This solicitation is for a firm fixed-price construction contract to renovate Building 254 at the 185th Air Refueling Wing (ARW) Iowa Air National Guard Base in Sioux City, Iowa. The renovation scope includes upgrading office, classroom, restroom, locker room, and storage spaces; expanding secure areas to SCIF standards; replacing HVAC systems; upgrading electrical and communications systems; improving windows, doors, plumbing, and sewer infrastructure; installing fire suppression and mass notification systems; constructing an alert facility; and providing temporary facilities for occupants during construction. Additional work involves repairing rooms for a Global ASNT and installing supporting exterior structures and utility connections. The contract duration is 365 days with a magnitude between $5,000,000 to $10,000,000. Corbin Russwin locks are brand specific due to compatibility with existing base systems. Accompanying documents include building plans, specifications, AF forms addressing architectural, MEP, and civil scopes, and justifications for brand-specific procurement.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
DIVISIONS 21 - 23
PART 2 0F 3
VSSB192001
DESIGN
FOR
RENOVATE SQUAD OPS, BUILDING 254
IOWA AIR NATIONAL GUARD
Sioux City, Iowa 25 March 2021
BID DOCUMENTS SUBMITTAL
(This Page Intentionally Left Blank)
PROJECT MANUAL
OWNER’S PROJECT NO.: VSSB192001
ARCHITECT’S PROJECT NO.: 2013008.11
GENERAL CONTRACT
DESIGN FOR RENOVATE SQUAD OPS - BUILDING 254
IOWA AIR NATIONAL GUARD, SIOUX CITY, IOWA
ARCHITECT: FEH DESIGN
1201 4th Street Suite 201
Sioux City, Iowa 51101
(712) 252-3889
MECHANICAL, FIRE PROTECTION &
ELECTRICAL ENGINEER:
Farris Engineering, Inc.
12700 West Dodge Road Omaha, NE 68154
402-330-5900
STRUCTURAL ENGINEER: FEH DESIGN
1201 4th Street
Suite 201 Sioux City, Iowa 51101
(712) 252-3889
CIVIL ENGINEER: VEENSTRA & KIM INC.
203 Sergeant Square Dr.
Sergeant Bluff, IA 51054
(712) 943-5055
COMMISSIONING AGENT:
Systems Works, LLC
West Des Moines, IA 50265
(515) 975-2220
SUSTAINABLE DESIGN: C-Wise Design & Consultant
906 S 7th Ave Iowa City, IA 52240
(319) 621.4168
RENOVATE SQUAD OPS PAGE 1 OF 5 TABLE OF CONTENTS
BUILDING 254
DESIGN FOR SQUADRON OPERATIONS - BUILDING 254
IOWA AIR NATIONAL GUARD
ANG BASE, SIOUX GATEWAY AIRPORT
BG BUD DAY FIELD
SIOUX CITY, IOWA
PROJECT NO.: VSSB192001
ARCHITECT'S FILE NO.: 2013008.11
TABLE OF CONTENTS
SECTION TITLE
00 00 05 TABLE OF CONTENTS
00 01 05 CERTIFICATIONS (DESIGNERS OF RECORD)
DIVISION 1 GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 10 10 SPECIAL LABOR & WORK CONSIDERATIONS
01 25 00 SUBSTITUTION PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 33 05 ELECTRONIC SUBMITTAL PROCEDURES
01 33 29 SUSTAINABLE DESIGN REPORTING
01 33 29.01 SUSTAINABLE CONTENT FORM
01 35 47 LOW EMITTING MATERIALS REQUIREMENTS
01 35 66 GPA CREDIT SUMMARY
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 44 33 CODE REQUIRED SPECIAL INSPECTIONS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 5010 TEMPORARY OWNER TRAILER FACILITIES
01 57 21 INDOOR AIR QUALITY CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 61 20 HAZARDOUS MATERIAL USAGE
01 73 00 EXECUTION
01 74 19 CONSTRUCTION WASTE MANAGEMENT & DISPOSAL
01 74 25 RECOVERED MATERIALS
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
01 91 13 COMMISSIONING REQUIREMENTS
01 91 13.01 COMMISSIONING PLAN
DIVISION 2 EXISTING REQUIREMENTS
02 41 19 SELECTIVE STRUCTURE DEMOLITION
RENOVATE SQUAD OPS PAGE 2 OF 5 TABLE OF CONTENTS
DIVISION 3 CONCRETE
03 05 16 UNDER SLAB VAPOR BARRIER
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 ARCHITECTURAL PRE-CAST CONCRETE
03 41 00 PRE-CAST STRUCTURAL CONCRETE
DIVISION 4 MASONRY
040120.63 BRICK MASONRY REPAIR & CLEANING
040120.64 BRICK MASONRY REPOINTING
04 20 00 UNIT MASONRY
DIVISION 5 METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 21 00 STEEL JOISTS
05 31 00 STEEL DECKING
05 50 00 METAL FABRICATIONS
05 51 13 METAL PAN STAIRS & METAL RAILINGS
05 70 00 DECORATIVE METAL PLATE
DIVISION 6 WOOD, PLASTIC & COMPOSITES
06 10 53 MISCELLANEOUS ROUGH CARPENTRY
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
06 40 25 COMPOSITE WALL PANEL SYSTEM
06 64 00 PLASTIC PANELING
DIVISION 7 THERMAL & MOISTURE PROTECTION
07 21 00 THERMAL INSULATION
07 21 19 FOAMED-IN-PLACE INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER
07 54 23 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
07 62 00 SHEET METAL FLASHING & TRIM
07 72 00 ROOF ACCESSORIES
07 84 13 PENETRATION FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 8 OPENINGS
08 11 13 HOLLOW METAL DOORS & FRAMES
08 14 16 FLUSH WOOD DOORS
08 34 73 METAL SOUND CONTROL DOOR ASSEMBLY
08 35 13 FOLDING ACCORDION DOORS
08 36 10 SECTIONAL OVERHEAD DOORS
08 41 13 ALUMINUM FRAMED ENTRANCES & STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 83 00 MIRRORS
DIVISION 9 FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING
RENOVATE SQUAD OPS PAGE 3 OF 5 TABLE OF CONTENTS
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 54 42 SUSPENDED DECORATIVE ACOUSTICAL PANELS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 19 RESILIENT TILE FLOORING
09 67 23 RESINOUS EPOXY FLOORING
09 68 13 TILE CARPETING
09 68 16 SHEET CARPETING
09 69 00 ACCESS FLOORING
09 72 00 WALL COVERINGS
09 84 33 SOUND-ABSORBING WALL UNITS
09 91 23 INTERIOR PAINTING
09 96 00 HIGH PERFORMANCE COATINGS
DIVISION 10 SPECIALTIES
10 11 46 VISUAL DISPLAY FABRICS
10 14 00 SIGNAGE
10 14 19 DIMENSIONAL LETTER SIGNAGE
10 16 00 VINYL GRAPHICS
10 21 13 PHENOLIC CORE TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 00 TOILET & BATH ACCESSORIES
10 44 13 FIRE EXTINGUISHER CABINETS
10 50 50 METAL LOCKERS
10 51 23 PLASTIC-LAMINATE-CLAD LOCKERS
10 55 00 POSTAL SPECIALTIES
10 56 26 MOBILE STORAGE SHELVING
10 71 13 EXTERIOR SUN CONTROL DEVICES
DIVISION 11 EQUIPMENT
11 18 10 KEY BOX
11 20 00 DAVIT CRANE
11 52 13 PROJECTION SCREENS
DIVISION 12 FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 35 54 PRE-MANUFACTURED METAL CABINETS
12 36 61 SIMULATED STONE COUNTERTOPS
12 61 00 FIXED AUDIENCE SEATING
DIVISION 13 SPECIAL SYSTEMS
13 09 50 RF FOIL PROTECTION BARRIERS
DIVISION 14 CONVEYING EQUIPMENT
NONE
DIVISION 21 FIRE PROTECTIONS
21 00 00 FIRE PROTECTION GENERAL PROVISIONS
21 05 00 FIRE PROTECTION
RENOVATE SQUAD OPS PAGE 4 OF 5 TABLE OF CONTENTS
DIVISION 22 PLUMBING
22 00 00 PLUMBING GENERAL PROVISIONS
22 00 10 PLUMBING SUBMITTALS
22 05 00 COMMON PLUMBING MATERIALS AND REQUIREMENTS
22 07 00 PLUMBING INSULATION
22 11 16 PLUMBING PIPING
22 11 19 PLUMBING SPECIALTIES
22 11 23 PLUMBING PUMPS
22 15 00 AIR COMPRESSORS AND COMPRESSED AIR PIPING
22 33 00 DOMESTIC WATER HEATERS
22 40 00 PLUMBING FIXTURES
DIVISION 23 MECHANICAL
23 00 00 HVAC GENERAL PROVISIONS
23 00 10 MECHANICAL SUBMITTALS
23 01 34 INDOOR AIR QUALITY
23 05 00 COMMON HVAC MATERIALS AND REQUIREMENTS
23 05 93 HVAC TESTING, ADJUSTING AND BALANCING
23 07 00 HVAC INSULATION
23 08 00 COMMISSIONING OF HVAC SYSTEMS
23 09 05 BUILDING MANAGEMENT AND CONTROL SYSTEMS
23 09 33 VARIABLE FREQUENCY DRIVES
23 09 93 SEQUENCE OF OPERATION
23 20 00 HYDRONIC PUMPS
23 21 13 HYDRONIC PIPING AND SPECIALTIES
23 23 00 REFRIGERANT PIPING AND SPECIALTIES
23 25 00 HYDRONIC SYSTEMS CLEANING AND TREATMENT
23 30 00 AIR DISTRIBUTION
23 31 13 METAL DUCTS
23 34 00 FANS AND VENTILATORS
23 52 16 CONDENSING BOILERS AND ACCESSORIES
23 65 00 COOLING TOWER AND ACCESSORIES
23 72 00 AIR TO AIR RECOVERY EQUIPMENT
23 81 26 DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS
23 81 46 WATER SOURCE HEAT PUMPS
DIVISION 26 ELECTRICAL
26 05 00 GENERAL ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLING
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGARS & SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS & BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73.13 SHORT-CIRCUIT STUDIES
26 05 73.19 ARC-FLASH HAZARD ANALYSIS
26 09 23 LIGHTING CONTROL DEVICES
26 22 13 LOW VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
RENOVATE SQUAD OPS PAGE 5 OF 5 TABLE OF CONTENTS
26 25 50 GENERATOR DOCKING SYSTEM
26 27 13 ELECTRICITY METERING
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 32 13 PACKAGED ENGINE GENERATOR SYSTEM
26 36 00 TRANSFER SWITCHES
26 41 13 LIGHTING PROTECTION FOR STRUCTURES
26 51 19 LED INTERIOR LIGHTING
26 52 13 EMERGENCY AND EXIT LIGHTING
26 56 19 LED EXTERIOR LIGHTING
DIVISION 27 COMMUNICATIONS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATION SYSTEMS
27 11 16 COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES
DIVISION 28 ELECTRONIC SAFETY, & SECURITY
28 46 21.11 FIRE ALARM SYSTEMS
28 47 00 MASS NOTIFICATION SYSTEMS
DIVISION 31 EARTHWORK
31 10 00 SITE CLEARING
31 23 33 TRENCHING & BACKFILLING
DIVISION 32 EXTERIOR IMPROVEMENTS
32 05 13 SOILS FOR EXTERIOR IMPROVEMENTS
32 05 16 AGGREGATES FOR EXTERIOR IMPROVEMENTS
32 13 13 CONCRETE PAVING
32 13 73 CONCRETE PAVING JOINT SEALANTS
32 17 23 PAVEMENT MARKINGS
32 17 26 TACTILE WARNING SURFACE
32 31 00 CHAIN LINK FENCING AND GATES
32 92 00 TURF AND GRASSES
DIVISION 33 UTILITIES
33 05 13 MANHOLES AND STRUCTURES
33 11 16 SITE WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE UTILITIES
ricks Text Box
B3 Submittal
Renovate Squad OPS Page 1 of 11 FIRE PROTECTION Building 254 GENERAL PROVISIONS 21 00 00 (202018) 2021 by FEI
SECTION 21 00 00 - FIRE PROTECTION GENERAL PROVISIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SECTION INCLUDES
A. Pipe, fittings, valves, and connections for sprinkler systems.
1.3 RELATED SECTIONS
A. Section 22 05 00 – Common Plumbing Materials and Requirements.
B. Section 23 05 00 – Common HVAC Materials and Requirements.
1.4 REFERENCES
A. ASME (BPV IX) – Boiler and Pressure Vessel Code, Section IX – Welding and Brazing Qualifications;
The American Society of Mechanical Engineers; 1998.
B. ASME B16.1 – Cast Iron Pipe Flanges and Flanged Fittings; The American Society of Mechanical Engineers; 1998.
C. ASME B16.3 – Malleable Iron Threaded Fittings; The American Society of Mechanical Engineers;
1998.
D. ASME B16.4 – Gray Iron Threaded Fittings; The American Society of Mechanical Engineers; 1999.
E. ASME B16.9 – Factory-made Wrought Steel Buttwelding Fittings; The American Society of Mechanical Engineers; 1993.
F. ASME B16.18 – Cast Copper Alloy Solder Joint Pressure Fittings; The American Society of Mechanical Engineers; 1984, Reaffirmed 1994 (ANSI B16.18).
G. ASTM A 47/A 47M – Standard Specification for Ferritic Malleable Iron Castings; 1999.
H. ASTM A 53/A 53M – Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2000.
I. ASTM A 795 – Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use; 2000.
Renovate Squad OPS Page 2 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
J. AWS A5.8 – Specification for Filler Metals for Brazing and Braze Welding; American Welding Society;
1992.
K. AWWA C110 – American National Standard for Ductile-Iron and Gray-Iron Fittings, 3 In. Through 48 In. (75 mm Through 1200 mm), for Water and Other Liquids; American Water Works Association, 1998.
L. AWWA C111/A21.11 – Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings; American Water Works Association; 1995 (ANSI/AWWA C111/A21.11).
M. AWWA C151/A21.51 – Ductile-Iron Pipe, Centrifugally Cast, for Water; American Water works Association; 1996 (ANSI/AWWA C151/A21.51).
N. NFPA 13 – Standard for the Installation of Sprinkler Systems; National Fire Protection Association;
Current State Adopted Edition.
O. UL (FPED) – Fire Protection Equipment Directory; Underwriters Laboratories Inc.; Current Edition.
P. UL 262 – Gate Valves for Fire-Protection Service; Underwriters Laboratories Inc.; Current Edition.
Q. UL 312 – Check Valves for Fire-Protection Service; Underwriters Laboratories Inc.; Current Edition.
R. UFC 3-600-01; Unified Facilities Criteria (UFC) Fire Protection Engineering for Facilities; Change 4, 7 February 2020.
1.5 SUBMITTALS
A. Product Data: Provide manufacturers catalogue information. When more than one (1) model, size, finish, accessory, etc. are provided on a single vendor’s catalog cut sheet, mark or highlight all that apply and/or mark through all that do not apply. Highlighting not required for pipe and pipe fittings.
B. Shop Drawings: Provide shop drawing that is in compliance with the “Working Drawings” description in NFPA 13. Indicate pipe materials used, jointing methods, supports, and floor and wall penetration seals. Indicate installation, layout, pipe elevations, pipe sizes, mounting and support details, piping connections, all ceiling devices and all exposed obstructions. If more than one pipe material is being used, shop drawing shall provide unique line types (color or line style) to indicate each material type.
Provide detailed symbols legend for all symbols used on drawing. Drawings shall be provided using computerized drafting. Hand drawings shall not be permitted. Drawings shall not be created from PDF’s or have PDF’s imbedded with the CAD files.
C. Project Record Documents: Record actual locations of components and tag numbering.
D. Operation and Maintenance Data: Prepare and submit operation and maintenance instructions for all fire sprinkler data, quantity and delivery method as defined in Division 01. Each manual shall be tabbed with tabs for: product data, include installation instructions and spare parts lists; warranties;
testing certifications, include both above ground piping and underground piping certifications; final hydraulic calculations; “AS BUILT” drawings folded and placed in plastic pouches with holes for insertion into a three-ring binder; and system maintenance requirements. Include contact information for emergency response. As with original submittal, product data shall be marked to reflect marked, model, size and finish(es) used on project.
Renovate Squad OPS Page 3 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
1. Content: Operations and maintenance manual content is specified in individual Specification Sections to be reviewed at the time of Section submittals. Submit reviewed content formatted and organized as required by this Section. Engineer will comment on content of operations and maintenance submittals and indicate where revisions or re-submittals are required. Clarify and update reviewed content to correspond to revisions and field conditions.
2. Organization: Organize each manual into tabbed sections as noted above. Manual shall contain the following materials, in the order listed:
a. Title Page, including name and address of project and Owner, and contact information for Contractor, Construction Manager and Architect.
b. Table of Contents, including each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.
c. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.
d. Electronic Files: Use electronic files prepared by manufacturer where available.
Where scanning of paper documents is required, configure scanned file for minimum readable file size.
3. Format: Assemble each manual into a composite electronically indexed file. Submit on digital media acceptable to Architect/Engineer. Name each indexed document file in composite electronic index with applicable item name. Include a complete electronically linked operation and maintenance directory. Enable inserted reviewers’ comments on draft submittals.
1.6 QUALITY ASSURANCE
A. Conform to UL and FM requirements.
B. Valves: Bear UL label or marking. Provide manufacturer’s name and pressure rating marked on valve body.
C. Products Requiring Electrical Connection: Listed and classified as suitable for the purpose specified and indicated.
1.7 AUTOCAD DRAWING FILE REQUESTS
A. As an instrument of service to aid in Shop Drawing Submittals, Farris Engineering (FEI) will provide AutoCAD drawing files upon request. The files will be sent upon return receipt of the "Request for Drawings" agreement signed by an officer of the requesting firm. FEI does not assure that the drawings represent all changes, addenda items, change orders or modifications that may have occurred. The drawings are simply a tool for use in producing shop drawing submittals.
Renovate Squad OPS Page 4 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
B. The drawing files will be "cleaned-up" by having the FEI logo, Professional Engineer seal, and all extraneous notes and details removed. FEI must be compensated for this additional service by the requesting firm. A minimum fee of $400.00 for up to eight (8) sheets and $50.00 per sheet for each additional requested drawing will be invoiced to the requesting firm once the signed agreement is received.
1.8 DELIVERY, STORAGE AND PROTECTION
A. Deliver and store valves and sprinklers in shipping containers, with labeling in place.
B. Extreme care shall be exercised by the Contractor to prevent dirt and other foreign matter from entering pipe or components of system during construction. Pipe stored outside on the site of the project shall have open ends capped and equipment shall have all openings fully protected. Before erection, each piece of pipe, fitting or valve shall be visually examined and all dirt removed. Note, CPVC piping and pipe materials shall not be stored outside.
C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.
1.9 EXTRA MATERIALS
A. Provide NFPA 13 required quantity of spare stock of sprinklers and provide two (2) spare sprinkler wrenches and any other specialty wrench necessary to provide maintenance on the system for each size/style used on the project.
PART 2 - PRODUCTS
2.1 GENERAL SYSTEM AND PRODUCT REQUIREMENTS
A. Sprinkler Systems: Conform work to NFPA 13.
B. Welding Materials and Procedures: Conform to ASME Code.
2.2 PIPE HANGERS AND SUPPORTS
A. Hangers for Pipe Sizes 1/2 to 3 inch: Carbon steel, adjustable swivel, split ring.
B. Hangers for Pipe Sizes Over 3 inches: Carbon Steel, adjustable, clevis.
C. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.
D. Wall Support for Pipe Sizes to 3 inches: Cast iron hook.
E. Wall Support for Pipe Sizes 4 inches and Over: Welded steel bracket and wrought steel clamp.
F. Vertical Support: Steel riser clamp.
Renovate Squad OPS Page 5 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
G. Floor Support: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
2.3 CONTROL VALVE AND GATE VALVE
A. All manually operated sprinkler control valves and gate valves shall be outside stem and yoke (OS&Y) type and shall be listed in UL Builders Materials Directory or FM Approved Guide.
2.4 CHECK VALVES
A. 4 inches and Over:
1. Iron body, bronze disc, stainless steel spring, resilient seal, threaded, wafer, or flanged ends.
2.5 DRAIN VALVES
A. Compression Stop:
1. Bronze with hose thread nipple and cap.
B. Ball Valve:
1. Brass with cap and chain, 3/4 inch hose thread.
PART 3 - EXECUTION
3.1 PREPARATION
A. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe.
B. Remove scale and foreign material, from inside and outside, before assembly.
C. Prepare piping connections to equipment with flanges or unions.
3.2 INSTALLATION
A. Install sprinkler system and service main piping, hangers, and supports in accordance with NFPA 13.
B. Route wet piping in orderly manner, plumb and parallel to building structure. Maintain gradient.
C. Install all dry piping properly sloped to drain. Locate drum drips in warm locations. Coordinate location with A/E such that drum drips are in aesthetically pleasing locations.
D. Install piping to conserve building space, to not interfere with use of space and other work.
Renovate Squad OPS Page 6 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
E. Install components having pressure rating equal to or greater than system operating pressure.
F. Install piping in concealed locations, except in equipment rooms and service areas where ceilings are not provided.
G. Install piping free of sags and bends.
H. Install exposed piping at right angles or parallel to building walls. Diagonal runs are prohibited, except where indicated. Rolling offsets are prohibited.
I. Install piping tight to slabs, beams, joists, columns, walls, and other building elements. Allow sufficient space above removable ceiling panels to allow for ceiling panel removal.
J. Group piping whenever practical at common elevations.
K. Sleeve pipes passing through partitions, walls, and floors.
L. All sprinkler pipe welding shall be conducted in a controlled shop environment using weld-o-lets for all branch take-offs. Upon completion of pipe welds, scrape, brush, clean and apply one (1) coat of zinc rich primer to all pipe welds.
M. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment.
N. Inserts:
1. Provide inserts for placement in concrete formwork.
2. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.
3. Provide hooked rod to concrete reinforcement section for inserts carrying pipe over 4 inches.
4. Where concrete slabs form finished ceiling, locate inserts flush with slab surface.
5. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut recessed into and grouted flush with slab.
O. Pipe Hangers and Supports:
1. General: Install hangers, supports, clamps and attachments to support piping properly from building structure; comply with MSS SP-69. Install support with maximum spacing complying with MSS SP-69. Do not use wire or perforated metal to support piping, and do not support piping from other piping. Piping shall not be support from bottom cord of bar joist or from metal roof deck, unless approved by Structural Engineer. Piping may be supported at panel points of bar joists.
2. Install in accordance with NFPA 13 as modified by UFC 3-600-01.
3. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work.
4. Place hangers within 12 inches of each horizontal elbow.
Renovate Squad OPS Page 7 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
5. Use hangers with 1-1/2 inch minimum vertical adjustment. Design hangers for pipe movement without disengagement of supported pipe.
6. Support vertical piping at every other floor. Support riser piping independently of connected horizontal piping.
P. Prepare pipe, fittings, supports, and accessories for finish painting. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding.
Q. Do not penetrate building structural members unless specifically indicated on contract drawings.
R. Sleeves are not required for core drilled holes.
S. Permanent sleeves are not required for holes formed by PE plastic (removable) sleeves.
T. Install sleeves for pipes passing through concrete and masonry walls, concrete floor and roof slabs, and where indicated.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2-inches above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring where specified.
2. Build sleeves into new walls and slabs as work progresses.
3. Install large enough sleeves to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:
a. Steel Pipe Sleeves: For pipes smaller than 6-inches.
b. Steel Sheet-Metal Sleeves: For pipes 6-inches and larger that penetrate gypsum-board partitions.
c. Cast-Iron Sleeve Fittings: For floors having membrane waterproofing. Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2-inches above finished floor level.
4. Except for below-grade wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using elastomeric joint sealants.
U. Above Grade, Exterior Wall, Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Size sleeve for 1-inch annular clear space between pipe and sleeve for installation of mechanical seals.
1. Install steel pipe for sleeves smaller than 6-inch.
2. Install cast-iron wall pipes for sleeves 6-inch and larger.
3. Assemble and install mechanical seals according to manufacturer's printed instructions.
Renovate Squad OPS Page 8 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
V. Fire Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestopping sealant material.
W. Piping Joint Construction: Join pipe and fittings as follows and as specifically required in individual piping system Sections.
1. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full inside diameter. Join pipe fittings and valves as follows:
a. Note the internal length of threads in fittings or valve ends, and proximity of internal seat or wall, to determine how far pipe should be threaded into joint.
b. Apply appropriate tape or thread compound to external pipe threads (except where dry seal threading is specified).
c. Align threads at point of assembly.
d. Tighten joint with wrench. Apply wrench to valve end into which pipe is being threaded.
e. Damaged Threads: Do not use pipe or pipe fittings having threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
2. Welded Joints: Construct joints according to AWS D10.12 "Recommended Practices and Procedures for Welding Low Carbon Steel Pipe" using qualified processes and welding operators according to the "Quality Assurance" Article.
3. Flanged Joints: Align flange surfaces parallel. Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Assemble joints by sequencing bolt tightening to make initial contact of flanges and gaskets as flat and parallel as possible. Use suitable lubricants on bolt threads. Tighten bolts gradually and uniformly using torque wrench.
X. When installing more than one piping system material, ensure system components are compatible and joined to ensure the integrity of the system. Provide necessary joining fittings. Ensure flanges, union, and couplings for servicing are consistently provided.
Y. Die cut threaded joints with full cut standard taper pipe threads with red lead and linseed oil or other non-toxic joint compound applied to male threads only.
Z. Install valves with stems upright or horizontal, not inverted. Remove protective coatings prior to installation.
AA. Provide gate valves for shut-off or isolating service.
BB. Provide drain valves at main shut-off valves and at all low points of piping. System main drain located at main riser shall route to building exterior and be equipped with a 45 degree threaded elbow to allow for pipe extension during testing.
CC. Provide steel wall plate on both sides of wall for all pipe penetrations. If exposed in public space, plate shall match wall surface color.
Renovate Squad OPS Page 9 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
3.3 SELECTIVE DEMOLITION
A. General: Demolish, remove, demount, and disconnect sprinkler piping, pipe fittings, pipe supports and equipment indicated to be removed.
B. Disposal and Cleanup: Remove from the site and legally dispose of demolished materials and equipment.
3.4 EXCAVATION AND BACKFILL
A. Slope sides of excavations to comply with local codes and ordinances. Shore and brace as required for stability of excavation.
B. Shoring and Bracing: Establish requirements for trench shoring and bracing to comply with local codes and authorities. Maintain shoring and bracing in excavations regardless of time excavations will be open.
1. Remove shoring and bracing when no longer required. Where sheeting is allowed to remain, cut top of sheeting at an elevation of 30-inches below finished grade elevation.
C. Install sediment and erosion control measures in accordance with local codes and ordinances.
D. Dewatering: Prevent surface water and subsurface or ground water from flowing into excavations and from flooding project site and surrounding area.
1. Do not allow water to accumulate in excavations. Remove water to prevent softening of bearing materials. Provide and maintain dewatering system components necessary to convey water away from excavations.
2. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey surface water to collecting or run-off areas. Do not use trench excavations as temporary drainage ditches.
E. Material Storage: Stockpile satisfactory excavated materials where directed, until required for backfill or fill. Place, grade, and shape stockpiles for proper drainage.
1. Locate and retain soil materials away from edge of excavations. Do not store within drip-line of trees indicated to remain.
2. Remove and legally dispose of excess excavated materials and materials not acceptable for use as backfill or fill.
F. Trenching: Excavate trenches for mechanical installations as follows:
1. Excavate trenches to the uniform width, sufficiently wide to provide ample working room and a minimum of 6- to 9-inches clearance on both sides of pipe and equipment.
2. Excavate trenches to depth indicated or required for piping to establish indicated slope and invert elevations. Beyond building perimeter, excavate trenches to an elevation below frost line.
Renovate Squad OPS Page 10 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
3. Limit the length of open trench to that in which pipe can be installed, tested, and the trench backfilled within the same day.
4. Where rock is encountered, carry excavation below required elevation and backfill with a layer of crushed stone or gravel prior to installation of pipe. Provide a minimum of 6 inches of stone or gravel cushion between rock bearing surface and pipe.
5. Excavate trenches for piping and equipment with bottoms of trench to accurate elevations for support of pipe and equipment on undisturbed soil.
a. For pipes or equipment 6-inch or larger in nominal size, shape bottom of trench to fit bottom 1/4 of the circumference. Fill unevenness with tampered sand backfill. At each pipe joint over-excavate to relieve the bell or pipe joint of the pipe of loads, and to ensure continuous bearing of the pipe barrel on the bearing surface.
G. Cold Weather Protection: Protect excavation bottoms against freezing when atmospheric temperature is less than 35°F (2°C).
H. Backfilling and Filling: Place soil materials in layers to required subgrade elevations for each area classification listed below, using materials specified in Part 2 of this Section.
1. Under walks and pavements, use a combination of subbase materials and excavated or borrowed materials.
2. Under building slabs, use drainage fill materials.
3. Under piping and equipment, use subbase materials where required over rock bearing surface and for correction of unauthorized excavation.
4. For piping less than 30-inches below surface of roadways, provide 4-inch thick concrete base slab support. After installation and testing of piping, provide a 4-inch thick concrete encasement (sides and top) prior to backfilling and placement of roadway subbase.
5. Other areas, use excavated or borrowed materials.
I. Backfill excavation as promptly as work permits, but not until completion of the following:
1. Inspection, testing, approval, and locations of underground utilities have been recorded.
2. Removal of concrete formwork.
3. Removal of shoring and bracing, and backfilling of voids.
4. Removal of trash and debris.
J. Placement and Compaction: Place backfill and fill materials in layers of not more than 8-inches in loose depth for material compacted by heavy equipment, and not more than 4-inches in loose depth for material compacted by hand-operated tampers.
K. Before compaction, moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required percentage of maximum dry density or relative dry density for each area classification specified below. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
Renovate Squad OPS Page 11 of 11 FIRE PROTECTION
21 00 00 (202018) 2021 by FEI
L. Place backfill and fill materials evenly adjacent to structures, piping, and equipment to required elevations. Prevent displacement of piping and equipment by carrying material uniformly around them to approximately same elevation in each lift.
M. Compaction: Control soil compaction during construction, providing minimum percentage of density specified for each area classification indicated below:
1. Percentage of Maximum Density Requirements: Compact soil to not less than the following percentages of maximum density for soils which exhibit a well-defined moisture-density relationship (cohesive soils), determined in accordance with ASTM D 698 and not less than the following percentages of relative density, determined in accordance with ASTM D 4253 and ASTM D 4254, for soils which will not exhibit a well-defined moisture-density relationship (cohesionless soils).
a. Areas Under Structures, Building Slabs and Steps, Pavements: Compact top 12-inches of subgrade and each layer of backfill or fill material to 95% maximum density for cohesive material, or 98% relative density for cohesionless material.
b. Areas Under Walkways: Compact top 6 inches of subgrade and each layer of backfill or fill material to 95% maximum density for cohesive material, or 98% relative density for cohesionless material.
c. Other Areas: Compact top 6-inches of subgrade and each layer of backfill or fill material to 85% maximum density for cohesive soils, and 90% relative density for cohesionless soils.
2. Moisture Control: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water. Apply water in minimum quantity necessary to achieve required moisture content and to prevent water appearing on surface during, or subsequent to, compaction operations.
N. Subsidence: Where subsidence occurs at mechanical installation excavations during the period 12 months after Substantial completion, remove surface treatment (i.e., pavement, lawn, or other finish), add backfill material, compact to specified conditions, and replace surface treatment.
Restore appearance, quality, and condition of surface or finish to match adjacent areas.
3.5 CUTTING AND PATCHING
A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces necessary for mechanical installations. Perform cutting by skilled mechanics of the trades involved.
B. Repair cut surfaces to match adjacent surfaces.
END OF SECTION 21 00 00
Renovate Squad OPS Page 1 of 19 FIRE PROTECTION Building 254 21 05 00
(202018) 2021 by FEI
SECTION 21 05 00 - FIRE PROTECTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 WORK INCLUDED
A. This Section specifies automatic sprinkler systems and standpipe and hose systems for buildings and structures. Materials and equipment specified in this Section include:
1. Pipe, fittings, valves, and specialties.
2. Sprinklers and accessories.
B. Products furnished and installed shall include sprinkler cabinet with spare sprinklers and sprinkler wrenches.
C. Related Sections: The following Sections contain requirements that relate to this Section:
1. Fire Suppression Water Service Systems for fire protection piping from fire service mains to a point 5 feet outside the building.
2. Fire Extinguishers, Cabinets, and Accessories for fire extinguishers and extinguisher cabinets.
3. Fire alarm system.
D. Electrical Work: Protective or signal devices required for the operation specified herein shall be provided under this section in accordance with Electrical Specifications. Any wiring required for the operation specified herein, but not shown on the electrical plans, shall be provided under this section in accordance with Electrical Specifications.
1.3 DEFINITIONS
A. Pipe sizes used in this Specification are Nominal Pipe Size (NPS).
B. Other definitions for fire protection systems are listed in NFPA Standards 13 and 24.
C. Working Plans, as used in this Section, mean those documents (including drawings and calculations) prepared pursuant to the requirements contained in NFPA 13 for obtaining approval of the authority having jurisdiction.
Renovate Squad OPS Page 2 of 19 FIRE PROTECTION
(202018) 2021 by FEI
1.4 SYSTEM DESCRIPTION
A. Fire protection system in areas not subject to freezing shall be a "Wet-Pipe" system employing automatic sprinklers attached to a piping system containing water and connected to a water supply so that water discharges immediately from sprinklers opened by fire.
B. Sprinkler System Protection Limits: All spaces within areas of new building construction and existing building remodel areas. Include closets, toilet and locker room areas, each landing of each stair, and special applications areas.
1.5 SYSTEM PERFORMANCE REQUIREMENTS
A. Design and obtain approval from authority having jurisdiction for fire protection systems specified.
B. Conduct fire hydrant flow tests as required to obtain hydraulic data needed to prepare design for hydraulically calculated systems. Tests shall be within 1 year of date shop drawing submittal.
C. Hydraulically design sprinkler systems according to:
1. Sprinkler System Occupancy Hazard Classifications: As shown on plans. When plans do not specify, Sprinkler Contractor shall determine hazard classifications per local and/or any other governing fire codes, latest NFPA codes, and applicable Building Codes. As a minimum, provide hazard classifications as follows:
a. Office and Public Areas: Light hazard.
b. Storage Areas: Ordinary hazard.
c. Equipment Rooms: Ordinary hazard.
d. Service Areas: Ordinary hazard.
2. Minimum Density Requirements for Automatic Sprinkler System Hydraulic Design: Sprinkler Contractor shall provide densities as noted on plans. In absence of guidance, Contractor shall provide density requirements per UFC 3-600-01 Guidelines. Area reductions may not be used where listed quick response including quick response are used throughout the system or portion of system having same design area in accordance with NFPA 13 guidelines. As a minimum, provide density requirements as follows:
a. Light Hazard Occupancy: 0.10 GPM per square foot over 1500 square feet area.
b. Ordinary Hazard: 0.20 GPM per square foot over 2500 square feet area.
c. Special Occupancy Hazard: As determined by authority having jurisdiction.
3. Maximum Sprinkler Spacing: Sprinkler Contractor shall provide sprinkler spacing per local and/or any other governing fire codes, latest NFPA codes, applicable Building Codes, and sprinkler UL listing. As a minimum, provide sprinkler spacing as follows:
a. Classroom and Office Space: 225 square feet/sprinkler.
b. Storage Areas: 130 square feet/sprinkler.
Renovate Squad OPS Page 3 of 19 FIRE PROTECTION
(202018) 2021 by FEI
c. Mechanical Equipment Rooms: 130 square feet/sprinkler.
d. Electrical Equipment Rooms: 130 square feet/sprinkler.
e. Other Areas: According to NFPA 13.
D. Components and Installation: Capable of producing piping systems with the following minimum working pressure ratings except where indicated otherwise.
1. Sprinkler Systems: 175 PSIG.
1.6 SUBMITTALS
A. General: See submittal requirements in “Fire Protection General Provisions”. Provide additional items as noted below.
B. Product Data: Include each type sprinkler, valve, piping specialty, fire protection specialty, NFPA 13 required signs, fire department connection, hose and rack, and hose cabinet specified. When more than one model, finish, size, etc. are provided on a single vendor cut sheet, mark or highlight all that apply to this project, and/or mark through all that do not apply.
1. Sprinklers shall be referred to by the sprinkler identification and Model number as specifically published in the appropriate agency listing or approval. Trade names or other abbreviated designations shall not be allowed.
C. Sprinkler Layout Plans prepared in accordance with NFPA 13 guidelines identified as "Working Plans," including hydraulic calculations where applicable, and which have been approved by the authority having jurisdiction. Hydraulic calculations shall accompany shop drawings and shall include calculations for all required design areas. Calculations shall begin at the remote design area sprinklers and end at the test hydrant where the hydrant flow test was conducted. Include remote area design placard information adjacent to each area that hydraulic calculations are being provided for. Provide hydraulic calculations for all of the following design areas: most hydraulically demanding area on each floor of project and, if applicable, the most hydraulically demanding of each occupancy hazard type. Include room name and number on the cover page for each hydraulic calculation and on the corresponding design placard. Include design placard data by each design area on the drawings. Include updated “AS BUILT” drawings and calculations with final project operations and maintenance manual.
1. Sprinkler layout plans shall include a sprinkler legend. Sprinklers on the legend shall be referred to by the sprinkler identification or Model number as specifically published in the appropriate agency listing or approval. Trade names or other abbreviated designations shall not be allowed.
2. Sprinkler layout plans shall include a symbols legend for all symbols used on the project. If more than one pipe type is used (i.e. existing vs new, or steel vs. CPVC), provide a unique line type for each pipe style. If plotting in color, use different colors in lieu of different line types.
D. Maintenance Data for each type sprinkler, valve, piping specialty, fire protection specialty, fire department connection, for inclusion in operating and maintenance manual.
E. Welders' Qualification Certificates.
Renovate Squad OPS Page 4 of 19 FIRE PROTECTION
(202018) 2021 by FEI
F. Grooved joint couplings and fittings shall be shown on drawings and product submittals and be specifically identified with the applicable style number.
G. Test Reports and Certificates include "Contractor's Material & Test Certificate for Aboveground Piping" and "Contractor's Material & Test Certificate for Underground Piping" as described in NFPA 13. Reports shall be included as part of project operations and maintenance manual. (Note:
Sprinkler Contractor shall not connect to underground piping prior to receiving underground pipe certification documentation.
H. Operations and Maintenance Manual: Include all product data used on project except pipe and pipe fittings, project “AS BUILT” drawings, final hydraulic calculations, copies of all test reports, warranties, and owner training verification. See specification 21 00 00 for additional information.
1.7 QUALITY ASSURANCE
A. Qualified Fire Protection Engineer (QFPE):
1. A QFPE, as defined in UFC 3-600-01, shall review the sprinkler layout plans, hydraulic calculations, and material product data submittals prior to submitting for approval. The shop drawings must bear the Review Stamp of the QFPE prior to submitting the fire extinguishing shop drawings to the DFPE (DFPE is defined in UFC 3-600-01).
2. The QFPE shall create testing plan and be present for all system testing for both underground fire main and aboveground piping and sign documentation for each as a witness to the testing.
B. System Contractor Certification:
1. Working shop drawings and hydraulic calculations shall be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies (NICET), Automatic Sprinkler Systems, Level III certification or higher.
a. Current certification by the National Institute for Certification of Engineering Technologies, Level III or above;
b. Current licensure as a professional engineer with competence in fire extinguisher system design.
C. System Designer Qualifications:
1. Working shop drawings and hydraulic calculations shall be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies (NICET), Automatic Sprinkler Systems, Level III certification or higher.
2. All shop drawings submittals shall be reviewed by the QFPE. The shop drawings shall bear the seal of the QFPE.
Renovate Squad OPS Page 5 of 19 FIRE PROTECTION
(202018) 2021 by FEI
D. Installer Qualifications: Installation and alterations of fire protection piping, equipment, specialties, and accessories, and repair and servicing of equipment shall be performed only by a qualified installer. The term qualified means experienced in such work (experienced shall mean having a minimum of five (5) previous projects similar in size and scope to this project), familiar with all precautions required, and has complied with all the requirements of the authority having jurisdiction.
Upon request, submit evidence of such qualifications to the Architect.
E. Qualifications for Welding Processes and Operators: Comply with the requirements of AWS D10.9, “Specifications for Qualifications of Welding Procedures and Welders for Piping and Tubing, Level
AR-3."
F. All grooved couplings, fittings, valves and specialties shall be the products of a single manufacturer.
Grooving tools shall be of the same manufacturer as the grooved components.
1. All castings used for couplings, housings, fittings, or valves and specialty bodies shall be date stamped for quality assurance and traceability.
G. Regulatory Requirements: Comply with the requirements of the following codes and standards:
1. NFPA 13 - Standard for the Installation of Sprinkler Systems.
2. NFPA 26 - Recommended Practice for the Supervision of Valves Controlling Water Supplies for Fire Protection.
3. NFPA 70 - National Electrical Code.
4. Local IANG Base Fire Department Requirements.
5. UL and FM Compliance: Fire protection system materials and components shall be Underwriter's Laboratories listed and labeled, and Factory Mutual approved for the application anticipated.
6. Local Permits and Inspection Requirements.
7. Local utility requirements.
1.8 SEQUENCING AND SCHEDULING
A. Schedule rough-in installations with installations of other building components.
1.9 EXTRA MATERIALS
A. Sprinkler Wrenches: Furnish to Owner, two (2) sprinkler wrenches for each type/size of sprinkler head installed. Wrenches shall be provided by the sprinkler manufacturer and will directly engage the hex-shaped wrench boss integrally cast in the sprinkler body.
B. Sprinklers and Cabinets: Furnish spare sprinklers in quantities as outlined in NPFA 13 and shall include each style included in the project or as detailed in NFPA 13. Furnish special wrenches as specified in this Section. Furnish and install a sprinkler cabinet or cabinets sized to house the NFPA 13 quantity of spare sprinklers listed above.
Renovate Squad OPS Page 6 of 19 FIRE PROTECTION
(202018) 2021 by FEI
PART 2 - PRODUCTS
2.1 SPRINKLER DESIGNERS/INSTALLERS
A. Company shall be a licensed sprinkler contractor in the state where the project is located.
B. Company shall have a NICET level III or above certified designer with a minimum of 5 years’ experience designing fire protection systems on staff.
2.2 MANUFACTURERS
A. Manufacturer: Subject to compliance with requirements, provide fire protection system products from one (1) of the following:
1. Specialty Valves, Water Motor Alarms, and Air-Pressure Maintenance Devices:
a. ASCOA Fire Systems, Figgie International Co.
b. Central Sprinkler Corp.
c. Firematic Sprinkler Devices, Inc.
d. Gem Sprinkler Co. Div., Grinnell Corp.
e. Globe Fire Sprinkler Corp.
f. Reliable Automatic Sprinkler Co., Inc.
g. Star Sprinkler Corp.
h. Tyco-Grinnell
i. Victaulic Company
j. Viking Corp.
2. Backflow Preventers:
a. Ames Co., Inc.
b. Cla-Val Co.
c. Conbraco Industries, Inc.
d. Febco.
e. Hersey Products, Inc., Grinnell Corp.
f. Watts Regulator Co.
g. Wilkins Regulator Div., Zurn Industries, Inc.
Renovate Squad OPS Page 7 of 19 FIRE PROTECTION
(202018) 2021 by FEI
3. Waterflow Indicators and Supervisory Switches:
a. Gamewell Co.
b. Gem Sprinkler Co. Div., Grinnell Corp.
c. Potter Electric Signal Co.
d. Reliable Automatic Sprinkler Co., Inc.
e. System Sensor Div., Pittway Corp.
f. Victaulic Company of America.
g. Watts Regulator Co.
4. Fire Department Connections:
a. Badger-Powhatan, Figgie International Co.
b. Croker Div., Fire-End and Croker Corp.
c. Elkhart Brass Mfg. Co., Inc.
d. Firematic Sprinkler Devices, Inc.
e. Gem Sprinkler Co. Div., Grinnell Corp.
f. Guardian Fire Equipment, Inc.
g. Potter-Roemer Div., Smith Industries, Inc.
h. Reliable Automatic Sprinkler Co., Inc.
i. Sierra Fire Equipment Co.
5. Sprinklers:
a. ASCOA Fire Systems, Figgie International Co.
b. Central Sprinkler Corp.
c. Firematic Sprinkler Devices, Inc.
d. Gem Sprinkler Co. Div., Grinnell Corp.
e. Globe Fire Sprinkler Corp.
f. Reliable Automatic Sprinkler Co., Inc.
g. Star Sprinkler Corp.
h. Tyco-Grinnell
Renovate Squad OPS Page 8 of 19 FIRE PROTECTION
(202018) 2021 by FEI
i. Firelock; Victaulic Company.
j. Victaulic Company of America
k. Viking Corp.
6. Flexible Hose Sprinkler Connections:
a. VicFlex; Victaulic Company.
b. Rascoflex; Reliable Automatic Sprinkler Co., Inc.
7. Indicator Valves:
a. Gem Sprinkler Co. Div., Grinnell Corp.
b. Grinnell Supply Sales Co., Grinnell Corp.
c. Kennedy Valve Div., McWane, Inc.
d. Milwaukee Valve Co., Inc.
e. Nibco, Inc.
f. Sprink-Line by Sprink, Inc.
g. Victaulic Company of America.
8. Fire Protection Service Gate and Check Valves:
a. Gem Sprinkler Co. Div., Grinnell Corp.
b. Kennedy Valve Div., McWane, Inc.
c. Nibco, Inc.
d. Stockham Valves and Fittings, Inc.
e. Victaulic Company of America.
9. Grooved Couplings for Steel Piping:
a. Gruvlok; Anvil Industries.
b. Shurjoint.
c. Tyco-Grinnell
d. Victaulic Company of America.
10. Grooved Couplings for AWWA Ductile-Iron Piping:
a. Shurjoint.
Renovate Squad OPS Page 9 of 19 FIRE PROTECTION
(202018) 2021 by FEI
b. Tyco-Grinnell
c. Victaulic Company of America.
11. Press-Seal Fittings for Steel Piping:
a. Victaulic Company of America.
2.3 PIPE AND TUBING MATERIALS (SELECTION AS PER LOCAL CODE
REQUIREMENTS)
A. Refer to Part 3 Article "Piping Applications" for identification of systems where pipe and fitting materials specified below are used.
B. Ductile-Iron Pipe and Fittings: Mechanical joints, ductile iron fittings; AWWA C110, ductile or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern. .
1. Glands, Gaskets and Bolts: AWWA C111 ductile- or gray-iron glands, rubber gaskets and steel bolts.
C. Steel Pipe: ASTM…