J-7_Pricing Sheet_ SEA ATCT and Base Building.docx
DOCX document 14 KB Posted
- Solicitation number
- 697DCK-24-R-00423
About this file
This document is a pricing sheet for the "SEA ATCT and Base Building" modernization project at the Seattle-Tacoma International Airport. The contractor must provide all materials, labor, supervision, and equipment to modernize the air traffic control tower (ATCT) and base building in accordance with the solicitation and contract requirements, including specifications and drawings.
The pricing sheet identifies 13 line items for the various construction components, such as general requirements, concrete, HVAC, electrical, and exterior improvements. Contractors must provide labor, materials, and total costs for each line item. The pricing sheet also includes the project subtotal, profit, overhead and general and administrative (G&A) costs, and the grand total for the entire project. Separate grand total costs are required for the ATCT building and the base building.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SECTION B
SUPPLIES/SERVICES & PRICE/COST
The contractor must furnish all materials, labor, supervision, equipment, etc. to modernize the SEA ATCT and Base Building located at the Seattle–Tacoma International Airport in SeaTac, WA in strict conformance to the solicitation/contract including the project Specifications and its attached drawings at the following prices:
Item Description $Labor $Materials $Labor & Materials
| 1 | General Requirements | ______________ _____________ ________________ | |||
| 2 | Existing Conditions | ______________ _____________ ________________ | |||
| 3 | Concrete | ______________ _____________ ________________ | |||
| 4 | Metals | ______________ _____________ ________________ | |||
| 5 | Thermal and Moisture | ______________ _____________ ________________ | |||
| 6 | Finishes | ______________ _____________ ________________ | |||
| 7 | Plumbing | ______________ _____________ ________________ | |||
| 8 | HVAC | ______________ _____________ ________________ | |||
| 9 | Electrical | ______________ _____________ ________________ | |||
| 10 | Electronic Safety & | ||||
| Security | ______________ _____________ ________________ | ||||
| 11 | Earthwork | ______________ _____________ ________________ | |||
| 12 | Exterior Improvements | ______________ _____________ ________________ | |||
| 13 | 1-Year Service | ||||
| Maintenance | ______________ | _____________ | _______________ | ||
| 14 | Subtotals | ______________ _____________ ________________ |
| 15 | PROJECT SUBTOTAL FOR LABOR AND MATIERALS: | $________________ | ||
| 16 | PROFIT APPLIED TO LINE 15: | ________% $________________ | ||
| 17 | OVERHEAD AND G&A APPLIED TO LINE 15: | ________% $________________ | ||
| 18 | PROJECT GRAND TOTAL (Total of lines 15, 16, 17): | $________________ |
Please indicate Grand Total cost for each asset, including labor and materials, profit, and overhead.
| 19 | ATCT Building | $________________ | |
| 20 | Base Building | $________________ | |
| 21 | PROJECT GRAND TOTAL (Same as line 18) | $________________ |