This document appears to be a set of drawings titled "J-3a_SEA_Drawings_Seattle ATCT (SEA).pdf" related to the federal contract opportunity "SEA ATCT and S46 TRACON Major Mechanical Upgrades" solicitation number 697DCK-24-R-00423 issued by the Department of Transportation Federal Aviation Administration Southwestern Region.
The scope of work includes the replacement of chillers, boilers, and cooling towers at the Seattle TRACON (S46) and Seattle ATCT (SEA) facilities as detailed in the plans and specifications. The contract opportunity is for the major mechanical upgrades required at these facilities.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
Department of Transportation Federal Aviation Administration
/1 /2
:0
:0
P M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G001
COVER SHEET
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
R, SIMMONS
H. LEE
W. STEVENS
SEATTLE ATCT
Seattle Airport Traffic Control Tower (SEA ATCT) Major Mechanical Upgrade SeaTac, Washington
Final Submission October 13, 2023
SEATAC
WASHINGTON
KEY NORTH
ARROW
ELEVATION
DATUM
SECTION
GRAPHIC SCALE
DETAIL BOUNDARY
BREAK LINES
CENTER LINES
EXTERIOR
ELEVATION
COLUMN LINE GRID
DESIGNATION:
KEYNOTE (NUMBER
DESIGNATION)
A
0'-0"
FLOOR LEVEL
DETAIL NO.
SHEET. ON WHICH
DETAIL IS SHOWN
DEMO WORK WORK
MAGNETIC NORTH
A1
A101
02 4 8134
SCALE: 1/4"=1'-0"
A1
A301
A101
SIM
PLAN NORTH/
PROJECT NORTH
EXISTING WORK
DEMOLISHED WORK
WORK
N
SITE
SITE
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/1
/2
:3
:4
P M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G002
INDEX OF DRAWINGS, GENERAL NOTES, GENERAL
LEGEND, VICINITY AND LOCATION MAP
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
R, SIMMONS
H. LEE
W. STEVENS
SEATTLE ATCT
SEATAC
WASHINGTON
LOCATION PLANVICINITY PLAN
INDEX OF DRAWINGS GENERAL LEGEND
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/1
/2
:3
:4
P M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G002
INDEX OF DRAWINGS, GENERAL NOTES, GENERAL
LEGEND, VICINITY AND LOCATION MAP
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
R, SIMMONS
H. LEE
W. STEVENS
SEATTLE ATCT
SEATAC
WASHINGTON
GENERAL NOTES
NN
DRAWING
NUMBER
DRAWING TITLE
GENERAL
G001 COVER SHEET
G002 INDEX OF DRAWINGS, GENERAL NOTES, GENERAL LEGEND, VICINITY AND
LOCATION MAP
G003 ABBREVIATIONS
G004 CONSTRUCTION STAGING PLAN
G101 LIFE SAFETY - FIRST & SECOND FLOOR PLANS
G102 LIFE SAFETY - SUBJUNCTION LEVELS 1 & 2 PLANS
CIVIL
CD100 DEMOLITION PLAN
C110 SITE PLAN
C800 SITE DETAILS
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S002 STRUCTURAL ABBREVIATIONS, SYMBOLS, & LEGEND
S003 LOAD PLANS
ST101 STRUCTURAL PLANS - TEMPORARY PLATFORM
ST201 TEMPORARY PLATFORM BRACING SECTIONS
ST501 DETAILS - FOUNDATIONS
ST517 DETAILS - STEEL BRACING
ST532 DETAILS - HANDRAILS & CURTAIN WALL
SD101 STRUCTURAL DEMOLITION PLANS
S101 STRUCTURAL PLANS - LOW ROOF
S301 BUILDING SECTIONS
S510 STEEL SECTIONS & DETAILS
ARCHITECTURE
AT101 TEMPORARY CONSTRUCTION PLAN
AD101 DEMOLITION PLANS
AD102 DEMOLITION ELEVATION
AD103 DEMOLITION BUILDING SECTIONS
AD104 DEMOLITION ROOF DETAILS
A101 WORK PLANS
A102 TOWER PLANS
A121 WORK REFLECTED CEILING PLAN
A301 ELEVATION
A311 BUILDING SECTIONS
A401 ROOF DETAILS
A402 EXTERIOR DETAILS
FIRE PROTECTION
F001 FIRE PROTECTION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
F101 FIRE ALARM - FIRST FLOOR PLAN
F102 FIRE ALARM - SECOND FLOOR PLAN
F103 FIRE ALARM - SUBJUNCTION LEVELS 1 & 2 PLANS
F301 FIRE ALARM MATRIX, RISER DIAGRAM, AND DETAILS
DRAWING
NUMBER
DRAWING TITLE
MECHANICAL
M001 HVAC ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES
M002 HVAC CONTROLS SYMBOLS, ABBREVIATIONS AND CONSTRUCTION
SEQUENCE
MT101 HVAC TEMPORARY WORK - FIRST FLOOR
MD101 HVAC DEMOLITION - FIRST FLOOR
MD102 HVAC DEMOLITION - SECOND FLOOR
MD103 HVAC DEMOLITION - FOURTEENTH FLOOR
MD104 HVAC DEMOLITION - FIFTEENTH FLOOR
M101 HVAC NEW WORK - FIRST FLOOR
M102 HVAC NEW WORK - SECOND FLOOR
M103 HVAC NEW WORK - FOURTEENTH FLOOR
M104 HVAC NEW WORK - FIFTEENTH FLOOR
M401 HVAC NEW WORK ISOMETRIC
M500 HVAC SCHEDULES
M600 HVAC SEISMIC DETAILS
M601 HVAC SEISMIC DETAILS
M602 HVAC TYPICAL DETAILS
M801 HVAC CONTROL DIAGRAMS
M802 HVAC CONTROL DIAGRAMS
M803 HVAC CONTROL DIAGRAMS
M804 DDC POINT FUNCTION SCHEDULE
M805 DDC POINT FUNCTION SCHEDULE
M806 SEQUENCE OF OPERATION
ELECTRICAL
E001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E002 ELECTRICAL SYMBOLS
ET100 PARTIAL SITE PLAN - TEMPORARY POWER CONDUIT PATH
ET101 PARTIAL SITE PLAN - TEMPORARY POWER
ED101 ELECTRICAL DEMOLITION PLANS
ED102 ELECTRICAL DEMOLITION PLANS
ED103 ELECTRICAL DEMOLITION PLANS
E101 ELECTRICAL POWER PLANS
E102 ELECTRICAL POWER PLANS
E103 ELECTRICAL POWER PLANS
E500 PANELBOARD SCHEDULES
E501 PANELBOARD SCHEDULES
E550 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
E600 ELECTRICAL DETAILS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E800 ELECTRICAL CONSTRUCTION SEQUENCING PLAN
E801 POWER ONE-LINE DIAGRAM
E802 POWER ONE-LINE DIAGRAM - ESSENTIAL MCC
REFERENCE A. VERIFY FIELD CONDITIONS RELATING TO AND AFFECTING THE EXECUTION OF THE
WORK, AS INDICATED IN THE CONTRACT DOCUMENTS.
B. WORK MUST CONFORM TO APPLICABLE CODES AND ORDINANCES. DISCREPANCIES
BETWEEN CONTRACT DOCUMENTS AND CODES MUST BE BROUGHT TO THE COR'S
ATTENTION BEFORE PROCEEDING.
C. DO NOT SCALE DRAWINGS. DIMENSIONAL DATA MUST BE OBTAINED FROM WRITTEN
INFORMATION ONLY. VERIFY DIMENSIONS BEFORE PROCEEDING. BRING TO THE
ATTENTION OF THE COR ANY DIMENSIONAL DEVIATION FROM THAT SHOWN ON THE
DRAWINGS, WHICH MAY AFFECT INTENT OF DESIGN OR PROPER INCORPORATION OF
ELEMENTS.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL,
ELECTRICAL, FIRE PROTECTION AND OTHER SYSTEMS. FOR DEMOLITION REQUIRED
OUTSIDE OF AREA SHOWN ON ARCHITECTURAL, REFER TO MECHANICAL, ELECTRICAL
AND FIRE PROTECTION FOR ITEMS TO BE REMOVED.
E. DIMENSIONS INDICATED IN CONTRACT DOCUMENTS ARE FROM FACE OF EXISTING
STRUCTURE OR FINISH, FACE OF CONCRETE OR BLOCK, OR TO COLUMN LINE,
EXCEPT AS NOTED OTHERWISE. DIMENSIONS OF EXISTING STRUCTURE, ETC. ARE +/-
AND WILL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. NOTIFY COR OF
ANY DISCREPANCIES.
F. PROVIDE SOLID BLOCKING REQUIRED TO INSTALL EQUIPMENT, MILLWORK, ETC.
G. BLOCKING AND MISCELLANEOUS STEEL SHOWN IN DETAILS AND SECTIONS MUST BE
CONTINUOUS UNLESS SPECIFICALLY NOTED OTHERWISE
H. COORDINATE MECHANICAL, ELECTRICAL & STRUCTURAL WORK AND PROVIDE
NECESSARY CONSTRUCTION TO FACILITATE SAID WORK INCLUDING, BUT NOT
LIMITED TO ROUGH OPENINGS, EQUIPMENT SUPPORTS, BACKING AND COORDINATION
OF FINISH WORK.
I. SHOULD A DISCREPANCY IN THE CONTRACT DOCUMENTS OR SPECIFICATIONS
OCCUR, IMMEDIATELY NOTIFY COR FOR RESOLUTION BEFORE PROCEEDING WITH
WORK.
J. PROTECT EXISTING BUILDING, SITE ELEMENTS, LANDSCAPING, SIGNS WALKS,
CURBS, ETC. ON PROJECT SITE.
K. THE BUILDING IS OCCUPIED, AND MUST REMAIN OPERATIONAL. COORDINATE
CONSTRUCTION ACTIVITIES THAT MAY IMPEDE OPERATIONS, INCLUDING ACTIVITIES
WHICH CREATES EXCESSIVE NOISE, AIRBORNE DIRT, OR THAT DISRUPTS THE
FUNCTIONALITY OF THE SPACE. PROTECT ANY ADJACENT SPACE WITH DUST
PARTITIONS OR CURTAINS FROM ACTIVITIES WHICH WILL CREATE DUST. NOTIFY COR
OF CONSTRUCTION ACTIVITIES WHICH MAY DISRUPT BUILDING OPERATIONS.
L. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/ UTILITIES OR OPERATIONS IS
NOT ALLOWED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES
MUST BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING
DAYS PRIOR TO THE PERFORMANCE OF THE WORK.
M. IT IS PRESUMED THAT THE BUILDING DOES NOT CONTAIN ASBESTOS CONTAINING
MATERIALS. IF HAZMAT IS ENCOUNTERED DURING THE WORK, CEASE WORK IN THAT
AREA AND NOTIFY COR TO DEVELOP PLAN ON HOW TO PROCEED WITH THE WORK.
N. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS,
ROOFS OR SMOKE BARRIERS PENETRATED AS A RESULT OF THE WORK WITH AN
APPROVED UL FIRE AND SMOKE STOP ASSEMBLIES. SUBMIT TO COR FOR APPROVAL
FIRE AND SMOKE STOP PENETRATION DETAILS.
O. RESTORE EXPOSED WALL, FLOOR, CEILING, SLAB AND ROOF FINISHES OF PATCHED
AREAS AND EXTEND FINISH RESTORATION INTO RETAINED ADJOINING
CONSTRUCTION TO NEAREST INTERSECTION OR NATURAL BREAK.
MAGNETIC
NORTH
PROJECT
NORTH
MAGNETIC
NORTH
PROJECT
NORTH
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/1
/2
:0
:0
P M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G003
ABBREVIATIONS
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
R, SIMMONS
H. LEE
W. STEVENS
SEATTLE ATCT
SEATAC
WASHINGTON
A A AMPERE, AIR, COMPRESSED AIR LINE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT, BOTT BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER, CONDENSATE
DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL
INPUT
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE
SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT, ENTR ENTRANCE
EP EXHAUST PIPE
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
K KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L LAN LOCAL AREA NETWORK
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
M M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFD OVERFLOW ROOF DRAIN
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT, RPTS RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH, SCHED SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE
INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND OPERATIONS
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
W W WATT
W/ WITH
WD WOOD
WG WATER GAGE
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
X XFER, XFR TRANSFER
XFMR TRANSFORMER
Y Y WYE CONNECTION
YD YARD
GENERAL ABBREVIATIONS
BASE BUILDING
ATCT
SECURITY GATE
MAIN BUILDING
ENTRANCE
DUMPSTER
PERIMETER
SECURITY FENCE
ENTRANCE TO
CONTRACTOR
LAYDOWN AREA 10.00'
ENGINE GENERATOR
BUILDINGABOVE GROUND
FUEL TANK
39.00'
29.00'
26.00'
22.00'
CONTRACTOR
TRAILER
RESIDENT ENGINEER
TRAILER
APPROXIMATE TEMPORARY
ELECTRIC AND TELEPHONE
LOCATION (REFER TO ELECTRICAL)
TEMPORARY
ELECTRICAL
EQUIPMENT
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
10/13/2023
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE ATCT
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEA ATCT WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001810
LEGEND
SEA - D - ATCT - G004
CONTRACTOR LAYDOWN AREA
CRANE LAYDOWN AREA
TEMPORARY COOLING TOWER PLATFORM (SEE
MECHANICAL DRAWINGS)
CONSTRUCTION STAGING PLAN
CONSTRUCTION SEQUENCE
DEVELOP RISK MITIGATION PLAN TO ACCOMMODATE REMOVING AND PROVIDING EQUIPMENT AS PART OF THE WORK. COORDINATE FINAL PLAN REQUIREMENTS WITH COR. RISK MITIGATION PLAN MUST AT A MINIMUM
ADDRESS PROTECTION OF BUILDING, OCCUPANTS, AND BUILDING SECURITY.
DEVELOP RISK MITIGATION PLAN TO ACCOMMODATE REMOVAL OF EXISTING EXITS FROM BUILDING TO ALLOW FOR THE WORK AND TO MAINTAIN REQUIRED EGRESS FROM AREAS IMPACTED BY CONSTRUCTION.
RISK MITIGATION PLAN MUST IDENTIFY AND DOCUMENT RISKS/HAZARDS POSED BY THE WORK AND IDENTIFY ACTION REQUIRED TO REDUCE THE RISK. THE PLAN MUST INCLUDE DAILY CONSTRUCTION BRIEFINGS WITH THE COR AND REGULAR INSPECTIONS. RISK MITIGATION PLANS MUST ADDRESS, BUT IS NOT LIMITED TO INFORMING OCCUPANTS AND VISITORS OF CONSTRUCTION ACTIVITY THAT AFFECT FIRE PROTECTION AND LIFE SAFETY WITHIN THE FACILITY. RISK MITIGATION MUST ADDRESS ALTERNATE MEANS OF EGRESS FOR BUILDING OCCUPANTS, SIGNAGE, AND IF REQUIRED BY COR, TRAINING WHEN EGRESS ROUTES ARE REVISED AS A RESULT
OF THE WORK.
GENERAL
1. THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS. DIVISION 01 SPECIFICATIONS HAVE
PRECEDENCE OVER THESE NOTES.
2. CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA IF REQUIRED MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH
ONGOING PROJECTS. LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT
PRECONSTRUCTION CONFERENCE.
3. ATCT IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY AND IT IS REQUIRED TO COORDINATE CONSTRUCTION ACTIVITY WITH COR SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ATCT.
4. EXISTING CONDITIONS ARE REFERENCED FROM FAA SUPPLIED DRAWINGS AND SHOULD ONLY BE USED AS A
REFERENCE AS THEY MAY DIFFER FROM ACTUAL FIELD CONDITIONS.
5. CONTRACTOR MUST PROVIDE STRUCTURE FOR SUPPORT OF TEMPORARY COOLING TOWERS OUTSIDE BUILDING FOOTPRINT. ADJUST STEEL STRUCTURE SUPPORTS TO MATCH ACTUAL TEMPORARY COOLING
TOWER DIMENSIONS (SEE STRUCTURAL DRAWINGS).
6. MAINTAIN EMERGENCY VEHICLE ROUTE AND USAGE OF EXISTING TRAVELWAYS ADJACENT TO THE PROJECT.
7. UPON COMPLETION OF CONSTRUCTION OF THE PROJECT, THE PROJECT AREA MUST BE FREE OF DEBRIS AND UNUSED MATERIAL. DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES MUST BE RESTORED TO MEET OR EXCEED THE ORIGINAL EXISTING CONDITIONS TO THE SATISFACTION OF THE COR, TO INCLUDE PAVEMENT MARKINGS IN THE VICINITY OF CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. DAMAGE TO EXISTING ENTRANCES, PAVEMENT OR OTHER STRUCTURES NOT PROPOSED TO BE
DEMOLISHED WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR. THIS INCLUDES AREA OF
CONSTRUCTION STORAGE AND CONSTRUCTION TRAILER AREAS.
9. ACCESSIBLE ROUTE FROM HANDICAP SPACES TO MAIN ENTRANCE MUST NOT BE IMPACTED.
A. CONSTRUCTION ACCESS
A.1. CONTRACTOR'S VISITORS AND DELIVERIES TO SITE MUST BE THROUGH THE MAIN ENTRANCE
SECURITY GATE IDENTIFIED THROUGH COR.
A.2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN
AND DIRECT PERSONS NEAR CONSTRUCTION AREAS.
A.3. ACCESS TO BUILDING MUST BE LIMITED. CORDINATE WITH COR.
A.4. KEEP LOADING DOCK ACCESSIBLE FOR FAA DELIVERIES.
A.5. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT: 5:30
- 6:45 AM, 12:30 PM - 2:30 PM AND 10:15 PM, VERIFY TIME WITH COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLE MUST
NOT BE ALLOWED ON SITE.
A.6. DO NOT BLOCK ACCESS OR EGRESS FROM BUILDING EXITS. COORDINATE WITH COR RISK MITIGATION PLAN IF THE FOLLOWING EXITS WILL BE TEMPORARILY BLOCKED: EMPLOYEE ENTRANCE/EXIT OR
AREAWAY.
B. CONTRACTOR PARKING
B.1. PARKING MUST BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT ATCT
ARE OFF-LIMITS FOR CONTRACTOR PARKING.
C. FAA SECURITY REQUIREMENTS
C.1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR.
TEMPORARY SECURITY BADGES WILL BE ISSUED TO QUALIFIED CONSTRUCTION PERSONNEL.
CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR
PERSONNEL WHILE IN THE BUILDING. CONTRACTOR'S VEHICLES MUST BE MARKED. REFER TO
DIVISION 1 FOR MORE DETAILED REQUIREMENTS.
C.2. SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS
AND COMPLY WITH FAA'S SECURITY REQUIREMENTS.
C.3. FAA VISITORS BADGES ARE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE
BUILDING. OBTAIN FAA SECURITY BADGES FOR PROJECT SUPERINTENDENT AND ONE
REPRESENTATIVE FOR EACH SUBCONTRACTOR ON SITE FOR MORE THAN 60 DAYS. THE BADGED
CONTRACTOR MUST ESCORT SUBCONTRACTORS AND OTHER WORKERS ON THE SITE. TEMPORARY
BADGES ARE REQUIRED FOR CONTRACTORS AND OTHER WORKERS FOR DURATION LESS THAN 60
DAYS.
C.4. USE GREAT CARE AND CAUTION WHILE WORKING ON THIS FACILITY. WORK MUST BE COORDINATED
WITH COR. DISRUPTION OF THIS FACILITY IS NOT PERMITTED.
C.5. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF
THIS CONTRACT. ENSURE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR
ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. NOTIFY COR IMMEDIATELY OF DAMAGE OR DISRUPTION
OF ELECTRICAL SERVICES. REPAIRS AND RESTORATIONS ARE AT NO COST TO THE FAA.
C.6. A MINIMUM OF THREE (3) CONTRACTORS MUST MEET THE REQUIREMENTS AND SECURE FAA BADGES
FOR THE DURATION OF CONSTRUCTIONS. OTHER CONTRACTORS MUST BE ESCORTED BY FAA
BADGED CONTRACTORS.
D. CONSTRUCTION MATERIAL STORAGE
D.1. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE IS LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED AT THE DISCRETION OF
COR. DO NOT DIG WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND
UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. INSTALL A PADLOCK ON GATE FOR
CONSTRUCTION STAGING AREA. PROVIDE KEY TO COR.
D.2. COORDINATE DELIVERY OF MATERIALS THROUGH THE COR. HAVE PERSONNEL ON SITE TO RECEIVE
DELIVERIES.
D.3. FLUID SPILLS MUST BE IMMEDIATELY CONTAINED AND PROPERLY CLEANED UP AND DISPOSED OF. AT PROJECT COMPLETION, SPILLS, OR OTHER DEBRIS MUST BE PROPERLY REMOVED AND DISPOSED OF
AND AREA RETURNED TO PRE-CONSTRUCTION CONDITIONS.
E. CONSTRUCTION DEBRIS
E.1. ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY
CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE
KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY. PROVIDE SEPARATE DUMPSTER, IF REQUIRED, FOR ABATEMENT MATERIAL. QUANTITY AND POSITION OF DUMPSTERS MUST BE COORDINATED WITH THE COR PRIOR
TO THEIR DELIVERY AND PLACEMENT.
F. CONSTRUCTION OFFICE
F.3. COORDINATE WITH COR USE OF MOBILE CELL PHONE USE INSIDE AND OUTSIDE BUILDING. CERTAIN
AREAS OF THE FACILITY ARE SENSITIVE TO CELL PHONE USAGE.
F.4. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH CONSTRUCTION OF TEMPORARY
G. CONSTRUCTION TOILET FACILITIES
G.1. PROVIDE PORTABLE CHEMICAL TOILETS, PAID FOR AND MAINTAINED BY THE CONTRACTOR AS
REQUIRED AT THE TEMPORARY CONSTRUCTION STAGING AREA. COORDINATE WITH THE COR FOR
SCHEDULING OF SERVICE.
G.2. PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS TO CONSTRUCTION STAGING AREA.
G.3. LOCATE PORTABLE TOILETS A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER
FEATURE (INLET, SWALE, DITCH, POND, ETC.).
H. DEMOLITION AND CONSTRUCTION HOURS
H.1. ACTIVITIES MUST NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY.
DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 5:00 AM TO 12:00 AM. WORK
DETERMINED BY THE COR TO BE DISRUPTIVE TO THE OPERATIONS WILL BE STOPPED AND
RESCHEDULED TO BE PERFORMED DURING OFF-HOURS.
H.2. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY. COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/ GOVERNMENT EQUIPMENT. WORK IN AREAS WITH CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OR AS APPROVED
BY COR.
H.3. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 WORKING
DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK.
J. EQUIPMENT PROTECTION
J.1 PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE
DRILLING.
J.2 SHUTDOWNS AND SWITCH OVERS OF PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE H.1 THIS SHEET UNDER DEMOLITION AND
CONSTRUCTION HOURS. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND
SWITCH OVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH
CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) CIRCUIT
BREAKER.
J.3 WELDING EQUIPMENT MUST NOT BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING IS NOT PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. REVIEW WITH
COR TYPE OF WELDING CUTTING TO BE PERFORMED AT FACILITY 10 DAYS PRIOR TO USE.
G004
A8 CONSTRUCTION STAGING PLAN
1" = 30'
GENERAL CONSTRUCTION STAGING NOTES
FEET
Scale: 1 INCH = 30 FEET
60300 15
POWER/TELECOMMUNICATION.
SHEET NOTES
1. INSTALL "SIDEWALK CLOSED" SIGN, ADJUST LOCATION WITH CONSTRUCTION
LIMITS
2. INSTALL CHAIN-LINK FENCE AROUND TEMPORARY COOLING TOWER YARD
GENERAL SHEET NOTES
A. DEMOLISH CONCRETE SIDEWALK AS NECESSARY TO ACCOMMODATE FOR
TEMPORARY COOLING TOWER FOUNDATION.
B. TRAILER LOCATIONS SHOWN IS APPROXIMATE, FINAL LOCATION MUST BE
APPROVED BY COR.
C. TEMPORARY UTILITY CONNECTIONS MUST BE COORDINATED WITH TRAILER
UTILITY CONNECTION POINTS.
D. TEMPORARY UTILITIES MUST BE PROTECTED DURING CONSTRUCTION.
E. TEMPORARY UTILITIES MUST BE REMOVED AFTER CONSTRUCTION.
F. ASPHALT AND CONCRETE PAVEMENT MUST NOT BE REMOVED DURING
INSTALLATION OF TEMPORARY UTILITIES.
G. TEMPORARY UTILITIES MUST NOT OBSTRUCT EMERGENCY VEHICLE ACCESS.
H. TEMPORARY TRAILERS MUST MAINTAIN POSITIVE DRAINAGE TO NEAREST
DRAINAGE STRUCTURE OR FACILITY.
I. PROTECTIVE MEASURES MUST BE IN PLACE TO PROTECT EXISTING ASPHALT
IN CRANE LAYDOWN AREA.
TEMPORARY ELECTRICAL EQUIPMENT AREA
F.1. LOCATE CONTRACTOR'S TRAILERS FOR OFFICE IN CONSTRUCTION STAGING AREA. LOCATE
MATERIALS AND EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREA. TEMPORARY POWER
IS AVAILABLE AT THE BASE BUILDING, IF REQUIRED FOR CONSTRUCTION PURPOSES. POINT OF
CONNECTION MUST BE DETERMINED AT PRE CONSTRUCTION CONFERENCE. COORDINATE POWER
AND TELECOMMUNICATION UTILITY SERVICES AND CONNECTIONS WITH THE COR.
F.2. TEMPORARY POWER SERVICE IS AVAILABLE AT THE BASE BUILDING TO SUPPORT THE CONSTRUCTION WORK. REFER TO ELECTRICAL FOR TEMPORARY POWER PROVISIONS. CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY POWER AND TELECOMMUNICATION UTILITIES FOR CONSTRUCTION STAGING
AND TEMPORARY CONTRACTOR AND RESIDENT ENGINEER TRAILER FACILITIES.
N
10 13 2023
LIFE SAFETY SYMBOLS:
TD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE (MAX: 300 FT)
COMMON PATH OF TRAVEL (MAX: 100 FT)
1 HOUR FIRE RATED ASSEMBLY
X
Y
W
Z
CP = #FT
OCCUPANT LOAD TABLE
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
FIRST FLOOR SECOND FLOOR
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
117 N.A.S. EQUIPMENT STORAGE 300 102821
110 BOILER STORAGE 300 4999
111 CHILLER STORAGE 300 3774
115 STORAGE STORAGE 300 2389
116 SHIPPING/ RECIEVING/ MAINT. STORAGE 300 3675
112 ELECTRICAL/ UPS STORAGE 300 2484
113 BATTERY ROOM STORAGE 300 1166
216 CONT. SUPT. 116 STORAGE 300 1
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
202/203 CONFERENCE/ TRAINING/ BRIEFING ASSEMBLY 15 52772
204 BREAK/ KITCHEN BUSINESS 15 24351
207 CBI LAB BUSINESS 50 5220
222 TAPE ROOM STORAGE 300 199
223 STORAGE STORAGE 300 1130
210 SUPPORT SPEC BUSINESS 15 28412
212 COPY/ FILE STORAGE 300 1113
STORAGE ROOM STORAGE 300 1235
STORAGE
102 ELEVATOR MACHINE ROOM 300 175
FLOOR TWO TOTALFLOOR ONE TOTAL
REM. GROSS BUSINESS 1504994REM. GROSS BUSINESS 1503053 21
STORAGE
105 ELECTRON. WORKSHOP 50 17810 BUSINESS 217
BOILER
CHILLER
ELECTRICAL/ UPS
BATTERY ROOM
SHIPPING/
RECEIVING/ MAINT.
STORAGE
115STAIR/ VESTIBULE
ELECTRON. WRKSHP
N.A.S. EQUIPMENT
CCMS
AF COORDINATOR
ENV. OPS SUPER
VEST.
CORRIDOR
MEN
ELEV. MACH. RM.
WOMEN
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
TD = 84'
TD = 62'
CP = 36'
STAIR/ VESTIBULE
CBI LAB
WEATHER OBS.
AT MGR
OPS MGR
OPS SUPER
COPY/ FILE
SUPPORT SPEC
ADMIN
LOBBY
CONT. SUPT.
STORAGE
WOMEN
SHOWER ROOM
SHOWER ROOM
MEN
STORAGE
TAPE ROOM
BREAK/ KITCHEN
CONFERENCE
TRAINING/ BRIEFING
CORRIDOR
CORRIDOR
CORRIDOR
TD = 164'
CP = 36'
TD =99'
0.3
0.3
TO FIRST FLOOR
STAIRS TO FIRST FLOOR
CP = 46'
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 0 8
Scale: 3/32 INCH = 1 FOOT
16 24
N
P L O
T D
A T
E /T
IM
E
/1
/2
:0
:3
A M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G101
LIFE SAFETY - FIRST & SECOND FLOOR PLANS
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
C. LEE
C. LEE
J. WATKINS
SEATTLE ATCT
SEATAC
WASHINGTON
- 3/32" = 1'-0"
B8 LIFE SAFETY - FIRST FLOOR PLAN
- 3/32" = 1'-0"
B6 LIFE SAFETY - SECOND FLOOR PLAN
GENERAL SHEET NOTES
CODES AND STANDARDS
LIFE SAFETY MEANS OF EGRESS REQUIREMENTS MUST BE IN ACCORDANCE
WITH NFPA 101, 2021 EDITION, AND AS INDICATED ON LIFE SAFETY PLANS.
A. ASSEMBLY OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 250 FEET
b. MAX COMMON PATH OF TRAVEL 75 FEET
c. MAX DEAD END 20 FEET
B. BUSINESS OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 300 FEET
b. MAX COMMON PATH OF TRAVEL 100 FEET
c. MAX DEAD END 50 FEET
A. THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE
PARTITIONS AS THEY WERE SHOWN ON PROVIDED AS-BUILTS.
WHERE RATINGS ARE REQUIRED BY CODE OR FAA STANDARDS,
BUT ARE NOT PRESENT, THEY ARE INDICATED AS KEY NOTES ON
THIS DRAWING. CONTRACTOR SHALL VERIFY AND CONFIRM
EXISTING WALL RATINGS PRIOR TO CONSTRUCTION AS PART OF
PROJECT SCOPE.
B. UNLESS SPECIFICALLY INDICATED IN THIS DRAWING PACKAGE, THIS
PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING
ANY OF THESE EXISTING PARTITIONS THAT DO NOT CURRENTLY
PROVIDE THE REQUIRED FIRE RATING. THIS PROJECT SCOPE
INCLUDES:
a. FIRE STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW PENETRATIONS IN THESE PARTITIONS MADE
BY THE WORK OF THIS PROJECT.
b. FIRE STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW OPENINGS/ HOLES MADE BY THE WORK OF
THIS PROJECT (REMOVALS OF EXISTING ITEMS LEAVING
OPENINGS/ HOLES).
G101 G101
LIFE SAFETY NOTES
1402 MECH. ROOM 1250 STORAGE 300 5
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
1502 ELECTRONIC EQ. 1763 STORAGE 300 6
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
SUBJUNCTION LEVEL 2 SUBJUNCTION LEVEL 1
1403 UTILITY 255 STORAGE 300 1 1503 UTILITY 176 STORAGE 300 1
1404 VESTIBULE 31 BUSINESS 150 1 1504 VESTIBULE 33 BUSINESS 150 1
SUBJUNCTION LEVEL 2 TOTAL 7 SUBJUNCTION LEVEL 2 TOTAL 8
VESTIBULE
MECHANICAL
STAIR
UTILITY
CP = 92'
0.3
ELECTRONIC
EQUIPMENT
VESTIBULE
STAIR
UTILITY
CP = 87'
0.3
LIFE SAFETY SYMBOLS:
TD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE (MAX: 300 FT)
COMMON PATH OF TRAVEL (MAX: 100 FT)
2 HOUR FIRE RATED ASSEMBLY
X
Y
W
Z
CP = #FT
OCCUPANT LOAD TABLE
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 0 8
Scale: 1/8 INCH = 1 FOOT
N
P L O
T D
A T
E /T
IM
E
/1
/2
:0
:3
A M
SEATAC WASEA ATCT
WESTERN SERVICE AREA DES MOINES, WA
TERMINAL
ENGINEERING
GROUP
10/13/2023 19001810
SEA - D - ATCT - G102
LIFE SAFETY - SUBJUNCTION LEVELS 1 & 2 PLANS
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
C. LEE
C. LEE
J. WATKINS
SEATTLE ATCT
SEATAC
WASHINGTON
- 1/8" = 1'-0"
F8 LIFE SAFETY - SUBJUNCTION LEVEL 2 (LEVEL 14) PLAN
- 1/8" = 1'-0"
C8 LIFE SAFETY - SUBJUNCTION LEVEL 1 (LEVEL 15) PLAN
GENERAL SHEET NOTES
LIFE SAFETY NOTES
A. THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE
PARTITIONS AS THEY WERE SHOWN ON THE PROVIDED AS-BUILTS.
CONTRACTOR SHALL VERIFY AND CONFIRM EXISTING WALL
RATINGS PRIOR TO CONSTRUCTION AS PART OF PROJECT
SCOPE.
B. UNLESS SPECIFICALLY INDICATED IN THIS DRAWING PACKAGE, THIS
PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING
ANY OF THESE EXISTING PARTITIONS THAT DO NOT CURRENTLY
PROVIDE THE REQUIRED FIRE RATING. THIS PROJECT SCOPE
INCLUDES:
a. FIRE STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW PENETRATIONS IN THESE PARTITIONS MADE
BY THE WORK OF THIS PROJECT.
b. FIRE STOPPING TO COMPLY WITH THE INDICATED
RATINGS AT NEW OPENINGS/ HOLES MADE BY THE WORK OF
THIS PROJECT (REMOVALS OF EXISTING ITEMS LEAVING
OPENINGS/ HOLES).
CODES AND STANDARDS
LIFE SAFETY MEANS OF EGRESS REQUIREMENTS MUST BE IN
ACCORDANCE WITH NFPA 101, 2021 EDITION, AND AS INDICATED ON
LIFE SAFETY PLANS.
A. BUSINESS OCCUPANCY (EXISTING, SPRINKLERED)
a. MAX TRAVEL DISTANCE 300 FEET
b. MAX COMMON PATH OF TRAVEL 100 FEET
c. MAX DEAD END 50 FEET
B. STORAGE OCCUPANCY
a. MAX TRAVEL DISTANCE 400 FEET
b. MAX COMMON PATH OF TRAVEL 100 FEET
c. MAX DEAD END 100 FEET
G102
G102
SECURITY GATE
MAIN BUILDING
ENTRANCE
DUMPSTER
PERIMETER
SECURITY FENCE
ENGINE GENERATOR
BUILDINGABOVE GROUND
FUEL TANK
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
10/13/2023
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE ATCT
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEA ATCT WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001810
LEGEND
SEA - D - ATCT - CD100
CONCRETE SIDEWALK DEMOLITION
DEMOLITION PLAN
CD100
A8 DEMOLITION PLAN
1" = 30'
FEET
Scale: 1 INCH = 30 FEET
60300 15
GENERAL SHEET NOTES
A. SAWCUT CONCRETE PAVEMENT TO FULL DEPTH AT THE LIMITS OF
DEMOLITION OR AT THE NEXT NEAREST JOINT.
B. PROTECT EXISTING FEATURES TO REMAIN INCLUDING ROADS, UTILITIES,
PAVING AND SIMILAR ITEMS NOT IN THE CONTRACT WORK LIMITS, WHICH IF
DAMAGED MUST BE REPLACED IN KIND AT NO COST TO THE GOVERNMENT.
C. PICNIC TABLES LOCATED IN THE LIMITS OF CONCRETE DEMOLITION MUST BE
STORED DURING CONSTRUCTION AND RETURNED TO ORIGINAL LOCATION
UNLESS DIRECTED OTHERWISE BY COR.
D. PRIOR TO CONSTRUCTION EXISTING UTILITIES WITHIN THE LIMIT OF
DISTURBANCE MUST BE LOCATED WITH GROUND PENETRATION RADAR (GPR)
OR OTHER ACCEPTABLE METHODS.
E. REMOVE AND PROVIDE CONCRETE IN THE LIMITS OF DISTURBANCE AFTER
THE REMOVAL OF THE TEMPORARY COOLING TOWERS.
LIMITS OF DISTURBANCE
DEMOLITION SHEET NOTES -
1. PROTECT HANDICAP ACCESSIBLE RAMP
2. INSTALL "SIDEWALK CLOSED" SIGN, ADJUST LOCATION WITH
CONSTRUCTION LIMITS
SECURITY GATE
MAIN BUILDING
ENTRANCE
DUMPSTER
PERIMETER
SECURITY FENCE
ENGINE GENERATOR
BUILDINGABOVE GROUND
FUEL TANK
6.00'*
4.00'* 2.00'
6.27'
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
10/13/2023
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE ATCT
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEA ATCT WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001810
LEGEND
SEA - D - ATCT - C110
CONCRETE
SITE PLAN
C110
A8 SITE PLAN
1" = 30'
FEET
Scale: 1 INCH = 30 FEET
60300 15
GENERAL SHEET NOTES
A. CONCRETE SIDEWALK SURFACE MUST BE FLUSH WITH EXISTING CONCRETE
SIDEWALK SURFACE
B. CONCRETE SIDEWALK MUST MAINTAIN POSITIVE DRAINAGE AWAY FROM THE
BUILDING
C. REMOVE TEMPORARY ELECTRIC CONCRETE PAD AFTER REMOVAL OF
TEMPORARY ELECTRIC EQUIPMENT
LIMITS OF DISTURBANCE
C110
C3 CONCRETE PAD ENLARGEMENT
1" = 10'
FEET
Scale: 1 INCH = 10 FEET
20100 5
SHEET NOTES
1. INSTALL CONCRETE SIDEWALK (REFER TO DETAIL F8/C800)
2. INSTALL TEMPORARY ELECTRIC CONCRETE PAD (REFER TO DETAIL C5/C800)
REFER TO CONCRETE PAD DETAIL FOR DIMENSIONS DENOTED WITH "*"
3. INSTALL CONCRETE JOINT (REFER TO DETAIL C8/C800)
N
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
SEATAC
WESTERN SERVICE AREA DES MOINES, WA
ENGINEERING
SERVICES
10/13/2023
SEATTLE AIRPORT TRAFFIC CONTROL TOWER
(SEA ATCT)
MAJOR MECHANICAL UPGRADE
S.BUTLERSEATTLE ATCT
SEATAC
WASHINGTON
S.BUTLER
D.TIRONA
SEA ATCT WA
ENROUTE
ARLINGTON, VA 22201
SUITE 500
1100 N GLEBE RD.
JACOBS
19001810
SEA - D - ATCT - C800
SITE DETAILS
NOTES:
1. PROVIDE CONTRACTION JOINT MINIMUM EVERY 5'-0" AND EXPANSION JOINT EVERY 30'-0"
OR MATCH JOINT SPACING OF ADJACENT EXISTING SIDEWALK.
2. SIDEWALK REMOVED MUST BE REMOVED IN ITS ENTIRETY, SAWCUT EXISTING SIDEWALK
AT NEAREST JOINT. COMPLETE SLAB MUST BE REPLACED AND PROVIDE JOINTS.
3. MATCH ADJACENT SIDEWALK IN-LINE AND GRADE.
4. JOINT EXPANSION MATERIAL ONLY REQUIRED WHERE SIDEWALK IS ADJACENT TO
CONCRETE CURB OR OTHER STRUCTURES.
SUBGRADE COMPACTED
95% STANDARD
PROCTOR
6x6 - W1.4 x W1.4 WWF
JOINT EXPANSION
EXISTING CURB
4" CONCRETE
C800
F8 CONCRETE SIDEWALK
NTS
ALIGN
DRILL &
GROUT /
EPOXY
2" DIA. SMOOTH BAR W/ CAP
18" LONG - DOWEL 18"O.C.
EXPANSION JOINT
MATERIAL
L
1/2L
NEW CONCRETE
SIDEWALK
EXISTING SIDEWALK
C800
F5 TRANSITION TO NEW SIDEWALK
NTS
4" AGGREGATE BASE
COURSE COMPACTED
TO 95%
EXISTING SIDEWALK
4"
NOTES:
1. MATCH EXISTING SIDEWALK SLOPE.
C800
C8 CONCRETE JOINT DETAILS
NTS
NOTES:
1. PROVIDE DEPTH OF SEALANT AS RECOMMENDED BY THE MANUFACTURER.
TOOLED CONTRACTION JOINT EXPANSION JOINT
JOINT SEALANT
1/8"R.
TYP.
DEPTH
1/2" C
O N
C . D
EP
TH
1/2" THICK
PREMOLDED
JOINT FILLER
1/8"R.
TYP.
3/16"
1/8"
MIN.
1" M
IN
F8 C800
C8 C800
C800
C5 TEMPORARY CONCRETE UTILITY PAD
NTS
NOTES:
1. COORDINATE SIZE & LOCATION WITH EQUIPMENT REQUIREMENTS.
2. CONCRETE COMPRESSIVE STRENGTH fc'= 5,000 psi, AIR ENTRAINED (A/E), AND 0.4 W/C RATIO.
3. CHAMFER EDGES 1" TYPICAL.
4. SIZE PAD FOR WIDTH OF EQUIPMENT PLUS 6" ALL SIDES.
5. CONDUIT SLEEVES TO BE INSTALLED PER MANUFACTURER'S SPECIFICATION FOR EQUIPMENT
#4 @ 12"
EW T&B 2"
8" AGGREGATE
BASE COURSE
8" 8"
PLAN DIMENSIONS & LOCATIONS
REF: CIVIL & ELEC DWGS
PAD FOUNDATION
REVEAL PER
EQUIPMENT
REQUIREMENTS
3"
3"
42931
BIN GE
S T
A T
E O
F WASHIN
G T
O N
S T
R U
C
TURAL ENG
IN
E
E
RP
R O
F
E
SSI ON A L E NG
IN
E
E R
THE STRUCTURAL DESIGN CONFORMS TO THE FOLLOWING CODES/STANDARDS:
1. ASCE/SEI 7–22 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES.
2. FAA AIR TRAFFIC ORGANIZATION TERMINAL FACILITIES DESIGN STANDARD VERSION 2.0, AUGUST 1, 2022.
3. IBC 2021 INTERNATIONAL BUILDING CODE, INTERNATIONAL CODE COUNCIL .
4. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION, 2016.
5. IEBC 2021, INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL CODE COUNCIL.
6. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY,
AMERICAN CONCRETE INSTITUTE, FIFTH PRINTING.
7. AISC 341-16, SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION.
8. AWS D1.1-20, STRUCTURAL WELDING CODE, AMERICAN WELDING SOCIETY.
1. CONCRETE DESIGN CONFORMS TO ACI 318–19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE.
2. PROVIDE MINIMUM 28-DAY COMPRESSIVE STRENGTHS IN COMPLIANCE WITH ACI 318-19 TABLE 19.3.2-1
PERFORMANCE CRITERIA OF EXPOSURE CLASS F3, S0, W1 AND C2:
A. FOUNDATIONS: 5000 PSI
3. ALL EXPOSED CORNERS OF CONCRETE SHALL HAVE A 3/4" CHAMFER.
4. COVER FOR CONCRETE REINFORCEMENT:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3 INCHES
B. EXPOSED TO EARTH OR WEATHER WHERE FORMS ARE USED: #6 AND LARGER, 2 INCHES; #5 AND
SMALLER 1-1/2 INCHES.
1. MATERIALS:
A. NUT & WASHER: COMPATIBLE WITH STUD MATERIAL & FINISH.
B. CARBON STEEL THREADED ROD: ISO 898 CLASS 5.8.
1. MECHANICAL ANCHORS AND THREADED INSERTS SHALL BE CARBON STEEL WITH ZINC PLATING IN ACCORDANCE WITH ASTM B 633,TYPE III Fe/Zn 5 (SC1), UNLESS NOTED OTHERWISE.
2. POST-INSTALLED ANCHORS MANUFACTURED BY HILTI, INC. ARE SPECIFIED AS A BASIS OF DESIGN AND
TO ESTABLISH THE DESIRED QUALITY AND PERFORMANCE OF THE WORK. OTHER APPROVED
MANUFACTURERS ARE:
A. SIMPSON STRONG TIE.
B. POWERS FASTENERS.
3. ANCHORING TO CONCRETE: TYPE AND SIZE AS INDICATED.
A. MECHANICAL ANCHORS:
a. MECHANICAL ANCHORS USED IN CONCRETE SHALL HAVE BEEN TESTED AND PREQUALIFIED FOR
PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2 AND
ICC-ES AC193, INCLUDING SEISMIC SHEAR AND TENSION.
b. TORQUE CONTROLLED EXPANSION ANCHORS NOT PERMITTED.
B. ADHESIVE ANCHORS:
a. ANCHORS CONSISTING OF AN INSERT AND CARTRIDGE TYPE, TWO COMPONENT, EPOXY OR
HYBRID ADHESIVE DISPENSED AND MIXED THROUGH A STATIC MIXING NOZZLE PROVIDED BY
THE ADHESIVE MANUFACTURER.
b. ADHESIVE SHALL HAVE BEEN TESTED AND PREQUALIFIED FOR PERFORMANCE IN CRACKED AND
UNCRACKED CONCRETE IN ACCORDANCE WITH ICC-ES AC308, INCLUDING SEISMIC SHEAR &
TENSION, HORIZONTAL AND OVERHEAD INSTALLATIONS, AND LONG TERM CREEP.
4. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING HOLES
FOR ANCHORS. EXERCISE CARE IN DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR
EMBEDDED ITEMS. STOP DRILLING AND NOTIFY THE COR IF REINFORCING STEEL OR OTHER EMBEDDED
ITEMS ARE ENCOUNTERED DURING DRILLING.
5. INSTALL ANCHORS IN DRY HOLES IN ACCORDANCE WITH MANUFACTURER’S PRINTED INSTRUCTIONS.
EMBED ANCHORS INTO THE SUBSTRATE AS INDICATED IN THE POST-INSTALLED ANCHOR SCHEDULE
UON.
DESIGN CRITERIA
EXISTING CONSTRUCTION
1. INFORMATION SHOWN ON THESE DRAWINGS RELATING TO EXISTING CONSTRUCTION IS BASED ON
THE FOLLOWING DRAWINGS. THE INFORMATION IS DEEMED RELIABLE BUT ACTUAL FIELD
CONDITIONS MAY VARY. NOTIFY THE COR IN WRITING OF DISCREPANCIES BEFORE PROCEEDING
WITH THE WORK.
A. AIR TRAFFIC CONTROL TOWER - SEATAC, WA, URS FACILITIES GROUP. 30 JULY 1999.
2. REFERENCE DATUM 0'-0" IS ESTABLISHED AS TOP OF EXISTING GROUND FLOOR FINISHED FLOOR
ELEVATION.
CONSTRUCTION REQUIREMENTS
1. REVIEW AND VERIFY AS-BUILT CONDITIONS AND ACTUAL EQUIPMENT DIMENSIONS USING APPROVED
MANUFACTURER/VENDOR DRAWINGS PRIOR TO SUBMISSION OF STRUCTURAL STEEL SHOP
DRAWINGS. DIMENSIONS ARE BASED ON AS-BUILT DOCUMENTS AND LIMITED FIELD MEASUREMENTS.
VERIFY MEASUREMENTS PRIOR TO FABRICATION OF ELEMENTS AND NOTIFY THE COR OF
DIMENSIONAL VARIANCES.
2. REVIEW AND VERIFY LOCATION OF INSERTS, OPENINGS, SLEEVES, FINISHES, DEPRESSIONS, PADS, AND WALL OPENINGS. COORDINATE WITH OTHER DISCIPLINE SHEETS.
3. DO NOT SCALE DRAWINGS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS.
4. CUT NO HOLES IN STRUCTURAL MEMBERS WITHOUT WRITTEN APPROVAL FROM THE SEOR.
5. PROTECT EXISTING AND NEW UTILITIES, STRUCTURAL MEMBERS, FINISHES, ETC. ASSUME FULL
RESPONSIBILITY FOR DAMAGE DURING CONSTRUCTION. RESTORE DAMAGED AREAS TO THE
SATISFACTION OF THE COR, AT NO COST TO THE GOVERNMENT.
6. DETAILS LABELED "TYPICAL" OR SHOWN ON S500 OR ST500 SERIES SHEETS APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED.
SUCH DETAILS APPLY WHETHER OR NOT DETAILS ARE REFERENCED AT EACH LOCATION. NOTIFY COR
OF CONFLICTS REGARDING APPLICABILITY OF TYPICAL DETAILS.
7. DO NOT LOAD THE SLAB-ON-GROUND OR ROOF WITH ERECTION EQUIPMENT. THE SLABS HAVE NOT
BEEN DESIGNED FOR THESE LOADS. IF SUPPORT IS REQUIRED, OBTAIN COR APPROVAL OF
PROPOSED SUPPORT PLAN FOR SLABS PRIOR TO COMMENCING WORK.
8. DO NOT STORE OR STACK CONSTRUCTION MATERIALS ON ROOFS IN EXCESS OF 80 PERCENT OF LIVE
LOAD AS SPECIFIED HEREIN. ENSURE SUB-CONTRACTORS ARE INFORMED OF LOADING
RESTRICTIONS. AVOID IMPACT WHEN PLACING MATERIALS ON ROOF.
9. THE CONTRACT STRUCTURAL DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THE
CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION. PROVIDE
MEASURES REQUIRED TO PROTECT THE STRUCTURE, WORKMEN, AND OTHER PERSONS DURING
CONSTRUCTION; INCLUDING BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR THE
BUILDING, FORMS AND SCAFFOLDING, SHORING OF RETAINING WALLS AND OTHER TEMPORARY
SUPPORTS AS REQUIRED.
10. EXAMINE OTHER DISCIPLINE DRAWINGS FOR REQUIRED OPENINGS AND PROVIDE STRENGTHENING AS
REQUIRED AROUND OPENINGS GREATER THAN 4" IN DIAMETER WHETHER SHOWN ON THE
STRUCTURAL DRAWINGS OR NOT.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .