL BE REMOVED FROM THE PROJECT PERMANENTLY. AIRPORT OPERATIONS CAN REMOVE ANY CONTRACTOR PERSONNEL, AT ANY TIME, FOR ANY DURATION, DUE TO A SAFETY VIOLATION. AIRPORT OPERATIONS WILL REPORT ANY OCCURRENCES TO THE
CONTRACTORS AND SLCDA.
3. NON-COMPLIANCE BY THE CONTRACTOR WITH AIRPORT RULES AND REGULATIONS OR FAILURE TO COMPLY WITH, AIRPORT SECURITY REGULATIONS, VEHICLE SPEED RESTRICTIONS AND ANY OTHER APPLICABLE AIRPORT REGULATION MAY RESULT IN FINES AS ALLOWED BY LAW AS WELL AS THE REMOVAL
OF THE CONTRACTOR PERSONNEL FROM THE WORK SITE.
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT GP0.02
5CONSTRUCTION SAFETY AND PHASING NOTES -
SHEET 1 OF 2
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SAFETY REQUIREMENTS DURING CONSTRUCTION
1. COORDINATION
- ALL COORDINATION WILL TAKE PLACE THROUGH SLCDA ENGINEERING.
- SLCDA MAY ORDER THE CONTRACTOR TO SUSPEND OPERATIONS; MOVE PERSONNEL, EQUIPMENT, AND MATERIALS TO A SAFE LOCATION; BARRICADE
ANY OPEN TRENCHES; AND STAND BY SHOULD THE OPERATIONAL NEED TO DO SO ARISE.
- THE CONTRACTOR MUST COORDINATE CONSTRUCTION VEHICLE TRAFFIC WITH SLCDA.
2. PHASING
- SEE SHEETS GP0.01 TO GP5.01 FOR PHASING OF THIS PROJECT.
- SLCDA ENGINEERING WILL APPROVE A SCHEDULE FOR CONSTRUCTION OF EACH PHASE PRIOR TO ANY CONSTRUCTION.
- CONTRACTOR MUST NOTIFY SLCDA ENGINEERING IN WRITING OF ANY CHANGE IN SCHEDULE IS NECESSARY. REQUESTS FOR CHANGES IN SCHEDULE
SHALL BE APPROVED BY SLCDA ENGINEERING.
- SLCDA RESERVES THE RIGHT TO CANCEL ANY HAULING OPERATION FOR AIRPORT OPERATIONAL NEED OR DUE TO CLEANLINESS.
3. AREAS AND OPERATIONS AFFECTED BY THE CONSTRUCTION ACTIVITY
- AREAS AFFECTED BY CONSTRUCTION OPERATIONS SHALL BE DELINEATED WITH BARRICADES AND/OR SIGNAGE AS REQUIRED BY THE CONSTRUCTION
SAFETY DRAWINGS AND IN ACCORDANCE WITH THE CONSTRUCTION SAFETY AND SECURITY COMPLIANCE MANUAL.
4. CONTRACTOR ACCESS
- CONTRACTOR MOVEMENT SHALL BE RESTRICTED TO THE ACCESS ROUTES AS SHOWN ON SHEET GP0.04 AND GP1.00.
- CONTRACTOR, SUBCONTRACTOR, AND SUPPLIER EMPLOYEES OR ANY UNAUTHORIZED PERSONS MUST BE RESTRICTED FROM ENTERING AN AIRPORT
AREA THAT WOULD BE CONSIDERED HAZARDOUS.
5. HAZARDOUS MATERIAL (HAZMAT) MANAGEMENT
- CONTRACTOR SHALL NOTIFY SLCDA ENGINEERING IF HAZARDOUS MATERIAL IS ENCOUNTERED ON THIS PROJECT.
- ANY HAZARDOUS OR REGULATED WASTE MATERIAL PRODUCED BY THE CONTRACTOR MUST BE PROPERLY DISPOSED OF AT THE CONTRACTOR'S EXPENSE ACCORDING TO ALL LOCAL, STATE, AND FEDERAL REGULATIONS. ALL SPILLS OR REGULATED HAZARDOUS MATERIALS ENCOUNTERED SHALL
BE REPORTED TO THE SLCDA ENVIRONMENTAL DEPARTMENT FOR TRACKING.
- ANY WASTE FROM EXCAVATION WILL NEED TO BE DISPOSED OF ON-SITE AT LOCATION AS SHOWN ON GP0.04.
6. NOTIFICATION OF CONSTRUCTION ACTIVITIES
AGENCY TELEPHONE NUMBER WORK HOURS
EMERGENCY - POLICE/FIRE/RESCUE 911 24 HOURS
AIRPORT OPERATIONS MANAGER (801) 209-1571
AIRPORT CONTROL CENTER (801) 575-2401
AIRPORT ENGINEERING (801) 575-2900 8 AM - 4:30 PM
AIRPORT PROPERTIES (801) 575-2957
AIRPORT SECURITY (801) 575-2401
AIRPORT BADGING OFFICE (801) 575-2423 8:15 AM - 4 PM
- THE CONTRACTOR SHALL ADHERE TO THE REQUIREMENTS, PROVISIONS, AND PROCEDURES OUTLINED IN THE CONSTRUCTION SAFETY AND SECURITY
COMPLIANCE MANUAL (CSSCM).
- INSPECT ALL CONSTRUCTION AND STORAGE AREAS AS OFTEN AS NECESSARY TO BE AWARE OF ALL CONDITIONS.
- PROMPTLY TAKE ALL ACTIONS NECESSARY TO PREVENT OR REMEDY ANY UNSAFE OR POTENTIALLY UNSAFE CONDITIONS AS SOON AS THEY ARE
DISCOVERED.
7. FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT
- THE CONTRACTOR SHALL PROVIDE THEIR OWN EQUIPMENT FOR VEHICLE AND EQUIPMENT WASHING, CLEAN UP, AND VACUUM SWEEPING.
- IMMEDIATE ACCESS TO A POWER VACUUM SWEEPER/BROOM IS REQUIRED WHEN CONSTRUCTION OCCURS ON ANY PAVEMENT AREA, UNLESS AN
APPROPRIATE ALTERNATIVE HAS BEEN APPROVED BY SLCDA.
- WASTE AND LOOSE MATERIAL MUST BE REMOVED CONTINUOUSLY DURING THE PROJECT.
- THE AIRPORT ENVIRONMENT REQUIRES A HIGH DEGREE OF CARE TO CONTROL DEBRIS AND DUST. SPILLED MATERIALS ON ROADWAYS SHALL BE CLEANED IMMEDIATELY. DUST FROM CONSTRUCTION OPERATIONS CAN AFFECT VISIBILITY FOR PILOTS. AS SUCH, DUST CONTROL MEASURES SHALL BE
IMPLEMENTED AND ANY ISSUES SHALL BE IMMEDIATELY REMEDIED.
- CONTRACTOR SHALL CONTINUOUSLY MONITOR SITE AND PICK UP LOOSE MATERIALS TO PREVENT BLOWING OR BECOMING A HAZARD TO THE PUBLIC.
- NO EQUIPMENT, TENTS OR ANY OTHER TYPE OF CONSTRUCTION SHALL BE LEFT UP TO BE CAUGHT BY WIND AND CAUSE DAMAGE TO VEHICLES OR THE
PUBLIC.
8. INSPECTION REQUIREMENTS
- SLCDA WILL INSPECT THE PROJECT PRIOR TO CONSTRUCTION PERSONNEL AND CLEANUP EQUIPMENT LEAVING THE PROJECT SITE DAILY.
- THE CONTRACTOR SHALL COMPLETE A DAILY INSPECTION FOR SAFETY ON THE CONSTRUCTION SITE.
- THE CONTRACTOR, SLCDA ENGINEERING, AND AIRPORT OPERATIONS SHALL PERFORM ONSITE INSPECTIONS THROUGHOUT THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL IMMEDIATELY REMEDY ANY DEFICIENCIES, WHETHER CAUSED BY NEGLIGENCE, OVERSIGHT, OR PROJECT SCOPE
CHANGE.
9. MARKING AND SIGNS FOR ACCESS ROUTES
- THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGES THAT OCCUR DUE TO INADEQUATELY MAINTAINED HAUL ROUTES. WHEN REQUIRED BY SLCDA, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE TRAFFIC SIGNAGE THAT CONFORMS TO THE MUTCD STANDARDS. CONTRACTOR'S HAUL ROUTES
MUST BE RESTORED TO THEIR ORIGINAL CONDITION AT THE COMPLETION OF THE PROJECT.
- TEMPORARY LIGHT PLANTS USED IN CONJUNCTION WITH NIGHTTIME WORK CANNOT BE LOCATED IN SUCH A MANNER AS TO BE AN OBSTRUCTION OR IN ADDITION, THESE LIGHT PLANTS CANNOT BE LOCATED WHERE THE GLARE OF THE LIGHT WILL CAUSE VISUAL OR PHYSICAL INTERFERENCE TO
OPERATING AIRCRAFT.
10. HAZARD MARKINGS AND LIGHTINGS
- THE CONTRACTOR SHALL HAVE AN INDIVIDUAL ON CALL 24 HOURS A DAY TO MAINTAIN ALL BARRICADES USED TO DELINEATE CONSTRUCTION AND
HAZARDOUS AREAS IN FULLY OPERATIONAL CONDITION. LIGHTS, FLAGS, AND REFLECTORIZED PANELS SHALL BE MAINTAINED AND IN GOOD, CLEAN OPERATING CONDITION AT ALL TIMES. BROKEN LIGHTS, REFLECTORIZED PANELS, WORN OR TATTERED FLAGS SHALL BE REPLACED IN A TIMELY MANNER BY THE CONTRACTOR AT THEIR EXPENSE OR CONSTRUCTION ACTIVITIES MAY BE RESTRICTED OR CEASED. LIGHTS AND FLAGS SHALL BE SECURELY ATTACHED TO THE BARRICADES AS SHOWN IN DETAILS. WATER FILLED BARRICADES SHALL BE MAINTAINED AND KEPT FULL OF WATER, OR, IN COLD
WEATHER, AN APPROVED MATERIAL.
- ANY STAGING AREAS USED MUST BE LEFT ENVIRONMENTALLY CLEAN DURING AND AT THE COMPLETION OF THE CONSTRUCTION PROJECT. THIS INCLUDES KEEPING THE AREA CLEAN OF DEBRIS, OIL SPILLS AND OTHER UNDESIRABLE ELEMENTS. ANY HAZARDOUS OR REGULATED WASTE MATERIAL PRODUCED BY THE CONTRACTOR MUST BE PROPERLY DISPOSED OF AT THE CONTRACTOR'S EXPENSE ACCORDING TO ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL SPILLS OR REMOVAL OF REGULATED OR HAZARDOUS MATERIAL SHALL BE REPORTED TO THE SLCDA ENVIRONMENTAL DEPARTMENT
FOR TRACKING.
11. AIRPORT SECURITY
- THE CONTRACTOR SHALL ADHERE TO AIRPORT SECURITY REQUIREMENTS AT ALL TIMES.
- SAFETY AND SECURITY PRECAUTIONS ARE NECESSARY AT THE AIRPORT. FAILURE OF THE CONTRACTOR TO ADHERE TO PRESCRIBED REQUIREMENTS MAY HAVE CONSEQUENCES THAT JEOPARDIZE THE HEALTH, SAFETY, OR LIVES OF CUSTOMERS AND EMPLOYEES AT THE AIRPORT. THEREFORE, WHEN THE CONTRACTOR IS FOUND TO BE IN VIOLATION OF SAFETY, SECURITY, BADGING/LICENSING REQUIREMENTS OR ANY OTHER PROCEDURE, THE
CONTRACTOR MAY BE SUBJECT TO CRIMINAL CHARGES.
12. OTHER LIMITATION ON CONSTRUCTION
- THE FOLLOWING RESTRICTIONS WILL BE IN PLACE DURING THE CONSTRUCTION OF THIS PROJECT UNLESS OTHERWISE ACCEPTED BY WRITTEN
AUTHORIZATION:
A. OPEN-FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE SAFETY PRECAUTIONS ARE PROVIDED AND
APPROVED BY SLCDA ENGINEERING AND AIRPORT OPERATIONS.
B. OPEN TRENCHES, EXCAVATIONS, AND STOCKPILED MATERIALS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED, LIGHTED, AND
BARRICADED OFF DURING PERIODS OF DARKNESS OR RESTRICTED VISIBILITY.
C. CLOSED, DEFECTIVE, OR HAZARDOUS AREAS SHALL BE MARKED, LIGHTED, AND BARRICADED OFF AS DESIGNATED ON THE PLANS, AS DIRECTED BY
SLCDA, OR AS OTHERWISE NECESSARY TO PREVENT ANY INADVERTENT ACCESS.
D. SLCDA RESERVES THE RIGHT TO REVIEW THE CONTRACTOR'S SAFETY PROGRAM/RECORD, ATTEND CONSTRUCTION SAFETY MEETINGS, AND REGULARLY INSPECT WORK SITES TO ENSURE COMPLIANCE WITH THE CONSTRUCTION SAFETY AND COMPLIANCE MANUAL. SEE THE FOLLOWING LINK
TO REFERENCE THE CONSTRUCTION SAFETY AND SECURITY COMPLIANCE MANUAL:
HTTPS://SLCAIRPORT.COM/ASSETS/PDFDOCUMENTS/CONSTRUCTIONSAFETYMANUAL.PDF
IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL NOTIFY AIRPORT EMERGENCY, AS WELL AS SLCDA ENGINEERING AND AIRPORT
OPERATIONS.
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT GP0.03
6CONSTRUCTION SAFETY AND PHASING NOTES -
SHEET 2 OF 2
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
PROJECT AREA
N
00 600' 1200'300'
HORIZONTAL SCALE 1"=600'
LEGEND
GP0.04
7OFF-SITE HAUL ROUTE PLAN
I-215
N
2200 W
N
3200 W
N
PROJECT LOCATION
OFF-SITE SOIL
STOCKPILE LOCATION
OFF-SITE SOIL STOCKPILE AREA
PROPOSED HAULING ROUTE
POTENTIAL MILLINGS
STOCKPILE LOCATION
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
2025 M icrosoft Corporation © 2025 M axar ©
CN
ES (2025) D
istribution Airbus D
S ©
2025 TM
AP M
O
BILITY Earthstar Geograph
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
STAGING, STORING, PARKING AREA,
AND CONTRACTOR LAYDOWN AREA
PHASE 1
PHASE 2
HAUL ROUTE
PHASE ID
FUTURE HANGAR LEASE LINE
PHASE NOTES:
1. CONSTRUCTION SCHEDULE COORDINATION TO OCCUR
PRIOR TO CONSTRUCTION NTP.
2. CONTRACTOR MUST COORDINATE THE PLACEMENT AND
LOCATION OF ALL CONSTRUCTION BARRICADES FOR
EACH PHASE WITH SLCDA AIRPORT PERSONNEL PRIOR TO
THE START OF EACH CONSTRUCTION AREA.
3. THE COMPLETED CONSTRUCTION AS SHOWN ON THE
PHASING PLANS ASSUMES CHRONOLOGICAL COMPLETION.
4. STAGING AREA MUST BE COMPLETED PRIOR TO START OF
CONSTRUCTION.
5. CONTRACTOR TO COORDINATE ANY STAGING AREA
SECURITY MEASURES WITH SLCDA.
6. HAUL ROUTE SHOWN IS AN APPROXIMATE LOCATION.
CONTRACTOR TO COORDINATE EXACT HAUL ROUTE WITH
SLCDA. CONTRACTOR MUST USE CARE AS TO NOT HIT ANY
VEHICLES OR OBJECTS ALONG THE PATH WHILE ENTERING
OR EXITING THE STAGING AREA. CONTRACTOR TO
CLEARLY DELINEATE THE HAUL ROUTE USING A METHOD
APPROVED BY SLCDA.
7. CONTRACTOR MUST PROVIDE TRAFFIC CONTROL IN
ACCORDANCE WITH SPECIFICATION P-148.
N
60' 120'30'0
HORIZONTAL SCALE 1"=60'
LEGEND
N 2360 W
W
N
STAGING AREA
TAXIWAY
TA
XI
W
AY
N 2300 W STREET
GP1.00
8OVERALL PHASING PLAN
EXISTING AOA
FENCE (TYP.)
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
00 40' 80'20'
HORIZONTAL SCALE 1"=40'
N 2360 W
MAJOR WORK ITEMS:
1. CONSTRUCTION SAFETY & PHASING MEASURES
2. EROSION AND SEDIMENT CONTROL MEASURES
3. UTILITY CONSTRUCTION
4. GRADING AND DRAINAGE
5. PROPOSED ROADWAY CONSTRUCTION
6. PAVEMENT MARKING
7. SEEDING
PHASE NOTES:
1. CONTRACTOR MUST COORDINATE THE
PLACEMENT AND LOCATION OF ALL
CONSTRUCTION BARRICADES FOR EACH
PHASE WITH SLCDA AIRPORT PERSONNEL
PRIOR TO THE START OF EACH
CONSTRUCTION AREA.
2. CONTRACTOR IS RESPONSIBLE FOR THE
MAINTENANCE AND RESTORATION OF THE
HAUL ROUTES.
3. USING ACCESS POINTS OTHER THAN THOSE
OUTLINED WILL REQUIRE APPROVAL FROM
SLCDA.
4. PAINT MARKING PLACEMENT TO BE LAST
CONSTRUCTION ACTIVITY IN THE PHASE.
5. CONTRACTOR MUST INSTALL STABILIZED
CONSTRUCTION ENTRANCE IN ORDER TO
PREVENT TRACKING MUD/DEBRIS ONTO
ROADS.
6. STOCKPILES MUST NOT BE HIGHER THAN 15'.
7. PHASING MAY BE CHANGED WITH
APPROVAL OF SLCDA.
8. CONTRACTOR MUST COORDINATE WITH
SLCDA AND BUILDING TENANTS TO MAINTAIN
ACCESS DURING ALL PHASES OF WORK. IN
ADDITION, ACCESS TO 2360 W MUST BE
MAINTAINED.
STAGING AREA
STAGING, STORING, PARKING AREA,
AND CONTRACTOR LAYDOWN AREA
PHASE 1
HAUL ROUTE
PHASE ID
FUTURE HANGAR LEASE LINE
LEGEND
EXISTING AOA
FENCE (TYP.)
TAXIWAY
W
N
N 2300 W STREET
GP1.01
9CONSTRUCTION SAFETY AND PHASING PLAN -
PHASE 1
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
00 40' 80'20'
HORIZONTAL SCALE 1"=40'
N 2360 W
MAJOR WORK ITEMS:
1. CONSTRUCTION SAFETY & PHASING MEASURES
2. EROSION AND SEDIMENT CONTROL MEASURES
3. DEMOLITION OF EXISTING ROADWAY
4. ASPHALT PAVEMENT MILL AND OVERLAY
5. DEMOLITION OF EXISTING UTILITIES
6. PROPOSED UTILITY CONNECTIONS
7. CONSTRUCTION OF NEW CURB
8. GRADING AND DRAINAGE
9. SEEDING
STAGING, STORING, PARKING AREA,
AND CONTRACTOR LAYDOWN AREA
PHASE 2
HAUL ROUTE
PHASE ID
FUTURE HANGAR LEASE LINE
LEGEND
EXISTING AOA
FENCE (TYP.)
W
N
N 2300 W STREET
TAXIWAY
PHASE NOTES:
1. CONTRACTOR MUST COORDINATE THE
PLACEMENT AND LOCATION OF ALL
CONSTRUCTION BARRICADES FOR EACH
PHASE WITH SLCDA AIRPORT PERSONNEL
PRIOR TO THE START OF EACH
CONSTRUCTION AREA.
2. CONTRACTOR IS RESPONSIBLE FOR THE
MAINTENANCE AND RESTORATION OF THE
HAUL ROUTES.
3. USING ACCESS POINTS OTHER THAN THOSE
OUTLINED WILL REQUIRE APPROVAL FROM
SLCDA.
4. CONTRACTOR MUST INSTALL STABILIZED
CONSTRUCTION ENTRACE IN ORDER TO
PREVENT TRACKING MUD/DEBRIS ONTO
ROADS.
5. STOCKPILES MUST NOT BE HIGHER THAN 15'.
6. PHASING MAY BE CHANGED WITH
APPROVAL OF SLCDA.
7. CONTRACTOR MUST COORDINATE WITH
SLCDA AND BUILDING TENANTS TO MAINTAIN
ACCESS DURING ALL PHASES OF WORK. IN
ADDITION, ACCESS TO 2360 W MUST BE
MAINTAINED.
GP1.02
10CONSTRUCTION SAFETY AND PHASING PLAN -
PHASE 2
STAGING AREA
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SCALE:
GP5.01
UDOT TYPE III PANEL
NTS
5' MIN
1.82'
8" TO 12"
NOTES:
1. USE A MINIMUM OF 270 SQUARE INCHES OF RETROREFLECTIVE MATERIAL PLACED ON
BARRICADES AND VERTICAL PANELS. PLACE BARRICADES AND VERTICAL PANELS IN
SUCH A MANNER THAT THEY ARE VISIBLE TO APPROACHING TRAFFIC.
2. USE 6 INCH STRIPE WIDTH WHERE THE HEIGHT OF THE RETROREFLECTIVE MATERIAL
ON VERTICAL PANEL IS 36 INCHES OR MORE.
3. CONTRACTOR TO USE DOUBLE BALLAST (40 LBS TOTAL) FOR BARRICADES THAT WILL
REMAIN OVERNIGHT
4. UDOT VERTICAL PANELS MUST BE SPACED MAX 10' OR AS DIRECTED BY SLCDA.
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT GP5.01
11CONSTRUCTION SAFETY AND PHASING DETAILS
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
17+12
9+75 10+00 11+00 12+00 13+00
14+00 15+00
16+00 17+00
STA 9+97.16
OFF 177.87'R
STA 15+34.24
OFF 14.65'R
STA 16+37.38
OFF 9.65'L
STA 10+19.67
OFF 125.11'R
STA 10+19.41
OFF 223.10'R
STA 15+31.72
OFF 17.14'R
STA 15+34.34
OFF 10.15'L
STA 15+26.72
OFF 10.15'L
STA 14+14.92
OFF 12.05'R
STA 14+15.08
OFF 17.50'L
STA 14+16.99
OFF 0.00'
STA 15+26.67
OFF 0.00'
20.00'
STA 10+20.22
OFF 43.51'L
STA 10+19.88
OFF 58.10'R
STA 14+17.03
OFF 10.52'LSTA 14+16.96
OFF 10.00'R
STA 15+26.63
OFF 9.97'R
STA 10+08.48
OFF 50.94'R
STA 9+97.86
OFF 24.51'R
STA 9+93.62
OFF 29.50'R
STA 9+86.98
OFF 174.75'R
STA 9+93.62
OFF 167.20'R
STA 10+07.17
OFF 181.17'R
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
00 30' 60'15'
HORIZONTAL SCALE 1"=30'
W
N
N 2300 W STREET
CURB AND
GUTTER
REMOVAL
(TYP.)
