27001046 P23-10 City of Midland Paving, Alleys, Streets & Sidewalks 06 & Downtown Alley -1 Paving Improvements & Bulb-out
Closed State & local contract opportunity Posted
- Solicitation number
- 27001046
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91240 Demolition Services
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91327 Construction, Highway And Road
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
Show all 16
- 91378 Maintenance And Repair, Pipeline (Includes Removal And Relocation)
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 91389 Maintenance And Repair, Utility/Underground Projects
- 91392 Maintenance And Repair, Water System, Main And Service Line
- 91396 Paving/Resurfacing, Street (Major And Residential)
Opportunity details come from midlandtexas.bonfirehub.com. Updated .
About this opportunity
The City of Midland, Texas is requesting sealed bids for paving, alley, street, sidewalk, and water utility improvements across multiple locations under Project P23-10, with bids due November 5, 2026. A local-vendor preference under Texas Local Government Code 271.9051 applies: local bidders (principal place of business within Midland city limits) whose bids are within five percent of the lowest non-local bid may be awarded if the City Council determines they offer the best combination of price and economic development opportunities, including local employment and tax revenue.
The scope encompasses three components: COMPASS 06 paving and water utility work at two locations (Camp Street to Marienfeld Street and Industrial Avenue to Florida Avenue; Lamesa Road to Madison Street and Orchard Lane to Davis Avenue); Downtown Alley-1 paving improvements between Illinois Avenue and Texas Avenue; and bulb-out installations along Main Street. Work includes mobilization, erosion and sediment control, traffic control, demolition of existing pavement and utilities, installation of 8-inch and 12-inch PVC water mains with valves and fire hydrants, jointed concrete and HMAC asphalt pavement, concrete curbs, gutters, sidewalks, and related appurtenant work. Contractors must hold active Water Operator D and either Wastewater D or Class 1 Collections licenses throughout performance. Substantial completion is required within 270 calendar days from Notice to Proceed. All testing costs (slump, density, pressure, bacterial, air, mandrel, hydrostatic, CCTV) are the contractor's responsibility. Quality-factor reductions apply cumulatively for surface tolerance, thickness, and compaction deficiencies in asphaltic concrete, with factors ranging from 0 to 1.0 based on severity.
Bidders must submit a 5% bid guaranty (certified check, bank money order, or approved bidder's bond), Performance Bond and Payment Bond each equal to 100% of total contract price, and complete affidavit of eligibility for local preference consideration. All bids must comply unmodified with contract documents; any revisions render proposals non-responsive. A one-year warranty period applies after project acceptance. Proposals remain effective for 30 days after bid opening. The City will use Procore for construction management, submittals, inspections, and invoicing. Final payment is due 30 to 35 days after Certificate of Completion, with 5% retainage held until all work is accepted.
Opportunity text
The Proposed Work provides for the furnishing of materials and labor for City of Midland Paving, Alleys, Streets & Sidewalks 06 & Downtown Alley-1 Paving Improvements & Bulb-out together with other miscellaneous and appurtenant work. COMPASS 06: Paving and water utility project occurring in two separate locations. The first location is generally from Camp Street to Marienfeld Street and Industrial Avenue to Forida Avenue. The second location is generally from Lamesa Road to Madison Street, and Orchard Lane to Davis Avenue. Downtown Alley -1 : Paving Improvements along the Downtown Alley from Illinois Avenue and Texas Avenue. Bulb Out: Adding Bulb-outs along the Main St.