J-6_Pricing Sheet_ S46 TRACON.docx
DOCX document 14 KB Posted
- Solicitation number
- 697DCK-24-R-00423
About this file
This document appears to be a Pricing Sheet for the modernization of the S46 TRACON facility near the Seattle-Tacoma International Airport in Burien, WA. The Pricing Sheet includes line items for various construction disciplines, including General Requirements, Concrete, Electrical, HVAC, and others, with placeholders for the Contractor to provide labor, materials, and total costs. The total project cost, including profit and overhead, is to be provided at the bottom of the form.
The related federal contract opportunity is Solicitation Number 697DCK-24-R-00423 for the "SEA ATCT and S46 TRACON Major Mechanical Upgrades", issued by the Department of Transportation Federal Aviation Administration Southwestern Region. The scope of work includes, but is not limited to, the replacement of chillers, boilers, and cooling towers at the S46 TRACON and the Seattle ATCT (SEA) facilities.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SECTION B
SUPPLIES/SERVICES & PRICE/COST
The contractor must furnish all materials, labor, supervision, equipment, etc. to modernize the S46 TRACON located near the Seattle–Tacoma International Airport in Burien, WA in strict conformance to the solicitation/contract including the project Specifications and its attached drawings at the following prices:
Item Description $Labor $Materials $Labor & Materials
| 1 | General Requirements | ______________ _____________ ________________ | |||
| 2 | Existing Conditions | ______________ _____________ ________________ | |||
| 3 | Concrete | ______________ _____________ ________________ | |||
| 4 | Metals | ______________ _____________ ________________ | |||
| 5 | Wood and Plastics | ______________ | _____________ | _______________ | |
| 6 | Thermal and Moisture | ______________ _____________ ________________ | |||
| 7 | Openings | ______________ _____________ ________________ | |||
| 8 | Finishes | ______________ _____________ ________________ | |||
| 9 | Plumbing | ______________ _____________ ________________ | |||
| 10 | HVAC | ______________ _____________ ________________ | |||
| 11 | Electrical | ______________ _____________ ________________ | |||
| 12 | Electronic Safety & | ||||
| Security | ______________ _____________ ________________ | ||||
| 13 | Earthwork | ______________ _____________ ________________ | |||
| 14 | 1-Year Service | ||||
| Maintenance | ______________ | _____________ | _______________ | ||
| 14 | Subtotals | ______________ _____________ ________________ |
| 15 | PROJECT SUBTOTAL FOR LABOR AND MATIERALS: | $________________ | ||
| 16 | PROFIT APPLIED TO LINE 15: | ________% $________________ | ||
| 17 | OVERHEAD AND G&A APPLIED TO LINE 15: | ________% $________________ | ||
| 18 | PROJECT GRAND TOTAL (Total of lines 15, 16, 17): | $________________ |
Please indicate Grand Total cost for each asset, including labor and materials, profit, and overhead.
| 19 | ATCT Building | $________________ | |
| 20 | Base Building | $________________ | |
| 21 | PROJECT GRAND TOTAL (Same as line 18) | $________________ |
File details come from the government source that posted it. Updated .