SIDEWALK
REMOVAL
LEGEND
ASPHALT PAVEMENT REMOVAL
CURB AND GUTTER REMOVAL
SIDEWALK REMOVAL
4" ASPHALT MILL
(DETAIL 2/C5.02)
TRENCH BACKFILL
(DETAILS 1 & 2/UT5.01)
FUTURE HANGAR LEASE LINE
*SEE SHEETG0.01 FOR ANY SYMBOLS NOT
REPRESENTED IN THIS LEGEND.
ASPHALT
MILL AND
OVERLAY
EXISTING GAS LINE (TYP.) EXISTING SANITARY
SEWER (TYP.)
EXISTING LIGHT
POLE (TYP.)
EXISTING POWER
LINE (TYP.)
EXISTING STORM
DRAINAGE INLET (TYP.)
EXISTING STORM
DRAINAGE PIPE (TYP.)
EXISTING WATER
LINE (TYP.)
EXISTING AOA
FENCE (TYP.)
EXISTING CURB (TYP.)
EXISTING SANITARY
SEWER MANHOLE (TYP.)
EXISTING ASPHALT
PAVEMENT
EXISTING ASPHALT
PAVEMENT
EXISTING STORM
DRAINAGE MANHOLE (TYP.)
CD1.01
12DEMOLITION PLAN
NOTES:
1. SEE GP SERIES FOR CONSTRUCTION
SAFETY AND PHASING PLANS AND DETAILS.
2. SEE SHEET C1.01 FOR GEOMETRY PLAN.
3. SEE SHEETS C5.02 THROUGH C5.03 FOR
PAVING DETAILS.
4. SEE UT SERIES FOR UTILITY PLANS AND
DETAILS, AND FOR UTILITY DEMOLITION.
5. ALL ASPHALT AND CURB REMOVAL LIMITS
THAT ABUTT PAVEMENT TO REMAIN MUST
BE SAW CUT TO THE FULL DEPTH TO
PREVENT DAMAGE TO EXISTING PAVEMENT.
6. ALL DISTURBED AREAS INCLUDING THOSE
AFFECTED BY PAVEMENT REMOVAL MUST
BE GRADED TO DRAIN AND SEEDED IN
ACCORDANCE WITH SPECIFICATION T-901.
7. CUT AND CAP IRRIGATION LINES AT
REALIGNED 2300 WEST. INSTALL A 6" PVC
SLEEVE UNDER THE ROADWAY IN THE PARK
STRIP TERMINATING IN AN IRRIGATION BOX
ON EACH SIDE FOR FUTURE IRRIGATION.
SEE SHEET UT1.01 FOR UTILITY PLAN.
ASPHALT
MILL AND
OVERLAY
RELOCATE EXISTING
STREET SIGN ASPHALT PAVEMENT
REMOVAL
02/12/2026
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EJB
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
ET
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
JBI
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
GM
AutoCAD SHX Text
GM
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text M
AutoCAD SHX Text
PMH
AutoCAD SHX Text
PMH
AutoCAD SHX Text
PMH
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
SS
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
S
DD
S
S
17+12
9+75 10+00 11+00 12+00 13+00
14+00 15+00
16+00 17+00
SEE CD1.01 - DEMOLITION PLAN FOR
EXISTING TO BE DEMOLISHED
STA: 10+20.22
OFF: 43.51'L
STA: 10+45.22
OFF: 18.50'L
STA: 10+44.92
OFF: 18.50'R
STA: 10+19.92
OFF: 43.43'R
STA: 13+71.82
OFF: 25.05'L
STA: 13+91.51
OFF: 22.87'L
STA: 14+14.02
OFF: 12.06'R
STA: 13+66.48
OFF: 17.46'R
STA: 14+16.96
OFF: 12.03'R
STA: 14+15.08
OFF: 17.50'L
STA: 15+32.39
OFF: 17.14'R
STA: 16+37.38
OFF: 9.65'L
CURVE MIDPOINT
STA: 16+08.00
OFF: 20.25'R
STA: 14+12.18
OFF: 12.56'L
STA: 15+66.08
OFF: 20.76'R
STA: 15+47.84
OFF: 17.22'R
STOP BAR
STA: 10+27.92
OFF: 22.12'L
STA: 10+29.92
OFF: 27.00'L
INSTALL SALVAGED STOP,
STREET NAME, AND NO-DRONE
ZONE SIGNS
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
N
00 30' 60'15'
HORIZONTAL SCALE 1"=30'
EXISTING 2300 WEST
N O
R
TH
LEGEND
ROADWAY PAVEMENT SECTION
ASPHALT MILL AND OVERLAY
TRENCH BACKFILL
(DETAILS 1 & 2/UT5.01)
FUTURE HANGAR LEASE LINE
*SEE SHEET G0.01 FOR ANY SYMBOLS NOT
REPRESENTED IN THIS LEGEND.
C1.01
13GEOMETRY PLAN
NOTES:
1. SEE GP SERIES FOR CONSTRUCTION
SAFETY AND PHASING PLANS AND DETAILS.
2. SEE SHEET CD1.01 FOR DEMOLITION PLAN.
3. SEE SHEETS C5.02 THROUGH C5.03 FOR
PAVING DETAILS.
4. SEE UT SERIES FOR UTILITY PLANS AND
DETAILS.
5. STATION AND OFFSET CALLOUTS ARE TO
TOP BACK OF CURB UNLESS OTHERWISE
NOTED.
C5.02
C5.02
3C 5.02
C5.02
30" STANDARD
CURB AND GUTTER
C5.03
30" STANDARD
CURB AND GUTTER
37.00'
24.50'
PROPOSED STORM
MANHOLE (TYP.)
PROPOSED CURB FACE INLET
R25.00'
R25.00'
R22.50'
R19.50' R3.50'
R55.00'
R50.00'
PROPOSED CLEANOUT BOX
PROPOSED CURB FACE INLET
C5.03
PROPOSED SEWER
MANHOLE (TYP.)
C5.03 http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
HOR SCALE: 1":100'
VER SCALE: 1":20'
PROFILE VIEW - 2300W REALIGNMENT CL
9+75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50
HOR SCALE: 1":100'
VER SCALE: 1":20'
PROFILE VIEW - 2300W REALIGNMENT CL
9+75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50
-2.60%0.50%
PVI STA 13+71.91
PVI EL 4223.41
LVC = 60.00'
PV
C
S
TA
3+
.9
PV
C E
L
.2
PV
T
ST
A
+0
1.
PV
T
EL
2.
PV
I S
TA
. 1
0+
.5
EL
EV
1.
PV
I S
TA
. 1
4+
.9
EL
EV
2.
-4.00%
0.00%
4.00%
SUPERELEVATION DIAGRAM
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
-2.00%
2.00%
-6.00%
6.00%
-4.00%
4.00%
-2.00%
2.00%
-6.00%
6.00%
0.00%
2300 W PGL & AXIS OF ROTATION
EOP RT 2.00%
EOP LT -2.00%
EOP RT 0.93%
STA 10+17.51
EOP LT -0.93%
STA 10+17.75
FOR EDGE OF PAVEMENT
ELEVATIONS SEE SHEET C5.01
GRADING DETAILS
EOP LT -2.00%
STA 10+45.22
EOP RT 2.00%
STA 10+44.92
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
00 30' 60'15'
HORIZONTAL SCALE 1"=30'
CP1.01
14ROADWAY PROFILE
LEGEND
EXISTING GROUND PROFILE
FINISHED GRADE PROFILE
*SEE SHEET G0.01 FOR ANY SYMBOLS NOT
REPRESENTED IN THIS LEGEND.
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
15'' SS
15'' SD 15'' SD 15'' SD 15'' SD 15'' SD 15'' SD 15'' SD
S
16+00
EOP
STA 15+34.28
OFF 14.65' R
EL 4222.34
MATCH EXISTING
EOP
STA 16+35.06
OFF 10.59' L
EL 4222.61
MATCH EXISTING
EOP/LP
STA 15+82.10
OFF 21.98' R
EL 4222.02
EOP
STA 15+34.34
OFF 10.15' L
EL 4222.47
MATCH EXISTING
EOP
STA 15+40.00
OFF 14.68' R
EL 4222.30
EOP
STA 15+70.00
OFF 19.53' R
EL 4222.10
EOP
STA 15+80.00
OFF 21.77' R
EL 4222.03
EOP
STA 15+90.00
OFF 22.04' R
EL 4222.09
EOP
STA 16+00.00
OFF 20.37' R
EL 4222.18
EOP
STA 16+10.00
OFF 16.57' R
EL 4222.28
EOP
STA 16+20.00
OFF 10.02' R
EL 4222.38
EOP
STA 16+30.00
OFF 1.07' L
EL 4222.52
EOP
STA 15+50.00
OFF 14.78' R
EL 4222.24 EOP
STA 15+60.00
OFF 16.21' R
EL 4222.17
4223.0
4222.2
4222.4
4222.6
4222.8
4223.0
4222.4
4222.6
4222.8
4223.2
0.
2.64% 3.40% 3.
2.
0.65% 0.59%
0.80%
0.86%
1.60% 0.
