Renovate Bldg 254 Squadron Operations at 185ARW

Closed Solicitation Posted

Solicitation number
W912LP21B0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Sioux City, Iowa 51111, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks renovation services for Building 254 at the 185th Air Refueling Wing in Sioux City, Iowa. The United States Property and Fiscal Office for Iowa intends to award a single firm fixed-price contract to provide all labor, materials, equipment, and supervision necessary to renovate approximately 31,699 square feet of an existing squadron operations facility. Renovations include upgrading office spaces, classrooms, restrooms, locker rooms, common areas, and storage spaces. The contract duration is 365 days after notice to proceed, with responses due by August 5, 2021.

The solicitation is a 100% small business set-aside under NAICS 236220 with a budget between $5,000,000 to $10,000,000. The opportunity is reserved for small businesses to provide construction services at the 185th Air Refueling Wing in Sioux City, Iowa. Key details include upgrading approximately 1,600 square feet to sensitive compartmented information facility standards and replacing the HVAC system. The place of performance is Building 254 at the 185th Air Refueling Wing in Sioux City, Iowa.

Notice text

13 versions

Update #13 · Latest ·

Abstract of Offers uploaded to Attachments 8/6/2021.

REMINDER TO BIDDERS:  Bids must include acknowledgement of ALL solicitation amendments.

Amendment 0007 incorporates FEH Addendum #005 to the plans and specifications. See W912LP-21-B-0001-0007 for SF30. See Attachment 10 for Addendum #005.

Questions and Answers v7 - FINAL uploaded to Attachments 8/3/2021. 

Amendment 0006 incorporates FEH Addendum #004 to the plans and specifications. See W912LP-21-B-0001-0006 for SF30. See Attachment 9 for Addendum #004.

Questions and Answers v6 uploaded to Attachment 8/2/2021.

Questions and Answers v5 uploaded to Attachments 7/30/2021. 

Attachments 1a - 1d, 2a-2c, 6, 7 and 8  re-uploaded.

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

W912LP-21-B-0001_Attachment_7_7013008.11 Sq Ops Bldg 254 - Addendum #003

W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout

W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004

W912LP-21-B-0001_Attachment_10_2013008.11 Sqd Ops Bldg 254 - Addendum #005

Update #12 ·

REMINDER TO BIDDERS:  Bids must include acknowledgement of ALL solicitation amendments.

Amendment 0007 incorporates FEH Addendum #005 to the plans and specifications. See W912LP-21-B-0001-0007 for SF30. See Attachment 10 for Addendum #005.

Questions and Answers v7 - FINAL uploaded to Attachments 8/3/2021. 

Amendment 0006 incorporates FEH Addendum #004 to the plans and specifications. See W912LP-21-B-0001-0006 for SF30. See Attachment 9 for Addendum #004.

Questions and Answers v6 uploaded to Attachment 8/2/2021.

Questions and Answers v5 uploaded to Attachments 7/30/2021. 

Attachments 1a - 1d, 2a-2c, 6, 7 and 8  re-uploaded.

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

W912LP-21-B-0001_Attachment_7_7013008.11 Sq Ops Bldg 254 - Addendum #003

W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout

W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004

W912LP-21-B-0001_Attachment_10_2013008.11 Sqd Ops Bldg 254 - Addendum #005

Update #11 ·

REMINDER TO BIDDERS:  Bids must include acknowledgement of ALL solicitation amendments.

Amendment 0006 incorporates FEH Addendum #004 to the plans and specifications. See W912LP-21-B-0006 for SF30. See Attachment 9 for Addendum #004.

Questions and Answers v6 uploaded to Attachment 8/2/2021.

Questions and Answers v5 uploaded to Attachments 7/30/2021. 

Attachments 1a - 1d, 2a-2c, 6, 7 and 8  re-uploaded.

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

W912LP-21-B-0001_Attachment_7_7013008.11 Sq Ops Bldg 254 - Addendum #003

W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout

W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004

Update #10 ·

Questions and Answers v5 uploaded to Attachments 7/30/2021. 

Attachments 1a - 1d, 2a-2c, 6, 7 and 8  re-uploaded.

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

W912LP-21-B-0001_Attachment_7_7013008.11 Sq Ops Bldg 254 - Addendum #003

W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout

Update #9 ·

Attachments 1a - 1d, 2a-2c, 6, 7 and 8  re-uploaded.

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

Update #8 ·

Amendment 0005 Incorporates FEH Addendum #003 to the plans and specifications. See W912LP-21-B-0005 for SF30. See Attachment 7 for Addendum #003.

Questions and Answers v4 uploaded to Attachments 7/28/2021

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

Update #7 ·

Amendment 0004 corrects FAR 52.236-1, Performance of Work by the Contractor. Percentage is changed from 50% to 15%. See W912LP-21-B-0001-0004 for SF30.

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

Update #6 ·

Questions and Answers v3 uploaded to Attachments 7/26/2021

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

Update #5 ·

Amendment 0003 incorporates FEH Addendum #002 to the plans and specifications. See W912LP-21-B-0001-0003 for SF30. See Attachment 6 for Addendum #0002.

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS

W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21

Update #4 ·

Questions and Answers v2 uploaded to Attachments 7/21/2021

Pre-Bid Conference Minutes uploaded to Attachments 7/21/2021

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

Update #3 ·

Amendment 0002 incorporates updated Wage Determination, IA20210077 dated 07/09/2021. See W912LP-21-B-0001-0002 for SF30.

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

Update #2 ·

Amendment 0001 incorporates Questions and Answers v1. See W912LP-21-B-0001-0001 for SF30. 

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

Update #1 ·

The USPFO for Iowa Purchasing & Contracting Office intends to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to Renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing (ARW), Iowa Air National Guard Base, Sioux City, Iowa.. Renovation shall be for a 31,699 SF facility. Renovation shall include the following items: Renovate the existing Squadron Operations facility, Building 254, by renovating office spaces, classrooms, restrooms, locker rooms, common areas, secure areas, and storage spaces. Upgrade 1,600 SF within Command Post and Squadron Operations areas to sensitive compartmented information facility (SCIF) standards. Replace existing HVAC system with a more reliable and efficient system. Upgrade existing electrical panels to support the requirements for the Global Aircrew Strategic Network Terminal (Global ASNT). Upgrade building electrical, windows/doors, communications systems, entry/exit pavement, building parking, plumbing, and sewer systems as needed. Install fire suppression/alarm system, fire water main, and mass notification system. Construct 2,300 SF dual use Alert Facility space using existing Squadron Operations square footage. Provide supporting facilities to accommodate the renovation. Tuckpoint as needed, paint building exterior, upgrade building siding where needed, restore entryway canopies. Provide temporary facilities to house building occupants during construction. Global ASNT: This project will also repair rooms 01, 02, 03, 04 and 05 in building 254 for Global ASNT. Install separate 2-ton HVAC system to sufficiently cool the interior spaces.  Provide electrical conduits to support electrical and communication cables from antenna dish to communication hub and from panel to PDSC; provide conduits for cables in plenum locations within existing vault area. Demolish existing parachute drying tower and install rooftop structure to house Global ASNT communications antenna.  Install exterior concrete pad to support operation of Global ASNT Transportable unit.

The contract duration is 365 days after notice to proceed.

The magnitude of construction is between $5,000,000 and $10,000,000.

Corbin Russwin locks and keying systems are brand name specific due to compatibility with existing systems currently in use at the 185th ARW. Justification is attached.

See W912LP-21-B-0001_Project VSSB192001 and Attachments:

W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans

W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13

W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23

W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33

W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct

W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP

W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil

W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted

W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request

Files

File Type Posted
W912LP-21-B-0001_OF 1419 Abstract of Offers - Construction.pdf PDF
Questions and Answers v7 - FINAL.pdf PDF
W912LP-21-B-0001-0007.pdf PDF
W912LP-21-B-0001_Attachment_10_2013008.11 Sqd Ops Bldg 254 - Addendum #005.pdf PDF
Questions and Answers v6.pdf PDF
W912LP-21-B-0001-0006.pdf PDF
W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004.pdf PDF
Questions and Answers v5.pdf PDF
W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_7_2013008.11 Sqd Ops Bldg 254 - Addendum #003_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans_re-upload.pdf PDF
Questions and Answers v4.pdf PDF
W912LP-21-B-0001-0005.pdf PDF
W912LP-21-B-0001-0004.pdf PDF
Questions and Answers v3.pdf PDF
VSSB192001 Pre-bid Conference Minutes.pdf PDF
W912LP-21-B-0001-0003.pdf PDF
Questions and Answers v2.pdf PDF
VSSB192001 Pre-bid Conference Slides.pdf PDF
W912LP-21-B-0001-0002.pdf PDF
W912LP-21-B-0001-0001.pdf PDF
Questions and Answers v1.pdf PDF
W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS.pdf PDF
W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request.pdf PDF
W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted.pdf PDF
W912LP-21-B-0001_Project_VSSB192001.pdf PDF
Show all 33

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Renovate Bldg 254 Squadron Operations at 185ARW Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity