This document is a pricing sheet for the modernization of the S46 TRACON facility near the Seattle-Tacoma International Airport in Burien, WA. It details the required work items such as general requirements, site conditions, concrete, HVAC, electrical, and other construction-related scope. The pricing sheet provides line items for labor, materials, and total costs for each work element, as well as subtotals and the overall project grand total. Additionally, there are two bid alternates included - one for a CRAC redundant unit and one for a condensor chemical feed system. The related federal contract opportunity is solicitation 697DCK-24-R-00423 issued by the Department of Transportation Federal Aviation Administration Southwestern Region for the SEA ATCT and S46 TRACON Major Mechanical Upgrades project.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SECTION B
SUPPLIES/SERVICES & PRICE/COST
Revised July 25, 2024
The contractor must furnish all materials, labor, supervision, equipment, etc. to modernize the S46 TRACON located near the Seattle–Tacoma International Airport in Burien, WA in strict conformance to the solicitation/contract including the project Specifications and its attached drawings at the following prices:
Item Description $Labor $Materials $Labor & Materials
| 1 | General Requirements | ______________ _____________ ________________ | |||
| 2 | Existing Conditions | ______________ _____________ ________________ | |||
| 3 | Concrete | ______________ _____________ ________________ | |||
| 4 | Metals | ______________ _____________ ________________ | |||
| 5 | Wood and Plastics | ______________ | _____________ | _______________ | |
| 6 | Thermal and Moisture | ______________ _____________ ________________ | |||
| 7 | Openings | ______________ _____________ ________________ | |||
| 8 | Finishes | ______________ _____________ ________________ | |||
| 9 | Plumbing | ______________ _____________ ________________ | |||
| 10 | HVAC | ______________ _____________ ________________ | |||
| 11 | Electrical | ______________ _____________ ________________ | |||
| 12 | Electronic Safety & | ||||
| Security | ______________ _____________ ________________ | ||||
| 13 | Earthwork | ______________ _____________ ________________ | |||
| 14 | 1-Year Service | ||||
| Maintenance | ______________ | _____________ | _______________ | ||
| 14 | Subtotals | ______________ _____________ ________________ |
| 15 | PROJECT SUBTOTAL FOR LABOR AND MATIERALS: | $________________ | ||
| 16 | PROFIT APPLIED TO LINE 15: | ________% $________________ | ||
| 17 | OVERHEAD AND G&A APPLIED TO LINE 15: | ________% $________________ | ||
| 18 | PROJECT GRAND TOTAL (Total of lines 15, 16, 17): | $________________ |
Please indicate Grand Total cost for each asset, including labor and materials, profit, and overhead.
| 19 | TRACON Building | $________________ | ||
| 20 | _____________ | $________________ | ||
| 21 | PROJECT GRAND TOTAL (Same as line 18) | $________________ |
SCHEDULE OF ALTERNATES (Updated on July 25, 2024)
BID ALTERNATE - 1
Provide bid alternate pricing for CRAC Redundant Unit.
Item Division Description $ Labor $ Materials $ Labor & Materials
22 CRAC Redundant Unit _____ ______ _________
| 23 BID ALTERNATE SUBTOTAL FOR LABOR AND MATERIALS: | $ | __________ | |||
| 24 PROFIT APPLIED TO LINE 34: | % | $ | __________ | ||
| 25 OVERHEAD AND G&A APPLIED TO LINE 34: | % | $ | __________ | ||
| 26 PROJECT GRAND TOTAL (Total of lines 23, 24 & 25): | $ | __________ |
BID ALTERNATE - 2
Condensor Chemical Feed System
Item Division Description $ Labor $ Materials $ Labor & Materials
27 Condensor Chemical Feed System _____ ______ _________
| 28 BID ALTERNATE SUBTOTAL FOR LABOR AND MATERIALS: | $ | __________ | |||
| 29 PROFIT APPLIED TO LINE 34: | % | $ | __________ | ||
| 30 OVERHEAD AND G&A APPLIED TO LINE 34: | % | $ | __________ | ||
| 31 PROJECT GRAND TOTAL (Total of lines 28, 29 & 30): | $ | __________ |