QA_ Major Mechanical Upgrades Seattle Tracon (S46) and Seattle ATCT (SEA).pdf
PDF 192 KB Posted
- Solicitation number
- 697DCK-24-R-00423
About this file
This document contains Questions and Answers related to the federal solicitation for Major Mechanical Upgrades at the Seattle TRACON (S46) and Seattle ATCT (SEA) facilities.
The key details are:
- The scope of work includes replacement of chillers, boilers, and cooling towers as detailed in the plans and specifications.
- The solicitation number is 697DCK-24-R-00423 and it is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region.
- The Questions and Answers provide clarification on topics such as badging requirements, night shift work, asbestos/lead paint, project phasing, temporary heating/cooling, material lead times, and existing building systems and warranties.
- The contract will be firm-fixed price with potential for period of performance extensions due to equipment lead times.
- There are two bid alternates related to a redundant air handling unit and a condenser water chemical treatment system.
- The contractor will be required to have a quality control manager and safety officer, but not a full-time dedicated project scheduler.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Major Mechanical Upgrades Seattle TRACON (S46) and Seattle ATCT (SEA)
Questions and Answers
July 26, 2024
1. Section M, Page 68, paragraph 3: For Tier 1, is the FAA’s definition for Small, Disadvantaged
Businesses (SDB) for socially disadvantaged and economically disadvantaged owned businesses only or does it include other programs such as HubZone and SDVOSB ?
FAA Response: SDB is a stand-alone category and does not automatically include HUBZone and/or SDVOSB status. Vendors would have to be self-certified in SAM as a SDB or be a certified
8 (a) to qualify for Tier I. As the solicitation is written, HUBZone and SDVOSB firms would be eligible in Tier II.
2. With these sites being secure and badging required, how many personnel can be badged per company or discipline?
FAA Response: Badging can be setup to get Contractor PIV badges. This will require going through security and doing appropriate background checks. Once a PIV card is obtained, an escort is no longer required within the facilities. The access badge is still on the HID proxy cards which are issued separately. Usually only the Foreman and/or Superintendent receives a badge.
On average 1-2 badges are allowed, but additional requests can be reviewed.
3. For previous projects in the past at these facilities, we have not been allowed to get everyone badged, how many non-badged personnel can a badged employee escort.
FAA Response: This is facility dependent. It is possible to get FAA PIV badges for key personnel and that allows the superintendents and other leads to escort unbadged personnel. When working, unbadged personnel must be within the vicinity of the PIV badged escort. The number of workers can vary depending on the location and type of work.
4. Can the badging process be completed at either facility or do subcontractor employees have to go to the Regional Office for badge processing?
FAA Response: Badge processing will be done at a designated office by the facility. The Regional Office is located south of the airport.
5. Will there be a requirement to work any night shifts? If so, how many nights are expected and in what areas?
FAA Response: Yes, night shifts will be required for work in operational spaces. Equipment cut overs may also be required to be performed at night due to risk to the facility operations during high traffic hours.
6. Will air scrubbers be required for any painting or other work that will create odors?
FAA Response: Work will require paint and chemicals with low VOC to limit odors. If that is not possible than other mitigations will have to be taken. These are manned facilities with operational staff in them at all hours of the day.
7. Is there a limit on how many vehicles are allowed in the gated areas for this work?
FAA Response: Yes, space is limited in each facility. Parking is reserved for onsite staff. Some space for essential vehicles will be provided. S46 has more space and SEA is very limited.
8. Will both of these projects run at the same time, or will one finish before the other gets started and which one would be first if that is the case?
FAA Response: This is addressed in the contract documentation. In the Construction SOW under section 1.
9. Is there asbestos or lead paint in either of these projects? Please provide the Hazardous material report for each project.
FAA Response: This is one single project with separate task orders.
For the SEA ATCT, asbestos is presumed in gaskets in various locations. In addition, 12” gray vinyl floor tile on the First Floor has been tested to contain 0.25” Asbestos. Approximately 1200 SF exists, however this will not be affected by the scope of this project.
For the S46 TRACON, asbestos is presumed in gaskets in various locations.
Hazardous material is addressed in contract documentation.
10. Can you send out the sign in sheet for this project?
FAA Response: If you are referring to the site visit sign-in sheet, yes. It has already been released as an attachment on SAM.gov.
11. Will work areas be vacated by government employees while work is being done or will the contractor need to work around existing employees during this contract?
FAA Response: These are 24-hour operating facilities. Please see contract documentation.
12. Will there be other contracts ongoing during this work that will interfere or complicate the schedule in any way?
FAA Response: This is a long project, and it is not clear if other work will be happening at this time. Other work is planned to be completed in the near future but has not been confirmed.
13. Please provide access flooring specifications and identify modifications for the new crac unit on the 15th floor. What manufacturer is the existing access floor?
FAA Response: The floor tiles are Maxcess R2F2 panels. They are rated for a design uniform load of 371.75 lbs/ ft2.
14. How long can the floor be opened up to modify the crac unites and add a new crac unit on the 15th floor? How much can be opened up and for how long?
FAA Response: This is dependent upon various factors such as outdoor temperatures which in return can affect in door temperatures. Close monitoring of the systems will be required. Safety barriers shall also be used when the floor is opened for extended periods of time and work is not in process.
15. Alternates are listed in the specifications but none are shown on the bid sheet. Please provide a bid form that indicates the alternates.
3.1 (TRACON S46)
SCHEDULE OF ALTERNATES
A. Alternate No.1: Redundant Air Handling Unit.
1. Base Bid: All work as indicated on the drawings.
2. Alternate: Add Redundant Air Handling Unit in the UPS/Switchgear Room as indicated on the drawings.
B. Alternate No.2: Condenser Water Chemical Treatment System.
1. Base Bid: All work as indicated on the drawings.
2. Alternate: Add Condenser Water Chemical Treatment System in the Chiller
Room as indicated on the drawings.
FAA Response: The bid price sheet will be updated to include the bid alternates.
16. The specifications are asking for a PM with a BS degree in Civil, Mechanical or Electrical degree and 10 years of experience. Please confirm this is a requirement.
FAA Response: No, see specifications section 01 31 00 – Project Management and Coordination, 1.7A. Bachelor of Science (BS) degree in Civil, Mechanical, or Electrical Engineering from an accredited institution of higher learning, or a technical degree and ten (10) years of experience with coordinating subcontractors on projects with complex mechanical, electrical, and control systems in the heavy construction industry.
17. Please confirm you are requiring a full-time scheduling person on this project with projects of 18 months or longer and 5 years minimum of experience.
FAA Response: Project scheduler is not specified to be full time. See specifications section 01 31 00 – Project Management and Coordination, 1.7C.
18. QCM with a minimum of 8 years of experience on equivalent projects?
FAA Response: Yes, this is confirmed. See specifications section 01 31 00 – Project Management and Coordination, 1.7D.
19. Under the QCM personal it states that this person will interact with the third-party QC firm/agency. Please confirm the contractor will not need to hire a third-party QC Team which will consist of 6 full time engineers in their respective fields of study.
FAA Response: Yes, see specifications section 01 40 00 – Quality Requirements, 1.12 D & E
20. If the contractor is to carry the independent 3rd party QC personal this is very expensive. Please ensure you have costs calculated into the FAA budget.
3rd party QC Team as in the specifications:
EXPERIENCE MATRIX
Area Qualifications
1. Concrete, Pavements, Utilities and Soils
Washington Registered Civil Engineer with
2 years related experience
2. Architectural Washington Registered Architect with 2 years related experience
3. Structural (Foundations & Structures) Washington Registered Structural Engineer with 2 years related experience
4. Mechanical Washington Registered Mechanical Engineer with 2 years related experience. Required knowledge of HVAC TAB,HVAC DDC and HVAC commissioning.
5. Electrical Washington Registered Electrical Engineer with 2 years related experience
6. Fire Protection Washington Registered Fire Protection
Engineer (FPE) with 2 years related experience
FAA Response: Yes, see specifications section 01 40 00 – Quality Requirements, 1.12 D & E
21. How many roof frames are we going to need for the S46 project per detail C3/S501?
FAA Response: This applies to the two boilers, so 2 roof openings are required.
22. How many screens will need to be removed for the ATCT project per detail C6/S510?
FAA Response: This is dependent on the means and methods from the contractor.
23. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
FAA Response: The QC Manager and SSHO cannot be the same person. See specification section 01 31 00 1.7.A-D and section 01 35 29 – 1.5A1.
24. Are there any phasing requirements?
FAA Response: Refer to the contract SOW. Project will start at the TRACON upon completion of that task order work will then begin at the ATCT. Refer to section 01 10 00 for details on phasing and coordination.
25. If the building remains occupied, how many people will be in the building?
FAA Response: Up to but no more than the occupancy limits. SEA and S46 are Tier 1 facilities that remain occupied 24 hours a day, 7 days a week. Amount of people in buildings will vary depending on various reasons.
26. Are there any temporary heating/cooling requirements?
FAA Response: See contract drawings referencing temporary heating/ cooling design. The facility is a 24-hour operational site, this requires that the equipment and spaces within the facility will be comfortable and within operating temperatures during the duration of the project.
27. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
FAA Response: Final period of performance will be determined when the contract gets awarded.
Accommodations to the PoP can be made due to extended lead times if alternate equipment is not available.
28. Please provide the contact information for the building controls contractor.
FAA Response: The current controls system is an Alerton product installed by ATS Automation.
29. Please provide the contact information for the building fire alarm company.
FAA Response: Fire alarm panels are JCI provided panels. The monitoring service reports directly to the Port of Seattle Fire Department.
30. Please confirm the manufacturer of the existing roofing system and who carries the current warranty of the roofing system.
FAA Response: The roofs are original and warranty on the roofing systems for both the TRACON and ATCT are expired.
31. What is the PSF rating of tile flooring on the ATCT facility underneath CRU’s & associated walkways on the 14th and ground floor?
FAA Response: The floor tiles are Maxcess R2F2 panels. They are rated for a design uniform load of 371.75 lbs/ ft2.
TRACON:
32. Temporary construction Drawing G005 shows a resident Engineer Trailer. Is this to be provided by the contractor or will the FAA provide this trailer?
FAA Response: A trailer for the Resident Engineers will not be required to be provided by the contractor. The laydown area shows a placeholder in the event one was needed for the RE.
33. Do the new mechanical pads need to be epoxy coated?
FAA Response: Material requirements are referenced in the design package. New mechanical pads do not need epoxy coating. Refer to specification 03 30 00 3.7B-C.
34. Plans indicate we can reuse existing conduit, wire and devices for this project. Please confirm.
FAA Response: Refer to the design drawings on demolition and installation plans. Only conduit may be reused where feasible.
ATCT:
35. Sheet Ad101 note C indicates to patch Deteriorated and damaged concrete decking and parapet wall upon exposure to existing roof deck and parapet. We will not know how much patch and repair will need to take place as it is not currently exposed. Can you give us an allowance to bid for the project so it can be adjusted up or down depending on how much repair is actually required?
FAA Response: That risk should be assessed by contractor. A reasonable amount should be factored in for this existing roof. This is a firm-fixed price contract.
36. Plans indicate we can reuse existing conduit, wire and devices for this project. Please confirm.
FAA Response: Refer to the design drawings on demolition and installation plans. Only conduit may be reused where feasible.