11-010 Pay Notes Pvng Util.pdf

PDF 156 KB Posted

Attached to
27001046 P23-10 City of Midland Paving, Alleys, Streets & Sidewalks 06 & Downtown Alley -1 Paving Improvements & Bulb-out
Solicitation number
27001046
Issued by
Mason County, Texas

About this file

This is a Pay Notes document for the City of Midland, Texas, establishing detailed bid items and payment terms for Project P23-10, which encompasses paving and water utility improvements across multiple locations including COMPASS 06 (two separate areas from Camp Street to Marienfeld Street and Industrial Avenue to Florida Avenue, and from Lamesa Road to Madison Street and Orchard Lane to Davis Avenue), Downtown Alley-1 paving improvements along the downtown alley between Illinois Avenue and Texas Avenue, and bulb-out additions along Main Street. The project is organized into four primary work categories: Miscellaneous Items (mobilization, erosion/sediment control, traffic control, and job site safety, each measured monthly); Demolition Items (seven pay items including flowable fill for abandoned pipes, removal and disposal of existing water main, pavement, concrete sidewalks, curbs and gutters, and fencing, measured per linear feet or square yards); Water Items (fourteen pay items including installation of 8-inch and 12-inch AWWA C-900 DR18 PVC water mains, ductile iron fittings, steel casings, gate valves, fire hydrant assemblies, dresser couplings, tapping saddles, water service connections, service laterals, and open trenching, measured per linear feet or by unit); and Paving Items (twenty-eight pay items including subgrade preparation, jointed concrete pavement, transition slabs, HMAC asphalt surface course, concrete curbs and gutters, flexible base, bituminous prime and tack coats, concrete ramps, fillets, valley gutters, alley approaches, driveway approaches, sidewalks, utility and meter box adjustments, fire hydrant relocation, reinforced concrete pavement and bulb-outs, and washed gravel, measured per square yards or linear feet).

The Pay Notes document establishes measurement and payment methodologies for all bid items, with compensation structured per unit of work completed (per month for ongoing items, per linear foot for pipe and curb work, per square yard for pavement and concrete work, and per each for discrete installations). All work must comply with City of Midland standards and specifications as shown on construction drawings, with job site safety designated as the contractor's responsibility in accordance with OSHA and local requirements. The document emphasizes that contractors receive no additional compensation for depths exceeding those specified, saw-cut pavement edges must be full depth and cleanly defined, flexible base must be compacted to 95 percent density per ASTM D1557, and all fittings must be C153 ductile iron compact fittings with weights established from the Tyler Union Quality Waterworks Products Catalog (December 2014), with nuts, bolts, glands, and accessories considered subsidiary to fitting weight.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Quantity Note

Miscellaneous Items

1 Mobilization M1

2 Erosion/Sediment Control M2

3 Traffic Control M3

4 Job Site Safety M4

Demolition Items

1 Flowable Fill for Existing Pipes Abandon In Place D1

2 Removal & Disposal of Existing Water Main D2

3 Removal & Disposal of Existing Unclassified Pavement D3

4 Removal & Disposal of Existing Unclassified Concrete Pavement D4

5 Removal & Disposal of Existing Concrete Sidewalk & Ramp D5

6 Removal & Disposal of Existing Concrete Curb & Gutter D6

7 Disposal of Existing Fence D7

Water Items

1 8" AWWA C-900 DR18, PVC, Water Main W1

2 12" AWWA C-900 DR18, PVC, Water Main W1

3 Ductile Iron Fittings W2

4 12" Steel Casing W3

5 24" Steel Casing W3

6 8" Gate Valve & Box (MJxMJ/FL) W4

7 12" Gate Valve & Box (MJxMJ/FL) W4

8 Fire Hydrant Assembly W5

9 8" Dresser Coupling W6

10 12" Dresser Coupling W6

11 8"x1" Tapping Saddle W7

12 1" Water Service Connection W8

13 Water Service Lateral & Water Meter W9

14 Open Trenching of Water Main W10

PAY NOTES

City of Midland Pavement, Alleys,Streets and Sidewalks 06 & Downtown Alley-1 Paving Improvements & Bulb-out

Bid Item

P23-10

Paving Items

1 Subgrade Preparation (Depth ≤ 8") P1

2 7" Jointed Concrete Pavement P2

3 7" Transition Concrete Slab P3

2" Type D HMAC Asphalt Pavement Surface Course (PG70-22, 110 LBS / SY @ 1"

Thick) P4

5 6" Type I Sawtooth Concrete curb & Gutter P5

6 Transition to Laydown Curb P6

7 8" Flexible Base (Type A, Grade 4) P7

8 6" Flexible Base (Type A, Grade 4) P7

9 Bituminous Prime Coat (MC-30, 0.20 Gal / SY) P8

10 Bituminous Tack Coat (MC-30, 0.20 Gal / SY) P9

11 Type 8 Concrete Diagonal Curb Ramp P10

12 6" Concrete Fillet P11

13 6" Concrete Valley Gutter P12

14 6" Concrete Alley Approach P13

15 6" Commercial Concrete Driveway Approach P14

16 6" Residential Concrete Driveway Approach P14

17 Type A Concrete Curb & Gutter P15

18 Type C Concrete Curb & Gutter P15

19 Type D Concrete Laydown Curb & Gutter P15

20 4" Concrete Sidewalk P16

21 Utility Manhole Adjustment P17

22 Wastewater Manhole Ring & Cover Adjustment P17

23 Water Valve Box Ring & Cover Adjustment P17

24 Meter Box Adjustment P18

25 Relocate Existing Fire Hydrant P19

26 6" Reinforced Concrete Bulb-Out P20

27 6" Continuously Reinforced Concrete Pavement P21

28 4-6" Washed Gravel P22

M1

M2

M3

M4

D1

D2

D3

D4

D5

D6

D7 Includes the necessary equipment, labor, materials, and incidentals for the Disposal of Existing Fence per the construction drawings and City of Midland standards and specifications, including removal of all gates, columns, posts, foundations, anchors, and structures as well as excavation, backfill, cutting, and appurtenances. Measurement and payment to be made per Linear Feet measured along the ground surface following the fence centerline through all

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing

Unclassified Concrete Pavement per the construction drawings and City of Midland standards and specifications including all pavement removal, saw-cutting, and appurtenances. Depths given are approximate and pavement material is to be removed in its entirety. No additional compensation will be made for increased pavement depth removal. Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Concrete

Curb & Gutter per the construction drawings and City of Midland standards and specifications, including all appurtenances. Measurement and payment to be made per linear foot.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Concrete

Sidewalk & Ramps per the construction drawings and City of Midland standards and specifications, including all appurtenances. Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for all Mobilization to the job site complete and in place. Measurement and payment to be made per month

Includes the necessary equipment, labor, materials, and incidentals to implement the Erosion Control Plan per the construction drawings and City of Midland standards and specifications, including the placement, maintenance, and removal of all temporary erosion control measures and infrastructure. Measurement and payment to be made per month.

Includes the necessary equipment, labor, materials, and incidentals to implement the Traffic Control per the approved

Traffic Control Plan, including the placement, maintanence, and removal of all temporary traffic control measures and devices. Any required traffic control devices are to meet the City of Midland Traffic Division Standards. Measurement and payment to be made per month.

Includes the necessary equipment, labor, materials, and incidentals to implement Job Site Safety and to provide a safe work environment for the project work area (including all personal protection equipment, trench safety, etc.) per the construction drawings and in compliance with all applicable Federal, State, and Local requirements or regulations including those of OSHA and the City of Midland. JOB SITE SAFETY IS THE RESPONSABILITY OF THE

CONTRACTOR. Measurement and payment to be made per month.

Includes the necessary equipment, labor, materials, and incidentals for the Placement of Flowable Fill for Existing

Pipes Abandoned In Place (Portalnd Cement 2-Sack = 188 LBS/CY) per the construction Drawings and City of

MIdland standards and specifications, including all plugging or caping the pipe to be abandoned, and appurtenances.

Measurement and payment to be made per cubic yard volume of flowable fill placed in pipe abandoned in place.

Includes the necessary equipment, labor, materials, and incidentals for the Remove & Disposal Existing Water Main per the construction drawings and City of Midland standards and specifications including all pavement removal, saw-cutting, and appurtenances. Depths given are approximate and pavement material is to be removed in its entirety. No additional compensation will be made for increased pavement depth removal. Measurement and payment to be made per Linear Feet measured along the ground surface follwing the pipe centerline through all valves, manholes, fitting, junctions, structures, amd appurtenances.

PAY QUANTITY NOTES

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing

Unclassified Pavement per the construction drawings and City of Midland standards and specifications including all pavement removal, saw-cutting, and appurtenances. Depths given are approximate and pavement material is to be removed in its entirety. No additional compensation will be made for increased pavement depth removal. Saw-cut

Pavement edges are to be full pavement depth, cleanly cut, and clearly defined edges free of breaks. Measurement and payment to be made per square yard of unclassified pavement removed.

W1

W2

W3

W4

W5

W6

W7

W8

W9

W10

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Fire Hydrant Assembly per the construction drawings and City of Midland standards and specifications, including all risers, embedment, gravel sump, thrust blocking, necessary testing, and appurtenances. Measurement and payment to be made per each fire hydrant assembly installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Water Mains per the construction drawings and City of Midland standards and specifications, including all embedment, detector wire, tracer tape, necessary testing, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Ductile Iron Fitting per the

Construction drawings and City of Midland Standards and Specification, includig all embedment, wrapping, thrust blocking, joint restraints, and appurtenances. All fittings are to be C153 ductile Iron compact fittings. Fitting weights are established from Tyler Union Quality Waterworks Products Catalog PC-U2014, December, 2014 and payment will be made at the standard compact weigt. Nuts,bolds, glands, and other associated accessories are not included as part of the fitting weight and are considered subsidiary to the weight of the fitting. Any additional requires fittings not shown on the drawings will be paid for at weights established in the Tyler Union Waterworks Catalog.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Gate Valve & Box per the construction drawings and City of Midland standards and specifications, including all embedment, valve box, joint restraint, thrust blocking, concrete collar, and appurtenances. Measurement and payment to be made per each valve and box installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Steel Casing per the construction drawings and City of Midland standards and specifications, including all joint restraints, embedment, thrust blocking, and appurtenances. Measurement and payment to be made per Linear Feet Steel Casing installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Water Service Connection per the construction drawings and City of Midland standards and specifications, including all brass goods from the corporation stop to the brass angle valve (inclusive), as well as the installation of a new meter box and all appurtenances. Measurement and payment to be made per each water service connection installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Dresser Coupling per the construction drawings and City of Midland standards and specifications, including all embedment, wrapping, thrust blocking, and appurtenances. Measurement and payment to be made per each dresser coupling installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Water Service Lateral Pipe per the construction drawings and City of Midland standards and specifications, including all excavation, embedment, backfill, polyethylene service line or other pipe, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for Open Trenching of Water Main per the construction drawings and City of Midland standards and specifications, including all unclassified excavation, backfill not including flowable fill backfill, providing trench safety and protection for workers to install pipe, structures, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all structures, fittings, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Tapping Saddle for a water service connection per the construction drawings and City of Midland standards and specifications, including all embedment, wrapping, thrust blocking, and appurtenances. Measurement and payment to be made per each Tapping

Saddle installed.

P1

P2

P3

P4

P5

P6

P7

P8

P9

P10

P11

Includes the necessary equipment, labor, materials, and incidentals for Subgrade Preparation per the construction drawings and City of Midland standards and specifications, including all proof-rollling, sub-grade reworking, scarifying, compaction, and appurtenances. Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Diagonal Curb Ramp per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Fillet per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Curb section is formed and poured monolithically with fillet and is not a separate bid item. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Type I Sawtooth concrete Curb &

Gutter per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, finishing, and appurtenances. Measurement and payment to be made per Linear Foot of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Transition to Laydown Curb per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, finishing, and appurtenances. Measurement and payment to be made per Linear Foot of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of concrete slab per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for the placement of Type "D" HMAC Asphalt

Pavement Surface Course (PG 70-22, 110 LBS / SY at 1" thick) per the construction drawings and City of Midland standards and specifications, including all placement, compaction, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for application of Tack Coat (MC-30, 0.10 GAL /

SY) per the construction drawings and City of Midland standards and specifications, including all appurtenances.

Measurement and payment to be made per gallon of material applied at the designated rate.

Includes the necessary equipment, labor, materials, and incidentals for application of Bituminous Prime Coat (MC-30,

0.20 GAL / SY) per the construction drawings and City of Midland standards and specifications, including all appurtenances. Measurement and payment to be made per gallon of material applied at the designated rate.

Includes the necessary equipment, labor, materials, and incidentals for placement of Flexible Base compacted to 95%

Density, ASTM D1557, per the construction drawings and City of Midland standards and specifications including all placement, compaction, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Jointed Concrete Pavement per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

P12

P13

P14

P15

P16

P17

P18

P19

P20

P21

P22

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Valley Gutter per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Alley Approach per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Pedestrian access ramps at the alley approach are considered part of the approach and are not a separate bid item. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for Meter Box & Cover Adjustment per the construction drawings and City of Midland standards and specifications including all placement and appurtenances.

Measurement and payment to be made per each adjustment made.

Includes the necessary equipment, labor, materials, and incidentals for Fire Hydrant Relocation per the construction drawings and City of Midland standards and specifications including all placement and appurtenances. Measurement and payment to be made per each relocation made.

Includes the necessary equipment, labor, materials, and incidentals for placement of Continuously Reinforced

Concrete Pavement per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Reinforced Concrete Bulb-Out per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Measurement and payment to be made per each Block installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Gravel per the consturction drawings and City of Midland standards and specifications, including all excavation, erosion control or filter blankets, placement, and appurtenances. Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Driveway Approach per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. Pedestrian access ramps at the driveway approach are considered part of the approach and are not a separate bid item. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Curb & Gutter per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, finishing, and appurtenances. Measurement and payment to be made per linear foot of material placed measured along the back-of-curb.

Includes the necessary equipment, labor, materials, and incidentals for placement of Concrete Sidewalk per the construction drawings and City of Midland standards and specifications, including all forming, reinforcement, placement, jointing, finishing, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for Ring & Cover Adjustment per the construction drawings and City of Midland standards and specifications including all forming, reinforcement, placement, jointing, sealing, finishing, and appurtenances. This includes a minimum 1.0' wide concrete collar whose width is measured from the outer edge of the cover to the outer edge of the concrete ring. Measurement and payment to be made per each adjustment made.