J-8_Past Performance Questionnaire.pdf

PDF 455 KB Posted

Attached to
SOLICITATION CANCELED: SEA ATCT and S46 TRACON Major Mechanical Upgrades
Solicitation number
697DCK-24-R-00423
Issued by

About this file

This document is a Performance Questionnaire for a federal contract opportunity. The questionnaire is requesting an evaluating organization representative to provide an assessment of a contractor's performance on a previous contract. The key areas of evaluation include quality of products and services, overall performance, technical requirements, schedule, cost control, and customer satisfaction. The contractor name, contract number, contract dates, and total contract value are provided. The evaluating representative is requested to return the completed questionnaire directly to the contracting officer and specialist at the Federal Aviation Administration.

The related federal contract opportunity is for the "SEA ATCT and S46 TRACON Major Mechanical Upgrades" at the Department of Transportation Federal Aviation Administration Southwestern Region. The scope of work includes replacement of chillers, boilers, and cooling towers as detailed in the plans and specifications. This is a solicitation for the required services.

View the file

Other files

File Type Posted
697DCK-24-R-00423_Amendment 04.pdf PDF
J-10c_SEA-ATCT Building Survey Report 3.20.2015 1.pdf PDF
J-3_Specifications_ Seattle ATCT (SEA)_Updated 8.1.2024.pdf PDF
J-10a_SEA TRACON Asbestos Report 2015 1.pdf PDF
J-10d_SEA-ATCT Asbestos OandM Plan 3.20.2015 1.pdf PDF
J-10b_SEA TRACON O-M Plan 2015 1.pdf PDF
J-2_Specifications_ Seattle TRACON (S46)_Updated 8.1.2024.pdf PDF
697DCK-24-R-00423_Amendment 03.pdf PDF
QA_ Major Mechanical Upgrades Seattle Tracon (S46) and Seattle ATCT (SEA).pdf PDF
J-6_Pricing Sheet_ S46 TRACON.docx DOCX document
697DCK-24-R-00423_Amendment 02.pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
697DCK-24-R-00423_Amendment 01.pdf PDF
Sign-in sheet.pdf PDF
J-6_Pricing Sheet_ S46 TRACON.docx DOCX document
J-4_Wage Determination No. WA20240108.pdf PDF
J-7_Pricing Sheet_ SEA ATCT and Base Building.docx DOCX document
J-5_Service Contract Act WD 2015-5535.pdf PDF
J-3_Specifications_ Seattle ATCT (SEA).pdf PDF
J-1_Statement of Work for SEA_S46 and Seattle ATCT - Construction SOW.pdf PDF
J-2_Specifications_ Seattle TRACON (S46).pdf PDF
J-9_BIL Data Report Form.xlsx XLSX spreadsheet
J-3a_SEA_Drawings_Seattle ATCT (SEA).pdf PDF
697DCK-24-R-00423_Final.pdf PDF
J-2a_Drawings_Seattle TRACON (S46).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection

EVALUATING ORGANIZATION REPRESENTATIVE: Please complete this Questionnaire and return via email to

Contracting Officer and Contracting Specialists at: Joni.L.Haynes@faa.gov AND Stevie.CTR.Tabb@faa.gov

TO BE COMPLETED BY OFFEROR

1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:

3. CONTRACT INITIATION DATE:

4. COMPLETION DATE:

5. TOTAL CONTRACT VALUE:

6. TYPE OF CONTRACT: (Fixed

Price, GMP, FPI, etc.)

7. DESCRIPTION OF CONTRACT REQUIREMENTS:

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE AND SENT DIRECTLY TO THE FAA EMAILS ABOVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

EX = Exceptional S = Satisfactory US = Unsatisfactory VG = Very Good MG = Marginal N/O = Not Observed

A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

EX VG S MG US N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

EX VG S MG US N/O

C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

EX VG S MG US N/O

D. Schedule – Assess the timeliness of contractor against the schedule of activities.

EX VG S MG US N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

EX VG S MG US N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”

EX VG S MG US N/O

Joni L Haynes Highlight

Joni L Haynes Highlight

G. Overall Assessment.

EX VG S MG US N/O

Comments: