Cocoa Waterfront Dock and Breakwater "Lee Wenner Day Docks"
Closed State & local contract opportunity
- Solicitation number
- B-26-10-COC
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141214 Sheet pile driving service
- 95121618 Marina
- 72141213 Waterway construction service
- 95121623 Ro ro terminal
- 95121617 Dock
- 72141204 Dock construction service
- 72141211 Pier construction service
- 72141217 Ice management technical services
- 72141215 Underwater construction service
- 95121616 Pier
Show all 21
- 95121624 Lighthouse
- 95121620 Breakwater
- 95121621 Seawall
- 95121615 Quay or wharf
- 95121622 Ferry terminal building
- 95122505 Marine transfer station
- 95121619 Yacht harbor
- 72141207 Harbor construction service
- 72141210 Marina construction service
- 72141216 Offshore construction vessel service
- 72154009 Industrial dock and dock equipment installation service
- Points of contact
-
- Brian Dale bdale@cocoafl.org (321) 433-8833
- Diane Kozlak dkozlak@cocoafl.org
- Christine Savage csavage@cocoafl.org
Updated .
About this opportunity
The City of Cocoa is requesting sealed bids for construction of the Cocoa Waterfront Dock and Breakwater project ("Lee Wenner Day Docks"), a new day-slip marina facility at Lee Wenner Park, with bids due July 31, 2026 at 3:00 p.m. EST. A mandatory pre-bid conference was held July 9, 2026; the deadline to submit written questions was July 17, 2026. A 5% local preference applies to Brevard County contractors maintaining a physical business address in the county for at least six months prior to bid submission, though this preference may be restricted by Florida Inland Navigation District (FIND) grant regulations.
Bidders must be Florida-licensed general contractors with a minimum of ten years' experience performing similar work and active Florida business standing. The scope includes removal of existing damaged dock structures, installation of approximately 76 marine piles and new permanent concrete docks with finger piers, construction of riprap revetment along shoreline areas, installation of geotextile fabric and filter layers, and site preparation and cleanup. The project encompasses installation of three access piers, six finger piers, a main dock structure, approximately 1,281 cubic yards of proposed revetment with marine mattress protection, and 2,017 tons of armor stone. 14-inch square pre-stressed concrete piles designed for 6,000 PSI saltwater applications and 80 PSF live load capacity are specified. The contractor must commence work within ten days of Notice to Proceed and achieve substantial completion within 330 calendar days, with final completion within 30 days thereafter.
The project is subject to extensive environmental compliance requirements including U.S. Army Corps of Engineers Nationwide Permits 13 and 28 (valid through March 15, 2031), St. Johns River Water Management District permit with manatee protection conditions, and National Oceanic and Atmospheric Administration Project Design Criteria for in-water activities protecting endangered species. A 5% bid security bond (or equivalent cash/certified check) is required, with performance and payment bonds equaling 100% of contract amount due within 15 days of award. Liquidated damages for delays in substantial completion range from $956 to $2,712 daily depending on total contract value. The City of Cocoa is responsible for obtaining Water Management District and USACE permits; contractors must obtain all other required permits and associated fees. An Addendum 1 was issued July 22, 2026 addressing 29 clarifications regarding technical requirements, pile design, stone gradation, turbidity monitoring, manatee protection, and FIND grant compliance obligations.
Opportunity text
The City of Cocoa is seeking bids from qualified contractors for the Cocoa Waterfront Dock and Breakwater project (known as the "Lee Wenner Day Docks). This project consists of the construction of a new day-slip marina facility at Lee Wenner Park intended to enhance public waterfront access and improve recreational boating opportunities within the area. The scope of work includes the installation of new permanent concrete docks, finger piers, marine piles, and all associated components required for a complete and operational day-slip facility. This project is being funded in part by a Florida Inland Navigation District (FIND) grant. The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary for the successful completion of the Cocoa Waterfront Dock Replacement and Shoreline Protection Improvements Project located at Lee Wenner Park, 300 Riveredge Blvd., Cocoa, FL 32922. Please refer to the Bid Documents and Exhibits A and B for the complete set of requirements and components included in this project.