J-6_Pricing Sheet_ S46 TRACON.docx

DOCX document 14 KB Posted

Attached to
SOLICITATION CANCELED: SEA ATCT and S46 TRACON Major Mechanical Upgrades
Solicitation number
697DCK-24-R-00423
Issued by

About this file

This document appears to be a Pricing Sheet for the modernization of the S46 TRACON facility near the Seattle-Tacoma International Airport in Burien, WA. The Pricing Sheet includes line items for various construction disciplines, including General Requirements, Concrete, Electrical, HVAC, and others, with placeholders for the Contractor to provide labor, materials, and total costs. The total project cost, including profit and overhead, is to be provided at the bottom of the form.

The related federal contract opportunity is Solicitation Number 697DCK-24-R-00423 for the "SEA ATCT and S46 TRACON Major Mechanical Upgrades", issued by the Department of Transportation Federal Aviation Administration Southwestern Region. The scope of work includes, but is not limited to, the replacement of chillers, boilers, and cooling towers at the S46 TRACON and the Seattle ATCT (SEA) facilities.

View the file

Other files

File Type Posted
697DCK-24-R-00423_Amendment 04.pdf PDF
J-10c_SEA-ATCT Building Survey Report 3.20.2015 1.pdf PDF
J-3_Specifications_ Seattle ATCT (SEA)_Updated 8.1.2024.pdf PDF
J-10a_SEA TRACON Asbestos Report 2015 1.pdf PDF
J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1.pdf PDF
J-10b_SEA TRACON O-M Plan 2015 1.pdf PDF
J-2_Specifications_ Seattle TRACON (S46)_Updated 8.1.2024.pdf PDF
697DCK-24-R-00423_Amendment 03.pdf PDF
QA_ Major Mechanical Upgrades Seattle Tracon (S46) and Seattle ATCT (SEA).pdf PDF
J-6_Pricing Sheet_ S46 TRACON.docx DOCX document
697DCK-24-R-00423_Amendment 02.pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
697DCK-24-R-00423_Amendment 01.pdf PDF
Sign-in sheet.pdf PDF
J-4_Wage Determination No. WA20240108.pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
J-5_Service Contract Act WD 2015-5535.pdf PDF
J-3_Specifications_ Seattle ATCT (SEA).pdf PDF
J-1_Statement of Work for SEA_S46 and Seattle ATCT - Construction SOW.pdf PDF
J-2_Specifications_ Seattle TRACON (S46).pdf PDF
J-9_BIL Data Report Form.xlsx XLSX spreadsheet
J-3a_SEA_Drawings_Seattle ATCT (SEA).pdf PDF
J-8_Past Performance Questionnaire.pdf PDF
697DCK-24-R-00423_Final.pdf PDF
J-2a_Drawings_Seattle TRACON (S46).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SECTION B

SUPPLIES/SERVICES & PRICE/COST

The contractor must furnish all materials, labor, supervision, equipment, etc. to modernize the S46 TRACON located near the Seattle–Tacoma International Airport in Burien, WA in strict conformance to the solicitation/contract including the project Specifications and its attached drawings at the following prices:

Item Description $Labor $Materials $Labor & Materials

1General Requirements______________ _____________ ________________
2Existing Conditions______________ _____________ ________________
3Concrete______________ _____________ ________________
4Metals______________ _____________ ________________
5Wood and Plastics__________________________________________
6Thermal and Moisture______________ _____________ ________________
7Openings______________ _____________ ________________
8Finishes______________ _____________ ________________
9Plumbing______________ _____________ ________________
10HVAC______________ _____________ ________________
11Electrical______________ _____________ ________________
12Electronic Safety &
Security______________ _____________ ________________
13Earthwork______________ _____________ ________________
141-Year Service
Maintenance__________________________________________
14Subtotals______________ _____________ ________________
15PROJECT SUBTOTAL FOR LABOR AND MATIERALS:$________________
16PROFIT APPLIED TO LINE 15:________% $________________
17OVERHEAD AND G&A APPLIED TO LINE 15:________% $________________
18PROJECT GRAND TOTAL (Total of lines 15, 16, 17):$________________

Please indicate Grand Total cost for each asset, including labor and materials, profit, and overhead.

19ATCT Building$________________
20Base Building$________________
21PROJECT GRAND TOTAL (Same as line 18)$________________