'' S
S
S15'' SS15'' SS15'' SS15'' SS
13+00
14+00
2.11%
EOP/HP
STA 13+51.60
OFF 16.00' L
EL 4222.96
EOP
STA 13+40.00
OFF 16.00' R
EL 4223.57
EOP
STA 13+40.00
OFF 16.00' L
EL 4222.93
EOP
STA 13+30.00
OFF 16.00' L
EL 4222.88
EOP
STA 13+30.00
OFF 16.00' R
EL 4223.52
EOP
STA 13+70.00
OFF 20.93' L
EL 4222.82
EOP
STA 13+80.00
OFF 26.02' L
EL 4222.70
EOP
STA 13+90.00
OFF 21.46' L
EL 4222.57
EOP
STA 14+00.00
OFF 13.46' L
EL 4222.45
EOP/HP
STA 13+51.60
OFF 16.00' R
EL 4223.60
EOP
STA 13+60.00
OFF 15.75' R
EL 4223.58
EOP
STA 13+80.00
OFF 12.56' R
EL 4223.33
EOP
STA 13+90.00
OFF 11.14' R
EL 4223.13
EOP
STA 14+12.08
OFF 10.06' L
EL 4222.33
EOP
STA 14+00.00
OFF 10.12' R
EL 4222.81
EOP
STA 14+17.04
OFF 15.45' L
EL 4222.29
MATCH EXISTING
EOP
STA 14+10.00
OFF 9.61' R
EL 4222.47
EOP
STA 14+16.96
OFF 10.00' R
EL 4222.21
MATCH EXISTING
EOP
STA 13+70.00
OFF 14.23' R
EL 4223.48
EOP
STA 13+60.00
OFF 16.60' L
EL 4222.93
EOP
STA 14+10.00
OFF 10.27' L
EL 4222.35
EOP
STA 13+92.00
OFF 10.90' R
EL 4223.08
EOP
STA 14+01.91
OFF 9.98' R
EL 4222.75
EOP
STA 14+14.02
OFF 9.56' R
EL 4222.33
4223.0
4222.6
4222.8
4223.2
4223.4
4223.6
4223.0
.4
.6
4222.84223.2
4222.0
4223.0
4222.0
4221.0 4220.4
4220.6
4220.8
4221.2
4221.4
4221.0
4220.6
4220.8
4221.2
4221.4
4221.6
4222.0
4222.0
4221.8
4222.2
.042
.8
.2
.4
.6
4222.0
4221.6
.6
4221.8
4222.0
4221.8
4222.2
4221.0
4220.8
4221.2
.4
.6
2.
2.
1.
1.7 7%
1.74%
1.00%
0.09%
0.72% 0.74%
0.72% 0.
0.
4.62% 4.62%
MANAGEMENT DIVISION
SALT LAKE CITY
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
LEGEND
ASPHALT PAVEMENT
*SEE SHEET G0.01 FOR ANY SYMBOLS NOT
REPRESENTED IN THIS LEGEND.
C5.01
15GRADING DETAILS
NOTES:
1. SEE GP SERIES FOR CONSTRUCTION
SAFETY AND PHASING PLANS AND DETAILS.
2. SEE SHEET CP1.01 FOR ℄ PROFILE.
3. SEE OVERALL GRADING ON SHEET DR1.01 -
DRAINAGE PLAN.
MATCH EXISTING GRADES
http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com http://www.pbworld.com
SALT LAKE CITY, UT. 84114-5550
DEPARTMENT OF AIRPORTS
P.O. BOX 145550 OF
DESIGN & CONSTRUCTION SALT LAKE CITY INTERNATIONAL AIRPORTDESIGNED
DRAWN
CHECKED
APPROVED
DATE
DATE
DATE
DATE
DATE
02/06/2026
02/06/2026
02/06/2026
02/06/2026
02/06/2026
REVISIONS
No. DATE APVBYREMARKS
PROJECT
DRAWING
SHEET
542605
ISSUED FOR
CONSTRUCTION
10876 S RIVER FRONT PKWY
SUITE 250
SOUTH JORDAN, UT 84095
T 385-274-5800 I www.wsp.com
WSP USA INC.
UTAH
LICENSE NO. 11-1531569 2300 WEST REALIGNMENT
COMPACTED SUBGRADE (P-152)
18" SUBBASE COURSE (P-154)
10" UNTREATED BASE COURSE (P-239)
5" OF 12" ASPHALT MIX (HMHMA P-400)
SLOPE PER PLANS
STABILIZATION FABRIC (P-157)
TACK COAT BETWEEN LIFTS (P-603)
SCALE:
C5.02
ROADWAY PAVEMENT SECTION
NTS
NOTES:
1. P-400 (HMHMA) ASPHALT SURFACE COURSE MUST BE
USED FOR OVERLAY
2. ASPHALT SURFACE COURSE OVERLAY COMPACTED
THICKNESS EQUAL TO THE MILLING THICKNESS
3. SEE P-101 FOR MILLING REQUIREMENTS
SCALE:
C5.02
ASPHALT MILL AND OVERLAY
NTS
ROTOMILLING WITH 4" OF 12"
ASPHALT MIX OVERLAY
(HMHMA P-400)
EXISTING PAVEMENT
TO REMAIN
SAW CUT, TACK COAT,
AND MEET ADJACENT
ASPHALT GRADE
TACK COAT
(P-60…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .