SOLICITATION CANCELED: SEA ATCT and S46 TRACON Major Mechanical Upgrades

Closed Solicitation Posted

Solicitation number
697DCK-24-R-00423
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Seattle, Washington, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Aviation Administration Southwestern Region is seeking proposals for the SEA ATCT and S46 TRACON Major Mechanical Upgrades project. The scope of work includes the replacement of chillers, boilers, and cooling towers at the Seattle TRACON (S46) and Seattle ATCT (SEA) facilities, as detailed in the plans and specifications. This is a full and open competition under NAICS code 238220 for Plumbing, Heating and Air Conditioning Contractors. Proposals are due by August 8, 2024 at 12:00 PM Central Time, and the award will be made to the responsive and responsible offeror providing the best value to the FAA based on the evaluation criteria.

The contract is not set aside for any special designation. No incumbent or current contractor information is provided. The estimated project magnitude is between $5,000,000 and $10,000,000, with a 12-month period of performance from the notice to proceed. The work will be performed in Seattle, Washington.

Notice text

6 versions

Update #6 · Latest ·

*******UPDATE:  As of today, August 20, 2024, this solicitation is hereby canceled.*******

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

*************************************************************************************

AMENDMENT 04:

Purpose of Amendment 04 is to address a clarification to the bid alternate 1 for S46 that was inadvertently left off Amendment 03 as follows:

FIRST:  A request for clarification was received for the following:

QUESTION: On the drawings sheet F215 note 1 it is calling for a 3rd alternate.  Do you want this bid as an alternate or as part of the base bid or not at all?

FAA RESPONSE: Bid alternate 1 for S46 is adding a redundant HVAC unit. On page F216 of the drawing that sheet note is referencing that the existing Fire Alarm Control Panel is to remain since it is recently upgraded. The note is basically saying if the bid alternate 1 is done, then it needs to factor in adding a duct detector if that unit is installed with additional duct work. This is not a third bid alternate. It should be part of the bid alternate 1.

*******************************

SECOND: The due date for proposals remains unchanged and set for August 08, 2024 @ Noon Central Time.

*******************************

THIRD: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 03:

Purpose of Amendment 03 is to provide further clarification to a question found within the Q&A, remove one of the requirements found within the specifications, and extend the proposal due date as outlined below:

******************************
FIRST: A clarification was received based on question #9 found on the "Q&A" that was previously released and it stated the following:

QUESTION: It appears that abatement needs to take place for this project, but I don’t have any way to know where it is at or how much there is. I don’t see an abatement report for either building and have only found reports to fill out for the superintendent during the project. Is it possible to get an abatement report that will indicate where and how much abatement work there will be in this project (for each building)?

FAA RESPONSE: The FAA can provide the reports. We are not requiring abatement if work is not being performed in that area. This answer was to provide awareness of where there is concern in case the Contractor needs to do work in those areas. The following additional attachments are hereby released to provide further support to this clarification: J-10a_SEA TRACON Asbestos Report 2015 1 J-10b_SEA TRACON O-M Plan 2015 1 J-10c_SEA-ATCT Building Survey Report 3.20.2015 1 J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1

******************************

SECOND: Attachments J-2_Specifications_Seattle TRACON (S46) and J-3_Specification_Seattle ATCT are hereby updated to reflect the following changes:

Attachment J-2_Specifications_Seattle TRACON (S46) is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 186-187.

Attachment J-3_Specification_Seattle ATCT is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 182-183.

******************************
THIRD: The due date for proposals is hereby extended as follows: FROM: August 05, 2024, Noon Central Time (CT) TO: August 08, 2024, Noon Central Time (CT)

******************************

FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 02:

FIRST: The official Question and Answer (Q&A) dated July 26, 2024, is hereby released.
******************************
SECOND: Price sheets, S46 TRACON (J-6) and SEA ATCT (J-7) have been updated to include the Alternate Bid items and are hereby released.

******************************

THIRD: The due date for proposals is hereby extended as follows:


FROM: August 02, 2024, Noon Central Time (CT)


TO: August 05, 2024, Noon Central Time (CT)


******************************
FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 01:
Purpose of amendment 01 is to extend the due date for questions and proposals as outlined below:

FIRST:  The due date for questions is hereby extended as follows:

FROM:  July 12, 2024, Noon Central Time (CT)

TO: July 19, 2024, Noon Central Time (CT)

******************************

SECOND: The due date for proposals is hereby extended as follows: 

FROM:  July 31, 2024, Noon Central Time (CT)

TO: August 02, 2024, Noon Central Time (CT)

******************************

THIRD:  All other terms and conditions remain unchanged and in full effect.
 

Update #5 ·

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

*************************************************************************************

AMENDMENT 04:

Purpose of Amendment 04 is to address a clarification to the bid alternate 1 for S46 that was inadvertently left off Amendment 03 as follows:

FIRST:  A request for clarification was received for the following:

QUESTION: On the drawings sheet F215 note 1 it is calling for a 3rd alternate.  Do you want this bid as an alternate or as part of the base bid or not at all?

FAA RESPONSE: Bid alternate 1 for S46 is adding a redundant HVAC unit. On page F216 of the drawing that sheet note is referencing that the existing Fire Alarm Control Panel is to remain since it is recently upgraded. The note is basically saying if the bid alternate 1 is done, then it needs to factor in adding a duct detector if that unit is installed with additional duct work. This is not a third bid alternate. It should be part of the bid alternate 1.

*******************************

SECOND: The due date for proposals remains unchanged and set for August 08, 2024 @ Noon Central Time.

*******************************

THIRD: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 03:

Purpose of Amendment 03 is to provide further clarification to a question found within the Q&A, remove one of the requirements found within the specifications, and extend the proposal due date as outlined below:

******************************
FIRST: A clarification was received based on question #9 found on the "Q&A" that was previously released and it stated the following:

QUESTION: It appears that abatement needs to take place for this project, but I don’t have any way to know where it is at or how much there is. I don’t see an abatement report for either building and have only found reports to fill out for the superintendent during the project. Is it possible to get an abatement report that will indicate where and how much abatement work there will be in this project (for each building)?

FAA RESPONSE: The FAA can provide the reports. We are not requiring abatement if work is not being performed in that area. This answer was to provide awareness of where there is concern in case the Contractor needs to do work in those areas. The following additional attachments are hereby released to provide further support to this clarification: J-10a_SEA TRACON Asbestos Report 2015 1 J-10b_SEA TRACON O-M Plan 2015 1 J-10c_SEA-ATCT Building Survey Report 3.20.2015 1 J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1

******************************

SECOND: Attachments J-2_Specifications_Seattle TRACON (S46) and J-3_Specification_Seattle ATCT are hereby updated to reflect the following changes:

Attachment J-2_Specifications_Seattle TRACON (S46) is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 186-187.

Attachment J-3_Specification_Seattle ATCT is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 182-183.

******************************
THIRD: The due date for proposals is hereby extended as follows: FROM: August 05, 2024, Noon Central Time (CT) TO: August 08, 2024, Noon Central Time (CT)

******************************

FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 02:

FIRST: The official Question and Answer (Q&A) dated July 26, 2024, is hereby released.
******************************
SECOND: Price sheets, S46 TRACON (J-6) and SEA ATCT (J-7) have been updated to include the Alternate Bid items and are hereby released.

******************************

THIRD: The due date for proposals is hereby extended as follows:


FROM: August 02, 2024, Noon Central Time (CT)


TO: August 05, 2024, Noon Central Time (CT)


******************************
FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 01:
Purpose of amendment 01 is to extend the due date for questions and proposals as outlined below:

FIRST:  The due date for questions is hereby extended as follows:

FROM:  July 12, 2024, Noon Central Time (CT)

TO: July 19, 2024, Noon Central Time (CT)

******************************

SECOND: The due date for proposals is hereby extended as follows: 

FROM:  July 31, 2024, Noon Central Time (CT)

TO: August 02, 2024, Noon Central Time (CT)

******************************

THIRD:  All other terms and conditions remain unchanged and in full effect.
 

Update #4 ·

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

AMENDMENT 03:

Purpose of Amendment 03 is to provide further clarification to a question found within the Q&A, remove one of the requirements found within the specifications, and extend the proposal due date as outlined below:

******************************
FIRST: A clarification was received based on question #9 found on the "Q&A" that was previously released and it stated the following:

QUESTION: It appears that abatement needs to take place for this project, but I don’t have any way to know where it is at or how much there is. I don’t see an abatement report for either building and have only found reports to fill out for the superintendent during the project. Is it possible to get an abatement report that will indicate where and how much abatement work there will be in this project (for each building)?

FAA RESPONSE: The FAA can provide the reports. We are not requiring abatement if work is not being performed in that area. This answer was to provide awareness of where there is concern in case the Contractor needs to do work in those areas. The following additional attachments are hereby released to provide further support to this clarification: J-10a_SEA TRACON Asbestos Report 2015 1 J-10b_SEA TRACON O-M Plan 2015 1 J-10c_SEA-ATCT Building Survey Report 3.20.2015 1 J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1

******************************

SECOND: Attachments J-2_Specifications_Seattle TRACON (S46) and J-3_Specification_Seattle ATCT are hereby updated to reflect the following changes:

Attachment J-2_Specifications_Seattle TRACON (S46) is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 186-187.

Attachment J-3_Specification_Seattle ATCT is hereby updated to reflect the redaction/removal of 1.12 INDEPENDENT QUALITY CONTROL ORGANIZATION (CQC) found on pages 182-183.

******************************
THIRD: The due date for proposals is hereby extended as follows: FROM: August 05, 2024, Noon Central Time (CT) TO: August 08, 2024, Noon Central Time (CT)

******************************

FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 02:

FIRST: The official Question and Answer (Q&A) dated July 26, 2024, is hereby released.
******************************
SECOND: Price sheets, S46 TRACON (J-6) and SEA ATCT (J-7) have been updated to include the Alternate Bid items and are hereby released.

******************************

THIRD: The due date for proposals is hereby extended as follows:


FROM: August 02, 2024, Noon Central Time (CT)


TO: August 05, 2024, Noon Central Time (CT)


******************************
FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 01:
Purpose of amendment 01 is to extend the due date for questions and proposals as outlined below:

FIRST:  The due date for questions is hereby extended as follows:

FROM:  July 12, 2024, Noon Central Time (CT)

TO: July 19, 2024, Noon Central Time (CT)

******************************

SECOND: The due date for proposals is hereby extended as follows: 

FROM:  July 31, 2024, Noon Central Time (CT)

TO: August 02, 2024, Noon Central Time (CT)

******************************

THIRD:  All other terms and conditions remain unchanged and in full effect.
 

Update #3 ·

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

AMENDMENT 02:

FIRST: The official Question and Answer (Q&A) dated July 26, 2024, is hereby released.
******************************
SECOND: Price sheets, S46 TRACON (J-6) and SEA ATCT (J-7) have been updated to include the Alternate Bid items and are hereby released.

******************************

THIRD: The due date for proposals is hereby extended as follows:


FROM: August 02, 2024, Noon Central Time (CT)


TO: August 05, 2024, Noon Central Time (CT)


******************************
FOUR: All other terms and conditions remain unchanged and in full effect.

*************************************************************************************

AMENDMENT 01:
Purpose of amendment 01 is to extend the due date for questions and proposals as outlined below:

FIRST:  The due date for questions is hereby extended as follows:

FROM:  July 12, 2024, Noon Central Time (CT)

TO: July 19, 2024, Noon Central Time (CT)

******************************

SECOND: The due date for proposals is hereby extended as follows: 

FROM:  July 31, 2024, Noon Central Time (CT)

TO: August 02, 2024, Noon Central Time (CT)

******************************

THIRD:  All other terms and conditions remain unchanged and in full effect.
 

Update #2 ·

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

*************************************************************************************

AMENDMENT 01:
Purpose of amendment 01 is to extend the due date for questions and proposals as outlined below:

FIRST:  The due date for questions is hereby extended as follows:

FROM:  July 12, 2024, Noon Central Time (CT)

TO: July 19, 2024, Noon Central Time (CT)

******************************

SECOND: The due date for proposals is hereby extended as follows: 

FROM:  July 31, 2024, Noon Central Time (CT)

TO: August 02, 2024, Noon Central Time (CT)

******************************

THIRD:  All other terms and conditions remain unchanged and in full effect.
 

Update #1 ·

Seattle TRACON (S46) and Seattle ATCT (SEA) Major Mechanical Upgrades. The scope of work includes, but is not limited to, replacement of chillers, boilers, and cooling towers  as detailed in plans and specifications.

Files

File Type Posted
697DCK-24-R-00423_Amendment 04.pdf PDF
J-10a_SEA TRACON Asbestos Report 2015 1.pdf PDF
J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1.pdf PDF
J-10c_SEA-ATCT Building Survey Report 3.20.2015 1.pdf PDF
J-10b_SEA TRACON O-M Plan 2015 1.pdf PDF
697DCK-24-R-00423_Amendment 03.pdf PDF
J-3_Specifications_ Seattle ATCT (SEA)_Updated 8.1.2024.pdf PDF
J-2_Specifications_ Seattle TRACON (S46)_Updated 8.1.2024.pdf PDF
QA_ Major Mechanical Upgrades Seattle Tracon (S46) and Seattle ATCT (SEA).pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
697DCK-24-R-00423_Amendment 02.pdf PDF
J-6_Pricing Sheet_ S46 TRACON.docx DOCX document
697DCK-24-R-00423_Amendment 01.pdf PDF
Sign-in sheet.pdf PDF
J-5_Service Contract Act WD 2015-5535.pdf PDF
J-3a_SEA_Drawings_Seattle ATCT (SEA).pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
J-4_Wage Determination No. WA20240108.pdf PDF
J-9_BIL Data Report Form.xlsx XLSX spreadsheet
J-2_Specifications_ Seattle TRACON (S46).pdf PDF
J-3_Specifications_ Seattle ATCT (SEA).pdf PDF
J-1_Statement of Work for SEA_S46 and Seattle ATCT - Construction SOW.pdf PDF
J-6_Pricing Sheet_ S46 TRACON.docx DOCX document
J-2a_Drawings_Seattle TRACON (S46).pdf PDF
J-8_Past Performance Questionnaire.pdf PDF
697DCK-24-R-00423_Final.pdf PDF
Show all 26

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors