This document appears to be a set of drawings related to the major mechanical upgrades for the Seattle TRACON (S46) facility as part of the SEA ATCT and S46 TRACON Major Mechanical Upgrades contract opportunity. The contract is solicited by the Department of Transportation Federal Aviation Administration Southwestern Region. The scope of work includes the replacement of chillers, boilers, and cooling towers as detailed in the plans and specifications. The solicitation number is 697DCK-24-R-00423.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
Department of Transportation Federal Aviation Administration
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:2
A
M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G001
COVER SHEET
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
R. SIMMONS
R. SIMMONS
W. STEVENS
SEATTLE TRACON
SEATAC
WASHINGTON
Seattle Terminal Radar Approach Control Building (S46 TRACON) Major Mechanical Upgrade SeaTac, Washington
Final Submission September 22, 2023
KEY NORTH
ELEVATION
DATUM
SECTION
GRAPHIC SCALE
DETAIL BOUNDARY
BREAK LINES
CENTER LINES
EXTERIOR
ELEVATION
COLUMN LINE GRID
DESIGNATION:
KEYNOTE (NUMBER
DESIGNATION)
A
0'-0"
FLOOR LEVEL
DETAIL NO.
SHEET. ON WHICH
DETAIL IS SHOWN
DEMO WORK WORK
MAGNETIC NORTH
A1
A101
02 4 8134
SCALE: 1/4"=1'-0"
A1
A301
A101
SIM
PLAN NORTH/ PROJECT NORTH
EXISTING WORK
DEMOLISHED WORK
WORK
N
REFERENCE
SITE
SITE
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:2
A
M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G002
INDEX OF DRAWINGS & PROJECT INFORMATION
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
R. SIMMONS
R. SIMMONS
W. STEVENS
SEATTLE TRACON
SEATAC
WASHINGTON
LOCATION PLAN VICINITY PLAN
INDEX OF DRAWINGS GENERAL LEGEND
A. VERIFY FIELD CONDITIONS RELATING TO AND AFFECTING THE EXECUTION OF THE
WORK, AS INDICATED IN THE CONTRACT DOCUMENTS.
B. WORK MUST CONFORM TO APPLICABLE CODES AND ORDINANCES. DISCREPANCIES
BETWEEN CONTRACT DOCUMENTS AND CODES MUST BE BROUGHT TO THE COR'S
ATTENTION BEFORE PROCEEDING.
C. DO NOT SCALE DRAWINGS. DIMENSIONAL DATA MUST BE OBTAINED FROM WRITTEN
INFORMATION ONLY. VERIFY DIMENSIONS BEFORE PROCEEDING. BRING TO THE
ATTENTION OF THE COR ANY DIMENSIONAL DEVIATION FROM THAT SHOWN ON THE
DRAWINGS, WHICH MAY AFFECT INTENT OF DESIGN OR PROPER INCORPORATION OF
ELEMENTS.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL, ELECTRICAL,
FIRE PROTECTION AND OTHER SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA
SHOWN ON ARCHITECTURAL, REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION FOR ITEMS TO BE REMOVED.
E. DIMENSIONS INDICATED IN CONTRACT DOCUMENTS ARE FROM FACE OF EXISTING
STRUCTURE OR FINISH, FACE OF CONCRETE OR BLOCK, OR TO COLUMN LINE, EXCEPT
AS NOTED OTHERWISE. DIMENSIONS OF EXISTING STRUCTURE, ETC. ARE +/- AND MUST
BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. NOTIFY COR OF ANY
DISCREPANCIES.
F. PROVIDE PRESSURE TREATED SOLID BLOCKING REQUIRED TO INSTALL EQUIPMENT,
MILLWORK, ETC.
G. BLOCKING AND MISCELLANEOUS STEEL SHOWN IN DETAILS AND SECTIONS MUST BE
CONTINUOUS UNLESS SPECIFICALLY NOTED OTHERWISE
H. COORDINATE MECHANICAL, ELECTRICAL & STRUCTURAL WORK AND PROVIDE
NECESSARY CONSTRUCTION TO FACILITATE SAID WORK INCLUDING, BUT NOT LIMITED
TO ROUGH OPENINGS, EQUIPMENT SUPPORTS, BACKING AND COORDINATION OF FINISH
WORK.
I. SHOULD A DISCREPANCY IN THE CONTRACT DOCUMENTS OR SPECIFICATIONS OCCUR,
IMMEDIATELY NOTIFY COR FOR RESOLUTION BEFORE PROCEEDING WITH WORK.
J. PROTECT EXISTING BUILDING, SITE ELEMENTS, LANDSCAPING, SIGNS WALKS, CURBS,
ETC. ON PROJECT SITE.
K. THE BUILDING IS OCCUPIED, AND MUST REMAIN OPERATIONAL. COORDINATE
CONSTRUCTION ACTIVITIES THAT MAY IMPEDE OPERATIONS, INCLUDING ACTIVITIES
WHICH CREATES EXCESSIVE NOISE, AIRBORNE DUST, DIRT, OR THAT DISRUPTS THE
FUNCTIONALITY OF THE SPACE. PROTECT ANY ADJACENT SPACE WITH DUST
PARTITIONS OR CURTAINS FROM ACTIVITIES WHICH WILL CREATE DUST. NOTIFY COR OF
CONSTRUCTION ACTIVITIES WHICH MAY DISRUPT BUILDING OPERATIONS.
L. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/ UTILITIES OR OPERATIONS IS
NOT ALLOWED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES
MUST BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS
PRIOR TO THE PERFORMANCE OF THE WORK.
M. IT IS PRESUMED THAT THE BUILDING DOES NOT CONTAIN ASBESTOS CONTAINING
MATERIALS. IF HAZMAT IS ENCOUNTERED DURING THE WORK, CEASE WORK IN THAT
AREA AND NOTIFY COR TO DEVELOP PLAN ON HOW TO PROCEED WITH THE WORK.
N. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS,
ROOFS OR SMOKE BARRIERS PENETRATED AS A RESULT OF THE WORK WITH AN
APPROVED UL FIRE AND SMOKE STOP ASSEMBLIES. SUBMIT TO COR FOR APPROVAL
FIRE AND SMOKE STOP PENETRATION DETAILS.
O. RESTORE EXPOSED WALL, FLOOR, CEILING, SLAB AND ROOF FINISHES OF PATCHED
AREAS AND EXTEND FINISH RESTORATION INTO RETAINED ADJOINING CONSTRUCTION
TO NEAREST INTERSECTION OR NATURAL BREAK.
MAGNETIC
NORTH
NPROJECT
NORTH
MAGNETIC
NORTH
NPROJECT
NORTH
GENERAL NOTES
DRAWING
NUMBER
DRAWING TITLE
GENERAL
G001 COVER SHEET
G002 INDEX OF DRAWINGS & PROJECT INFORMATION
G003 ABBREVIATIONS
G004 CONSTRUCTION STAGING PLAN
G005 CONSTRUCTION STAGING PLAN
G006 OVERALL FIRST FLOOR PLAN
G007 OVERALL SECOND FLOOR PLAN
G101 FIRST FLOOR LIFE SAFETY PLAN
G102 SECOND FLOOR LIFE SAFETY PLAN
CIVIL
CD100 DEMOLITION PLAN
C110 SITE PLAN
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S002 STRUCTURAL ABBREVIATIONS, SYMBOLS & LEGEND
S003 LOAD PLANS
SD101 STRUCTURAL FIRST FLOOR DEMOLITION PLAN
SD102 STRUCTURAL COOLING TOWER DEMOLITION PLAN
S010 STRUCTURAL FIRST FLOOR TEMPORARY PLAN
S101 STRUCTURAL FIRST FLOOR PLAN
S102 STRUCTURAL SUPPORT FRAMING PLAN
S301 BUILDING SECTIONS
S501 DETAILS
ARCHITECTURE
A201 FIRST FLOOR WORK PLAN, ELEVATION
A202 LOW ROOF PLAN- WORK, DETAIL
FIRE PROTECTION
F001 FIRE ALARM GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
F216 FIRST FLOOR FIRE ALARM PLAN PART 1
F217 FIRST FLOOR FIRE ALARM PLAN PART 2
F301 FIRE ALARM MATRIX AND RISER DIAGRAM
MECHANICAL
M001 HVAC ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES
M002 HVAC CONTROLS SYMBOLS, ABBREVIATIONS AND
CONSTRUCTION SEQUENCE
MD101 HVAC DEMOLITION - FIRST FLOOR
MD102 HVAC DEMOLITION - SECOND FLOOR
MD103 HVAC DEMOLITION - MECHANICAL ROOM
MD104 HVAC DEMOLITION - EXTERIOR
MT101 HVAC TEMPORARY WORK - FIRST FLOOR
MT102 HVAC TEMPORARY WORK - MECHANICAL ROOM
MT103 HVAC TEMPORARY WORK - EXTERIOR
M101 HVAC NEW WORK - FIRST FLOOR
M102 HVAC NEW WORK - SECOND FLOOR
DRAWING
NUMBER
DRAWING TITLE
M103 HVAC NEW WORK - MECHANICAL ROOM
M104 HVAC NEW WORK - EXTERIOR
M401 HVAC NEW WORK ISOMETRIC
M402 HVAC NEW WORK ISOMETRIC
M500 HVAC SCHEDULES
M501 HVAC SCHEDULES
M600 HVAC SEISMIC DETAILS
M601 HVAC SEISMIC DETAILS
M602 HVAC TYPICAL DETAILS
M701 HVAC CHILLED WATER PIPING FLOW DIAGRAM -
DEMOLITION AND TEMPORARY
M702 HVAC CHILLED WATER PIPING FLOW DIAGRAM - NEW
M703 HVAC HOT WATER PIPING FLOW DIAGRAM - DEMOLITION
AND TEMPORARY
M704 HVAC HOT WATER PIPING FLOW DIAGRAM - NEW
M705 HVAC CONDENSER WATER PIPING FLOW DIAGRAM -
DEMOLITION
M706 HVAC CONDENSER WATER PIPING FLOW DIAGRAM - NEW
M801 HVAC CONTROL DIAGRAMS
M802 HVAC CONTROL DIAGRAMS
M803 HVAC CONTROL DIAGRAMS
M804 HVAC CONTROL DIAGRAMS
M805 CHILLED WATER FLOW CONTROL DIAGRAM - DEMOLITION
M806 CHILLED WATER FLOW CONTROL DIAGRAM - NEW WORK
M807 HEATING HOT WATER FLOW CONTROL DIAGRAM -
DEMOLITION
M808 HEATING HOT WATER FLOW CONTROL DIAGRAM - NEW
WORK
M809 DDCS POINT FUNCTION SCHEDULE
M810 DDCS POINT FUNCTION SCHEDULE
M811 DDCS POINT FUNCTION SCHEDULE
M812 DDCS POINT FUNCTION SCHEDULE
M813 DDCS POINT FUNCTION SCHEDULE
M814 SEQUENCE OF OPERATION
M815 SEQUENCE OF OPERATION
M816 SEQUENCE OF OPERATION
M817 SEQUENCE OF OPERATION
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E002 ELECTRICAL SYMBOLS
ED101 FIRST FLOOR DEMOLITION POWER PLAN
ET100 PARTIAL SITE PLAN - TEMPORARY POWER CONDUIT PATH
ET101 PARTIAL SITE PLAN - TEMPORARY POWER
E101 FIRST FLOOR POWER PLAN WORK AREA
E501 PANELBOARD SCHEDULES
E502 PANELBOARD SCHEDULES
E503 PANELBOARD SCHEDULES
E550 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
E600 ELECTRICAL DETAILS
E601 ELECTRICAL DETAILS
E801 ELECTRICAL CONSTRUCTION SEQUENCING PLAN
E802 POWER ONE-LINE DIAGRAM
E803 POWER ONE-LINE DIAGRAM
E804 POWER ONE-LINE DIAGRAM - ESSENTIAL MCC DEMOLITION
E805 POWER ONE-LINE DIAGRAM - ESSENTIAL MCC NEW WORK
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:2
A
M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G003
ABBREVIATIONS
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
R. SIMMONS
R. SIMMONS
W. STEVENS
SEATTLE TRACON
SEATAC
WASHINGTON
A A AMPERE, AIR, COMPRESSED AIR LINE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT, BOTT BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER, CONDENSATE
DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL
INPUT
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE
SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT, ENTR ENTRANCE
EP EXHAUST PIPE
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
K KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L LAN LOCAL AREA NETWORK
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
M M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFD OVERFLOW ROOF DRAIN
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH, SCHED SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE
INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND OPERATIONS
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
W W WATT
W/ WITH
WD WOOD
WG WATER GAGE
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
X XFER, XFR TRANSFER
XFMR TRANSFORMER
Y Y WYE CONNECTION
YD YARD
SEA - D - TRACO - G004
CONSTRUCTION STAGING PLAN
CONSTRUCTION SEQUENCE
DEVELOP RISK MITIGATION PLAN TO ACCOMMODATE REMOVING AND PROVIDING EQUIPMENT AS PART OF THE WORK. COORDINATE FINAL PLAN REQUIREMENTS WITH COR. RISK MITIGATION PLAN MUST AT A MINIMUM
ADDRESS PROTECTION OF BUILDING, OCCUPANTS, AND BUILDING SECURITY.
DEVELOP RISK MITIGATION PLAN TO ACCOMMODATE REMOVAL OF EXISTING EXITS FROM BUILDING TO ALLOW FOR THE WORK AND TO MAINTAIN REQUIRED EGRESS FROM AREAS IMPACTED BY CONSTRUCTION.
RISK MITIGATION PLAN MUST IDENTIFY AND DOCUMENT RISKS/HAZARDS POSED BY THE WORK AND IDENTIFY ACTION REQUIRED TO REDUCE THE RISK. THE PLAN MUST INCLUDE DAILY CONSTRUCTION BRIEFINGS WITH THE COR AND REGULAR INSPECTIONS. RISK MITIGATION PLANS MUST ADDRESS, BUT IS NOT LIMITED TO INFORMING OCCUPANTS AND VISITORS OF ANY CONSTRUCTION ACTIVITY THAT AFFECT FIRE PROTECTION AND LIFE SAFETY WITHIN THE FACILITY. RISK MITIGATION MUST ADDRESS ALTERNATE MEANS OF EGRESS FOR BUILDING OCCUPANTS, SIGNAGE, AND IF REQUIRED BY COR, TRAINING WHEN EGRESS ROUTES ARE REVISED AS A RESULT
OF THE WORK.
GENERAL
1. THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS. DIVISION 01 SPECIFICATIONS HAVE
PRECEDENCE OVER THESE NOTES.
2. CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA IF REQUIRED MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH
ONGOING PROJECTS. LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT
PRECONSTRUCTION CONFERENCE.
3. TRACON IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY AND IT IS REQUIRED TO COORDINATE CONSTRUCTION ACTIVITY WITH COR SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE TRACON.
4. EXISTING CONDITIONS ARE REFERENCED FROM FAA SUPPLIED DRAWINGS AND SHOULD ONLY BE USED AS A
REFERENCE AS THEY MAY DIFFER FROM ACTUAL FIELD CONDITIONS.
5. MAINTAIN 3'-0" CLEARANCE AROUND FIRE HYDRANTS AND PROTECT ACCESS FOR THE FIRE DEPARTMENT.
6. MAINTAIN EMERGENCY VEHICLE ROUTE AND USAGE OF EXISTING TRAVELWAYS ADJACENT TO THE PROJECT.
7. UPON COMPLETION OF CONSTRUCTION OF THE PROJECT, THE PROJECT AREA MUST BE FREE OF DEBRIS AND UNUSED MATERIAL. DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES MUST BE RESTORED TO MEET OR EXCEED THE ORIGINAL EXISTING CONDITIONS TO THE SATISFACTION OF THE COR, TO INCLUDE PAVEMENT MARKINGS IN THE VICINITY OF CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. DAMAGE TO EXISTING ENTRANCES, PAVEMENT OR OTHER STRUCTURES NOT PROPOSED TO BE DEMOLISHED WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR. THIS INCLUDES AREA OF CONSTRUCTION
STORAGE AND CONSTRUCTION TRAILER AREAS.
A. CONSTRUCTION ACCESS
A.1. CONTRACTOR'S VISITORS AND DELIVERIES TO SITE MUST BE THROUGH THE MAIN ENTRANCE
SECURITY GATE IDENTIFIED THROUGH COR.
A.2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN
AND DIRECT PERSONS NEAR CONSTRUCTION AREAS.
A.3. ACCESS TO BUILDING MUST BE LIMITED. CORDINATE WITH COR.
A.4. KEEP LOADING DOCK ACCESSIBLE FOR FAA DELIVERIES.
A.5. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT: 5:30
- 6:45 AM, 12:30 PM - 2:30 PM AND 10:15 PM, VERIFY TIME WITH COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLE MUST
NOT BE ALLOWED ON SITE.
A.6. DO NOT BLOCK ACCESS OR EGRESS FROM BUILDING EXITS. COORDINATE WITH COR RISK MITIGATION PLAN IF THE FOLLOWING EXITS WILL BE TEMPORARILY BLOCKED: EMPLOYEE ENTRANCE/EXIT OR
AREAWAY.
B. CONTRACTOR PARKING
B.1. ON-SITE PARKING MUST BE COORDINATED WITH COR PRIOR TO ANY CONSTRUCTION.
C. FAA SECURITY REQUIREMENTS
C.1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR.
TEMPORARY SECURITY BADGES WILL BE ISSUED TO QUALIFIED CONSTRUCTION PERSONNEL.
CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR
PERSONNEL WHILE IN THE BUILDING. CONTRACTOR'S VEHICLES MUST BE MARKED. REFER TO
DIVISION 1 FOR MORE DETAILED REQUIREMENTS.
C.2. SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS
AND COMPLY WITH FAA'S SECURITY REQUIREMENTS.
C.3. FAA VISITORS BADGES ARE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE
BUILDING. OBTAIN FAA SECURITY BADGES FOR PROJECT SUPERINTENDENT AND ONE
REPRESENTATIVE FOR EACH SUB CONTRACTOR ON SITE FOR MORE THAN 60 DAYS. THE BADGED
CONTRACTOR MUST ESCORT SUB CONTRACTORS AND OTHER WORKERS ON THE SITE. TEMPORARY
BADGES ARE REQUIRED FOR CONTRACTORS AND OTHER WORKERS FOR DURATION LESS THAN 60
DAYS.
C.4. USE GREAT CARE AND CAUTION WHILE WORKING ON THIS FACILITY. WORK MUST BE COORDINATED
WITH COR. DISRUPTION OF THIS FACILITY IS NOT PERMITTED.
C.5. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF
THIS CONTRACT. ENSURE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR
ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. NOTIFY COR IMMEDIATELY OF DAMAGE OR DISRUPTION
OF ELECTRICAL SERVICES. REPAIRS AND RESTORATIONS ARE AT NO COST TO THE FAA.
C.6. A MINIMUM OF THREE (3) CONTRACTORS MUST MEET THE REQUIREMENTS AND SECURE FAA BADGES
FOR THE DURATION OF CONSTRUCTIONS. ALL OTHER CONTRACTORS MUST BE ESCORTED BY FAA
BADGED CONTRACTORS.
D. CONSTRUCTION MATERIAL STORAGE
D.1. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE IS LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED AT THE DISCRETION OF
COR. DO NOT DIG WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND
UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. INSTALL A PADLOCK ON GATE FOR
CONSTRUCTION STAGING AREA. PROVIDE KEY TO COR.
D.2. COORDINATE DELIVERY OF MATERIALS THROUGH THE COR. HAVE PERSONNEL ON SITE TO RECEIVE
DELIVERIES.
D.3. ANY FLUID SPILLS MUST BE IMMEDIATELY CONTAINED AND PROPERLY CLEANED UP AND DISPOSED OF. AT PROJECT COMPLETION, ANY SPILLS, OR OTHER DEBRIS MUST BE PROPERLY REMOVED AND
DISPOSED OF AND AREA RETURNED TO PRE-CONSTRUCTION CONDITIONS.
E. CONSTRUCTION DEBRIS
E.1. ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY
CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE
KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY. PROVIDE SEPARATE DUMPSTER, IF REQUIRED, FOR ABATEMENT MATERIAL. QUANTITY AND POSITION OF DUMPSTERS MUST BE COORDINATED WITH THE COR PRIOR
TO THEIR DELIVERY AND PLACEMENT.
F. CONSTRUCTION OFFICE
F.1. LOCATE CONTRACTOR'S TRAILERS FOR OFFICE IN CONSTRUCTION STAGING AREA. LOCATE MATERIALS AND EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREA. COORDINATE TELEPHONE
SERVICES WITH COR.
F.2. POWER IS AVAILABLE AT TRACON, IF REQUIRED FOR CONSTRUCTION PURPOSES. REFER TO ELECTRICAL DRAWINGS FOR CONNECTION. HOOK-UPS ARE THE RESPONSIBILITY OF CONTRACTOR.
F.3. COORDINATE WITH COR USE OF MOBILE CELL PHONE USE INSIDE AND OUTSIDE BUILDING. CERTAIN
AREAS OF THE FACILITY ARE SENSITIVE TO CELL PHONE USAGE.
F.4. ALL COSTS ASSOCIATED WITH TEMP POWER AND WATER TRANSMISSION BY CONTRACTOR.
G. CONSTRUCTION TOILET FACILITIES
G.1. PROVIDE PORTABLE CHEMICAL TOILETS, PAID FOR AND MAINTAINED BY THE CONTRACTOR AS
REQUIRED AT THE TEMPORARY CONSTRUCTION STAGING AREA. COORDINATE WITH THE COR FOR
SCHEDULING OF SERVICE.
G.2. PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS TO CONSTRUCTION STAGING AREA.
G.3. LOCATE PORTABLE TOILETS A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER
FEATURE (INLET, SWALE, DITCH, POND, ETC.).
H. DEMOLITION AND CONSTRUCTION HOURS
H.1. ACTIVITIES MUST NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY.
DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 5:00 AM TO 12:00 AM. WORK
DETERMINED BY THE COR TO BE DISRUPTIVE TO THE OPERATIONS WILL BE STOPPED AND
RESCHEDULED TO BE PERFORMED DURING OFF-HOURS.
H.2. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY. COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/ GOVERNMENT EQUIPMENT. WORK IN AREAS WITH CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OR AS APPROVED
BY COR.
H.3. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 WORKING
DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK.
J. EQUIPMENT PROTECTION
J.1 PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE
DRILLING.
J.2 SHUTDOWNS AND SWITCH OVERS OF PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE H.1 THIS SHEET UNDER DEMOLITION AND
CONSTRUCTION HOURS. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND
SWITCH OVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT
BREAKER AT ANY TIME.
J.3 NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. REVIEW WITH
COR TYPE OF WELDING CUTTING TO BE PERFORMED AT FACILITY 10 DAYS PRIOR TO USE.
GENERAL CONSTRUCTION STAGING NOTES
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
09/22/2023
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE TRACON
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEATTLE (S46) TRACON WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001809
09 22 2023
TRACON BUILDING COOLING TOWERS
DUMPSTER
PERIMETER
SECURITY FENCE
STORMWATER
DETENTION
FACILITY
ENGINE
GENERATOR
BUILDING
ABOVE GROUND
FUEL TANK
LOADING DOCK
VEHICLE GATE
WORKSHOP
BUILDING
PROTECT
FIRE HYDRANTS
PROTECT TREES
TEMPORARY CHILLERS
TEMPORARY BOILERS
TEMPORARY ELECTRICAL
EQUIPMENT
CONTRACTOR
TRAILER
APPROXIMATE TEMPORARY
ELECTRIC AND TELEPHONE
LOCATION
ENTRANCE TO CONSTRUCTION
STAGING AREA
PROTECT TREE
APPROXIMATE TEMPORARY
ELECTRIC AND TELEPHONE
LOCATION
RESIDENT ENGINEER
TRAILER
PROTECT TREE
LEGEND
SEA - D - TRACO - G005
CONSTRUCTION STAGING AREA
TEMPORARY CHILLER YARD (SEE MECHANICAL AND
ELECTRICAL DRAWINGS)
CONSTRUCTION STAGING PLAN
G005
A8 CONSTRUCTION STAGING PLAN
1" = 30'
FEET
Scale: 1 INCH = 30 FEET
60300 15
GENERAL SHEET NOTES
A. TRAILER LOCATION SHOWN IS APPROXIMATE, FINAL LOCATION MUST BE
APPROVED BY COR.
B. TEMPORARY UTILITY CONNECTIONS MUST BE COORDINATED WITH TRAILER
UTILITY CONNECTION POINTS.
C. TEMPORARY UTILITIES MUST BE REMOVED AFTER CONSTRUCTION.
D. ASPHALT AND CONCRETE PAVEMENT MUST NOT BE REMOVED DURING
INSTALLATION OF TEMPORARY UTILITIES.
E. TEMPORARY TRAILERS MUST MAINTAIN POSITIVE DRAINAGE TO NEAREST
DRAINAGE STRUCTURE OR FACILITY.
F. REFER TO ELECTRICAL DRAWINGS FOR TEMPORARY UTILITY CONNECTIONS.
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
09/22/2023
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE TRACON
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEATTLE (S46) TRACON WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001809N
T150
T112
T150T150T150T150
VFDVFD
JBJBJB
DN
UP
UP
AA
2 3 4 5 6 7 8 9 10 11
B B
C C
D
E
F
G
H
J J
K K
L L
ENGINE
GENERATOR
100100
UPS
EQUIPMENT
BATTERY
149149
ELECTRICAL
148148
AT/AF
ELECTRONIC
EQUIPMENT
143143
CORRIDOR
112112
CHILLER
134134
BOILER
AHU
133133
TELCO
132132
AT ETG
LAB
153153
STUDENT
AREA
154154
AT/ AF
OPERATIONS
150150
RADAR
SSC STAFF
146146
RADAR
SSC
STORAGE
145145
RADAR
SSC
MAINTENANCE/
CONTROL
ROOM
141141
RADAR
SSC
BREAKROOM
142142
RADAR
SSC STAFF
140140
CORRIDOR
110110
AT/ AF
LOCKERS
181181
VEST
161161
STAIR
162162
CORRIDOR
160160
CORRIDOR
105105
AT OPS
MANAGER
106106
AT
OPERATIONS
SUPERVISOR
OFFICE
104104
AT TMU
OFFICE
107107
AT/ AF
EXERCISE
170170
JAN/ HSKG
172172
WOMEN
173173
MEN
174174
AT/ AF
KITCHEN
180180
AT/ AF
BREAKROOM
178178
AT/ AF
QUIET
ROOM
179179
AT
CONTROLLER
175175
ATRIUM/
STAIR
101101
VEST
100100
AT/ AF
CONFERENCE
TRAINING
102102
ELEVATOR
EQUIPMENT
111111
CONF
STOR
103103
WW SSC
TEST EQPT
STORAGE
131131
WW SSC
STORAGE
130130
ENV SSC
TEST EQPT
STORAGE
128128
TOILET
129129
TOILET
125125
WAREHOUSE
SHIPPING
127127
ENV SSC
BREAKROOM
126126
HAZMAT
STORAGE
135135
AF OFFICE
147147
ENV SSC
STAFF
120120
ENV SSC
STAFF
121121
ENV SSC
LIBRARY
122122
ENV SSC
COORDINATOR
123123
ENV SSC
SPECIALIST
124124
AT
DEBRIEF
155155
AT
DEBRIEF
156156
MM
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
16 0
Scale: 1/16 INCH = 1 FOOT
16 32
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:3
A
M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G006
OVERALL FIRST FLOOR PLAN
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
R. SIMMONS
H. LEE
W. STEVENS
SEATTLE TRACON
SEATAC
WASHINGTON
1/16" = 1'-0"G006
A8 OVERALL FIRST FLOOR PLAN
GENERAL SHEET NOTES
KEY PLAN
A. REFER TO MECHANICAL, ELECTRICAL, STRUCTURAL, FIRE ALARM, AND CIVIL
FOR ADDITIONAL WORK SCOPE.
B. REFER TO LIFE SAFETY PLANS FOR FIRE RATINGS' INFORMATION.
DN
DN
AA
2 3 4 5 6 7 8 9 10 11
B B
C C
D
E
F
G
H
J J
K K
L L
T/O WW
SSC
222222
NATCA
223223
STORAGE
ROOM
224224
NATCA
225225
CORRIDOR
201201
CORRIDOR
202202
AT/AF EMP.
OFFICE
203203
TOILET
204204
AT TAPE
205205
MEN
206206
JAN
207207
WOMEN
208208
STAIR
209209
T/O MPA
210210
T/O DFM
211211NAVCOM
SSCM
212212
RADAR
SSCM
213213
T/O STOR
214214
T/O MGR
CONFERENCE
215215
ENV SSC
MPA
216216
WW SSC
MPA
217217
WW SSC
CONFERENCE
218218
WW SSC
STORAGE
219219
WAN/LAN
221221
AT ADMIN.
230230
AT MGR
231231
AT CONF
232232
AT
TRAINING
234234
AT QC
235235
AT SUPT.
MGR
236236
AT
SUPPORT
STAFF/
WORKROOM
237237
ELEC
238238
AT SUPPLY
239239
AT ADMIN.
SUPPORT
240240
CORRIDOR
241241
ATRIUM/
STAIR
200200
MM
LOW ROOF
ENV SSC
MGR
217A217A
WW SSC
MGR
217B217B
WW COORD
SOUTH
222A222A
WW COORD
NORTH
222B222B
GENERATOR
BUILDING
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
16 0
Scale: 1/16 INCH = 1 FOOT
16 32
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:3
A
M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G007
OVERALL SECOND FLOOR PLAN
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
R. SIMMONS
H. LEE
W. STEVENS
SEATTLE TRACON
SEATAC
WASHINGTON
1/16" = 1'-0"G007
A8 OVERALL SECOND FLOOR PLAN
GENERAL SHEET NOTES
A. REFER TO MECHANICAL, ELECTRICAL, STRUCTURAL, FIRE ALARM, AND CIVIL
FOR ADDITIONAL WORK SCOPE.
B. REFER TO LIFE SAFETY PLANS FOR FIRE RATINGS' INFORMATION.
KEY PLAN
132 TELCO 406 STORAGE 300 2
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
133 BOILER AHU STORAGE 300 82180
134 CHILLER STORAGE 300 3715
131 ELEC. WORKSHOP BUSINESS 50 6282
130 AF ENVIRONMENT WORKSHOP BUSINESS 50 11525
128 RECYCLE STORAGE STORAGE 300 1199
127 AF WAREHOUSE SHIPPING STORAGE 300 3663
126 AF ENVIRONMENT STORAGE STORAGE 300 2513
135 MATERIAL STORAGE STORAGE 300 1220
120 NAV/COM 730 BUSINESS 150 5
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
149 UPS EQUIPMENT BATTERY STORAGE 300 3735
148 ELECTRICAL STORAGE 300 41118
143 AT/AF ELECTRONIC EQUIPMENT STORAGE 300 133893
146 AF WORKSHOP RADAR BUSINESS 50 18862
145 AF RADAR STORAGE STORAGE 300 2385
141 AF OPS MAINT. / CONTROL RM BUSINESS 150 5685
103 CONF STOR STORAGE 300 189
111 ELEVATOR EQUIPMENT STORAGE 300 133893
102 AT/AF CONFERENCE TRAINING 917 ASSEMBLY 15 62
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
170 AT/AF EXERCISE BUSINESS 50 7309
181 AT/AF LOCKERS BUSINESS 50 15708
180 AT/AF KITCHEN BUSINESS 100 111063
178 AT/AF BREAKROOM BUSINESS 15 25367
179 AT/AF QUIET ROOM BUSINESS 15 15213
153 AT ETG LAB BUSINESS 50 15731
154 STUDENT AREA BUSINESS 15 51753
150 AT/ AF OPERATIONS BUSINESS 150 355140
TOTAL 425
REM. GROSS BUSINESS 150 8312348172 JAN/ HSKG STORAGE 300 149100 ENGINE GENERATOR STORAGE 300 41034
CORRIDOR
AF OFFICE
ENV SSC
BREAKROOM
HAZMAT STORAGE
135 ENV SSC SPECIALIST
ENV SSC
COORDINATOR
ENV SSC STAFF
ENV SSC STAFF
ENV SSC LIBRARY
WAREHOUSE
SHIPPING
ENV SSC TEST EQPT
STORAGE
TOILET
TOILET
WW SSC TEST EQPT
STORAGE
WW SSC STORAGE
CHILLER
BOILER AHU
TELCO
ENGINE GENERATOR
ELECTRICAL
UPS EQUIPMENT
BATTERY
AT/AF ELECTRONIC
EQUIPMENT
RADAR SSC STAFF
RADAR SSC
STORAGE
RADAR SSC
MAINTENANCE/
CONTROL ROOM
RADAR SSC
BREAKROOM
RADAR SSC STAFF
140 CORRIDOR
CONF STOR
ELEVATOR
EQUIPMENT
AT/ AF CONFERENCE
TRAINING
ATRIUM/ STAIR
VEST
AT/ AF OPERATIONS
CORRIDOR
AT TMU OFFICE
AT OPERATIONS
SUPERVISOR OFFICE
AT OPS MANAGER
CORRIDOR
AT/ AF EXERCISE
JAN/ HSKG
172WOMEN
MEN
AT CONTROLLER
AT/ AF BREAKROOM
178 AT/ AF QUIET ROOM
AT/ AF KITCHEN
STAIR
AT/ AF LOCKERS
VEST
AT DEBRIEF
AT DEBRIEF
AT ETG LAB
STUDENT AREA
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
TD = 117'
TD = 187'
TD = 147'
CP = 74'
CP = 115'
EGRESS PATH FROM
SECOND FLOOR
CP = 57'
EGRESS PATH FROM
SECOND FLOOR
LIFE SAFETY SYMBOLS:
TD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE (MAX: 300 FT)
COMMON PATH OF TRAVEL (MAX: 100 FT)
1 HOUR FIRE RATED ASSEMBLY
2 HOUR FIRE RATED ASSEMBLY
X Y
W
Z
CP = #FT
OCCUPANT LOAD TABLE
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
PARTS PLAN
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
16 0
Scale: 1/16 INCH = 1 FOOT
16 32
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
9/
/2
:0
3:
P M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G101
FIRST FLOOR LIFE SAFETY PLAN
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
C.LEE
C. LEE
J. WATKINS
SEATTLE TRACON
SEATAC
WASHINGTON
1 THE COMMON PATH OF TRAVEL DISTANCE MEASUREMENT EXCEEDS THE MAXIMUM
ALLOWABLE COMMON PATH OF TRAVEL DISTANCE (100 FT.) FOR A BUSINESS OCCUPANCY PER
IBC. THIS IS AN EXISTING LIFE SAFETY DEFICIENCY THAT IS SHOWN FOR INFORMATIONAL
PURPOSES. THE PROJECT SOW DOES NOT INCLUDE CORRECTION OF EXISTING LIFE SAFETY
DEFICIENCIES.
- 1/16" = 1'-0"
B8 FIRST FLOOR - LIFE SAFETY FLOOR PLAN
A. THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE-RATED
PARTITIONS AS INDICATED ON THE PROVIDED AS-BUILTS. ANY NEW
OPENINGS OR PENETRATIONS THROUGH EXISTING FIRE-RATED
PARTITIONS SHALL BE PROTECTED TO MAINTAIN THE FIRE
RESISTANCE RATING OF THE WALL ASSEMBLY AS REQUIRED BY IBC.
THE CONTRACTOR SHALL VERIFY AND CONFIRM EXISTING WALL
RATINGS PRIOR TO CONSTRUCTION AS PART OF PROJECT SCOPE.
B. UNLESS SPECIFICALLY INDICATED IN THIS DRAWING PACKAGE, THIS
PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING ANY
OF THESE EXISTING PARTITIONS THAT DO NOT CURRENTLY PROVIDE
THE REQUIRED FIRE RATING. THIS PROJECT SCOPE INCLUDES:
a. FIRE AND SMOKE- STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW PENETRATIONS IN THESE PARTITIONS MADE BY
THE WORK OF THIS PROJECT.
b. FIRE AND SMOKE-STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW OPENINGS/ HOLES MADE BY THE WORK OF THIS
PROJECT (REMOVALS OF EXISTING ITEMS LEAVING OPENINGS/
HOLES).
GENERAL SHEET NOTES
SHEET NOTES
EGRESS REQUIREMENTS
CODES AND STANDARDS
LIFE SAFETY MEANS OF EGRESS REQUIREMENTS MUST BE IN
ACCORDANCE WITH NFPA 101, 2021 EDITION, AND AS INDICATED
ON LIFE SAFETY PLANS.
A. ASSEMBLY OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 250 FEET
b. MAX COMMON PATH OF TRAVEL 20 FEET
c. MAX DEAD END 20 FEET
B. BUSINESS OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 300 FEET
b. MAX COMMON PATH OF TRAVEL 100 FEET
c. MAX DEAD END 50 FEET
G101
LIFE SAFETY SYMBOLS:
TD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE (MAX: 300 FT)
COMMON PATH OF TRAVEL (MAX: 100 FT)
1 HOUR FIRE RATED ASSEMBLY
X Y
W
Z
CP = #FT
OCCUPANT LOAD TABLE
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
225/226 AT CBI TRAINING/ AT TECH LIBRARY 638 BUSINESS 20 32
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
207 JAN STORAGE 300 158
TOTAL 192
239 AT SUPPLY 329 STORAGE 300 2
238 ELEC STORAGE 300 1135
221 AT/ AF WAN/ LAN 345 STORAGE 300 2
219 AT/ AF OPS STORAGE STORAGE 300 2322
217 AT SYSTEMS ADMIN COMPUTER 736 BUSINESS 20 37
216/215 AF TECH. LIBRARY/ AF CBI/ TRAINING BUSINESS 20 26517
214 AF STOR 67 STORAGE 300 1
232 AT CONF BUSINESS 30 8185
REM. GROSS BUSINESS 150 8011935
STAIR
NATCA
NATCA
STORAGE ROOM
T/O WW SSC
WW SSC
CONFERENCE
WW SSC STORAGE
WAN/LAN
JAN
CORRIDOR
CORRIDOR
WOMEN
MEN
AT SUPPLY
AT ADMIN. SUPPORT
CORRIDOR
241 AT TAPE
ELEC
AT/AF EMP. OFFICE
TOILET
AT SUPPORT STAFF/
WORKROOM
AT TRAINING
AT SUPT. MGR
AT QC
AT ADMIN.
ATRIUM/ STAIR
ENV SSC MPA
T/O MGR
CONFERENCE
T/O STOR
214 RADAR SSCM
NAVCOM SSCM
T/O MPA
T/O DFM
AT MGR
AT CONF
CP = 66'
TD = 152'
TD= 222'
CP = 21'
TD = 138'
WW SSC MPA
ENV SSC MGR
217A
WW SSC MGR
217B
WW COORD SOUTH
222A
WW COORD NORTH
222B
EGRESS PATH TO FIRST FLOOR
CP = 58'
EGRESS PATH
TO FIRST FLOOR
0.3
0.3
PARTS PLAN
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
8 0 8
Scale: 1/8 INCH = 1 FOOT
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
9/
/2
:4
5:
A M
SEATAC WASEATTLE (S46) TRACON
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
09/22/2023 19001809
SEA - D - TRACO - G102
SECOND FLOOR LIFE SAFETY PLAN
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
C.LEE
C. LEE
J. WATKINS
SEATTLE TRACON
SEATAC
WASHINGTON
- 1/8" = 1'-0"
C8 SECOND FLOOR - LIFE SAFETY FLOOR PLAN
GENERAL SHEET NOTES
SHEET NOTES
EGRESS REQUIREMENTS
G102
A. THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE-RATED
PARTITIONS AS INDICATED ON THE PROVIDED AS-BUILTS. ANY NEW
OPENINGS OR PENETRATIONS THROUGH EXISTING FIRE-RATED
PARTITIONS SHALL BE PROTECTED TO MAINTAIN THE FIRE
RESISTANCE RATING OF THE WALL ASSEMBLY AS REQUIRED BY IBC.
THE CONTRACTOR SHALL VERIFY AND CONFIRM EXISTING WALL
RATINGS PRIOR TO CONSTRUCTION AS PART OF PROJECT SCOPE.
B. UNLESS SPECIFICALLY INDICATED IN THIS DRAWING PACKAGE, THIS
PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING ANY
OF THESE EXISTING PARTITIONS THAT DO NOT CURRENTLY PROVIDE
THE REQUIRED FIRE RATING. THIS PROJECT SCOPE INCLUDES:
a. FIRE AND SMOKE- STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW PENETRATIONS IN THESE PARTITIONS MADE BY
THE WORK OF THIS PROJECT.
b. FIRE AND SMOKE-STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW OPENINGS/ HOLES MADE BY THE WORK OF THIS
PROJECT (REMOVALS OF EXISTING ITEMS LEAVING OPENINGS/
HOLES).
CODES AND STANDARDS
LIFE SAFETY MEANS OF EGRESS REQUIREMENTS MUST BE IN
ACCORDANCE WITH NFPA 101, 2021 EDITION, AND AS INDICATED
ON LIFE SAFETY PLANS.
A. ASSEMBLY OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 250 FEET
b. MAX COMMON PATH OF TRAVEL 20 FEET
c. MAX DEAD END 20 FEET
B. BUSINESS OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 300 FEET
b. MAX COMMON PATH OF TRAVEL 100 FEET
c. MAX DEAD END 50 FEET
TRACON BUILDING
WORKSHOP
BUILDING
COOLING TOWERS
DUMPSTER
PERIMETER
SECURITY FENCE
STORMWATER
DETENTION
FACILITY
ENGINE GENERATOR
BUILDING
ABOVE GROUND
FUEL TANK
LOADING DOCK
VEHICLE GATE
SEA - D - TRACO - CD100
DEMOLITION PLAN
FEET
Scale: 1 INCH = 30 FEET
60300 15
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
09/22/2023
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE TRACON
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEATTLE (S46) TRACON WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001809CD100
A8 DEMOLITION PLAN
1" = 30'
LEGEND
GRAVEL REMOVAL
GENERAL SHEET NOTES
A. PROTECT EXISTING FEATURES TO REMAIN INCLUDING ROADS, UTILITIES,
PAVING AND SIMILAR ITEMS NOT IN THE LIMITS OF DISTURBANCE, WHICH IF
DAMAGED MUST BE REPLACED IN KIND AT NO COST TO THE GOVERNMENT.
B. PRIOR TO CONSTRUCTION ALL EXISTING UTILITIES WITHIN THE LIMIT OF
DISTURBANCE MUST BE LOCATED WITH GROUND PENETRATION RADAR (GPR)
OR OTHER ACCEPTABLE METHODS.
C. MINIMUM CLEARANCE OF 12" BETWEEN BOTTOM OF PADS AND TOP OF
UTILITIES MUST BE MAINTAINED.
D. AVOID DIRECT IMPACT ON UTILITIES WHEN PLACING TEMPORARY EQUIPMENT.
E. UTILITIES WITHIN THE LIMITS OF DISTURBANCE MUST BE PROTECTED DURING
CONSTRUCTION, AND IF DAMAGED MUST BE REPLACED IN KIND AT NO COST
TO THE GOVERNMENT.
F. REMOVE CONCRETE PADS AFTER THE REMOVAL OF TEMPORARY CHILLERS
AND REPLACE WITH GRAVEL.
G. EXISTING CONDITIONS BASED ON RECORD DRAWINGS AND DOES NOT
REPRESENT FIELD LOCATED CONDITIONS, IF DIFFERENT REPORT TO COR.
LIMITS OF DISTURBANCE
DEMOLITION SHEET NOTES -
1. REMOVE GRAVEL AND STORE ON-SITE AT LOCATION APPROVED BY COR
N
TRACON BUILDING
WORKSHOP
BUILDING
COOLING TOWERS
DUMPSTER
PERIMETER
SECURITY FENCE
STORMWATER
DETENTION
FACILITY
ENGINE GENERATOR
BUILDING
ABOVE GROUND
FUEL TANK
LOADING DOCK
VEHICLE GATE
33.00'
20.50'
6.00'
10.00'
7.00'
10.75' 2.00'
1.37'
9.50'
SEA - D - TRACO - C110
SITE PLAN
FEET
Scale: 1 INCH = 30 FEET
60300 15
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
09/22/2023
SEATTLE TERMINAL RADAR APPROACH CONTROL
BUILDING (S46 TRACON)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE TRACON
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEATTLE (S46) TRACON WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001809
LEGEND
CONCRETE EQUIPMENT PAD (REFER TO
STRUCTURAL DRAWINGS FOR DETAILS)
C110
A8 SITE PLAN
1" = 30'
GENERAL SHEET NOTES
A. CONCRETE EQUIPMENT PADS MUST MAINTAIN POSITIVE DRAINAGE AWAY
FROM THE BUILDING
B. ADJUST CONCRETE EQUIPMENT PAD SIZE DEPENDING ON MECHANICAL
EQUIPMENT THAT IS SELECTED.
C. COORDINATE CONCRETE PAD SIZE AND LOCATION WITH EQUIPMENT
MANUFACTURER'S SPECIFICATIONS. CONCRETE PAD SIZE TO BE 12"
(MINIMUM) LARGER THAN EQUIPMENT ON ALL SIDES.
LIMITS OF DISTURBANCE
SHEET NOTES
1. INSTALL "SIDEWALK CLOSED" SIGN
FEET
Scale: 1 INCH = 10 FEET
20100 5 C110
C3 CONCRETE EQUIPMENT PAD ENLARGEMENT
1" = 10'
N
N
42931
BIN GE
S T
A T
E O
F WASHIN
G T
O N
S T
R U
C
TURAL ENG
IN
E
E
RP
R O
F
E
SSI ON A L E NG
IN
E
E R
THE STRUCTURAL DESIGN CONFORMS TO THE FOLLOWING CODES/STANDARDS:
1. FAA AIR TRAFFIC ORGANIZATION TERMINAL FACILITIES DESIGN STANDARD VERSION 2.0, AUGUST 1, 2022.
2. IBC 2021 INTERNATIONAL BUILDING CODE, INTERNATIONAL CODE COUNCIL.
3. ASCE/SEI 7–22 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES.
4. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY,
AMERICAN CONCRETE INSTITUTE, FIFTH PRINTING.
5. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION, 2016.
6. AWS D1.1-20, STRUCTURAL WELDING CODE
1. REINFORCING BARS: ASTM A615, GRADE 60, DEFORMED.
2. MINIMUM 28-DAY COMPRESSIVE STRENGTH: 5000 PSI
3. PROVIDE A 3/4" CHAMFER ON CONCRETE CORNERS.
4. REINFORCEMENT MUST HAVE A MINIMUM OF A CLASS "B" LAP SPLICE AT DISCONTINUOUS
REINFORCEMENT.
5. COVER FOR CONCRETE REINFORCEMENT:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3 INCHES
B. EXPOSED TO EARTH OR WEATHER WHERE FORMS ARE USED: #6 AND LARGER, 2 INCHES;
#5 AND SMALLER 1-1/2 INCHES.
C. NOT EXPOSED TO EARTH OR WEATHER: #11 AND SMALLER, 3/4 INCH.
1. MATERIALS:
A. CARBON STEEL WEDGE ANCHOR STUDS: ASTM A510 OR ASTM A108.
B. NUT & WASHER: COMPATIBLE WITH STUD MATERIAL & FINISH.
C. CARBON STEEL THREADED ROD: ISO 898 CLASS 5.8.
D. CONCRETE REINFORCING DOWELS: ASTM A615, GRADE 60
2. MECHANICAL ANCHORS AND THREADED INSERTS SHALL BE CARBON STEEL WITH ZINC PLATING IN ACCORDANCE WITH ASTM B 633,TYPE III Fe/Zn 5 (SC1), UNLESS NOTED OTHERWISE.
3. POST-INSTALLED ANCHORS MANUFACTURED BY HILTI, INC. ARE SPECIFIED AS A BASIS OF DESIGN AND TO
ESTABLISH THE DESIRED QUALITY AND PERFORMANCE OF THE WORK. OTHER APPROVED
MANUFACTURERS ARE:
A. SIMPSON STRONG TIE.
B. POWERS FASTENERS.
4. ANCHORING TO CONCRETE: TYPE AND SIZE AS INDICATED.
A. MECHANICAL ANCHORS:
a. MECHANICAL ANCHORS USED IN CONCRETE SHALL HAVE BEEN TESTED AND PREQUALIFIED FOR
PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2 AND
ICC-ES AC193, INCLUDING SEISMIC SHEAR AND TENSION.
B. ADHESIVE ANCHORS:
a. ANCHORS CONSISTING OF AN INSERT TYPE, EPOXY OR HYBRID ADHESIVE .
b. ADHESIVE SHALL HAVE BEEN TESTED AND PREQUALIFIED FOR PERFORMANCE IN CRACKED AND
UNCRACKED CONCRETE IN ACCORDANCE WITH ICC-ES AC308, INCLUDING SEISMIC SHEAR &
TENSION, HORIZONTAL AND OVERHEAD INSTALLATIONS, AND LONG TERM CREEP.
5. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS.