W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004.pdf
PDF 728 KB Posted
- Attached to
- Renovate Bldg 254 Squadron Operations at 185ARW
- Solicitation number
- W912LP21B0001
About this file
This document package includes plans, specifications, and forms for the renovation of Building 254 at the 185th Air Refueling Wing in Sioux City, Iowa. The project involves renovating 31,699 square feet of existing squadron operations and support facilities to upgrade office, classroom, restroom, locker room, storage, and secure space. Work includes renovating 1,600 square feet to sensitive compartmented information facility standards, replacing the HVAC system, upgrading electrical and communications systems, installing fire suppression and alarm systems, constructing a 2,300 square foot dual-use alert facility, and performing exterior repairs. The contract duration is 365 days with a value between $5-10 million. The solicitation was released by the US Property and Fiscal Office for the Iowa Army National Guard for a firm fixed-price contract to complete the required renovations.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate Squadron Operations Building 254 Addendum No. 004
Project Location July 30, 2021
FEH Project No. 2013008.11 Page 1 of 3
6 0 4 E AS T GRA ND A VE NU E
D ES MO I NES , IO W A 5 0 30 9
5 1 5 28 8 20 00
ADDENDUM NO. 004
Renovate Squadron Operations Building 254
185th ARW, Sioux Gateway Airport
BG Bud Day Field
Sioux City, IA 51111-1300
Project No: VSSB192001
Architect’s File No. 2013008.11
FEH DESIGN
604 East Grand Avenue
PHONE (515) 288-2000
FAX (515) 288-1999
DATE ISSUED: July 30, 2021
TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and any previously issued Addendums. Portions of the Addendum affected the Contract
Documents will be incorporated into the Contract by enumeration of the Addenda in the Owner/Contractor
Agreement.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum forms a part of the Bidding Documents.
GENERAL and ADMINISTRATIVE ITEMS
1. Clarification: FEH DESIGN did not provide an “ADDENDUM #001”. FEH DESIGN Addendums start with “Addendum #002”.
2. Attachment #01; Interior “Color & Finishes List” for Contractor use to understand color, product grade and characteristics.
REFER TO PROJECT MANUAL
FEH Project No. 2013008.11 Page 2 of 3
5 1 5 28 8 20 00
1. 05 70 00 – DECORATIVE METAL PLATES
a. Article 2.5.E.: Change Alloy to “6061 T651”
2. 06 40 23 – INTERIOR ARCHITECTURAL WOODWORK
a. Article 1.5-A.: Replace with the following:
“A. Installer Qualifications: Installer to be either Fabricator of Products or Fabricator approved Third Party installer which may include General Contractor approved forces.”
b. Article 2.6.C.2.: Add the following for drawer sides: Finished ½“or 5/8” solid hardwood using glued dovetailed construction approved.
c. Article 2.6.C.3.: Add the following for drawer bottoms: “1/4-inch thick glued and dadoed into front, back, and sides of drawers. Use 1/2-inch-thick material for drawers more than 24 inches wide.”
3. 08 71 00 – DOOR HARDWARE
a. Article 2.18, A.1.: Add sub-paragraph “b.” as follows:
“ b. High Security Corbin-Russwin cylinders / cores – GGM-H-2672 with H1 keyway.”
REFER TO DRAWINGS
1. Sheet C3.0:
a. At the new 48” sanitary manhole, the calculated depth for the new manhole base on the best available information is between 8.85 and 9.35 feet. The sewer depth calculation is elevation 1082.15. The rim elevation will depend on whether it ends up in the sidewalk or street.
2. Sheet A4.3:
a. Detail 5: The pieces may be split into smaller sections and spliced together. The seams should run parallel to the direction of the slots shown in each piece. Seams shall be continuously welded and ground smooth. All splices are to be indicated on shop drawings during submittal review. See additional details provided in Addendum #004 – Drawing
ADD04-2.
3. Sheet S2.3:
a. At detail 13/S2.3; ¼” plate sleeve to be changed to “stainless steel”.
b. Details1, 3 & 13 on Sheet S2.3: all threaded rods to be stainless steel.
c. Details1, 3 & 13 on Sheet S2.3: The intent is for the connection between the rods and the canopy pieces and the rods and the surrounding frame to be a system of eye bolts and tie rod assemblies. There are a variety of different eyebolt design and connection types
(welded, threaded, through bolt, etc.) that could be utilized and are available at the contractor’s preference as long as the specified loading requirements for each connection are met. The tie rod assemblies are intended to be fixed length rods with a clevis at both ends that then connect to the eye bolts. The contractor will be required to provide the proposed hardware and supporting information as part of the submittal approval process.
FEH Project No. 2013008.11 Page 3 of 3
5 1 5 28 8 20 00
d. Canopy Stiffener Plates: The stiffener plates are intended to be wide enough to extend 3” minimum past each side of the plate joint locations and run entire length of joints unless noted otherwise. Details clarifying the angles of each plate section are provided in
Addendum #004.
4. Sheet ADD04-1: Drawing added to show south canopy parts pitch angles to each part.
5. Sheet ADD04-2: Drawing added to show south canopy seam locations for each part exceeding standard sheet metal sizes.
6. Sheet ADD04-3: Drawing added to show south Auditorium 156A elevation and finishes.
ATTACHMENTS
1. Addendum #004 – Attachment #01; Interior “Color & Finishes List” .
2. Drawing ADD04-1: Revised Canopy Details (11x17)
3. Drawing ADD04-2: Revised Decorative Metal Canopy Alum. Parts Template (11x17)
4. Drawing ADD04-3: Auditorium 156A South Elevation (11x17)
MECHANICAL & ELECTRICAL
Changes to the Drawings
1. Clarification for Mechanical and Plumbing Drawings: all Heat Pumps and ERV’s require condensate piping. Condensate piping is shown for all HP’s and ductless splits outside the mezzanine. Floor drains and hub drains are provided at convenient locations on the mezzanine for condensate disposal from all HP’s and ERV’s.
MEP Attachments
1. None
Amendment #004 – Attachment #01 Page 1 of 2
VSSB192001 – 185th Squadron Operations - Building 254
Interior Colors & Finishes List
10.16.2020
Colors and Finishes indicated below were used for performance requirements of related specification sections. Contractor is not limited to these brands. Contractor shall provide products which are similar in color, product grade and characteristics.
Paint
PNT-1 Typical Walls, Sherwin Williams, Agreeable Gray, SW 7029
PNT-2 Exposed Ceilings, Sherwin Williams, Acier, SW 9170
PNT-3 Trim, Sherwin Williams, Caviar, SW 6258
PNT-4 Gyp. Bd. Ceilings, Sherwin Williams, Pure White, SW 7005
PNT-5 Accent Walls, Sherwin Williams, Revel Blue, SW 6530
Tiling
CT-1 (Floor) Daltile, Vertuo, Composer, 12 x 48; Stack Bond.
Grout: Mapei Ultracolor Plus
Edge Trim: Schluter Systems
CT-2 (Floor) Daltile, Portfolio, , 2 x 2.
CT-3 (Wall) Daltile, Vertuo, Maestro, 12 x 48; Stack Bond.
Burnished Block
BB-1 Anchor Block (AMCON), Gray Spice 581
Tile Carpeting
WCPT-1 Patcraft, Beyond the Door, Paseo, Lapic, Monolithic Installation
CPT-1 Mohawk Group, Nutopia 2.0, Urban Field II, 989 Pavement
CPT-2 Mohawk Group, Nutopia 2.0, Urban Passage II, 975 Riverside
CPT-3 Mohawk Group, Textural Effects, Matte Finish, 979 Graphite
Epoxy Flooring
EPX-1 Key Resin Company, VersaFlake, Custom
EPX-2 Key Resin Company, Keyluxe, Custom
Resilient Flooring
LVT-1 Patcraft, Crossover, Shadow 00570
Resilient Accessories
VB-1 Johnsonite Dark Brown
VB-2 Johnsonite, 179, Steel WG
Amendment #004 – Attachment #01 Page 2 of 2
Quartz Tops
QTZ-1 Cambria, Berwyn Matte
Plastic Laminate
PL-1 General Millwork and Doors: Formica, Black Riftwood – 6414-NG
PL-2 Toilet Partitions: Wilsonart, Satin Stainless –4830K-18
PL-3 Display Cases: Wilsonart, Neowalnut – 7991-38
PL-4 Countertops: Wilsonart, Shadow Zephyr – 4857-60
Solid Surfacing
Tops SS-1 Corian, White Onyx
Sills SS-2 Corian, Glacier White
Sinks SS-3 Corian, Antarctica
Vinyl Wall Covering
VWC-1 Graphics
VWC-2 Graphics
VWC-3 Graphics
VWC-4 Graphics
VWC-5 Versa Wallcovering, Burnished Silk, Tavernier Blue
Acoustical Wall Paneling
AWP-1 Filzfelt, Bats Acoustical Panels, Custom
SHEET METAL
MS-1 Sheet Metal
Wall Paneling
WP-1 Soelberg Industries, Onda 1, Glacier White
Fabric Wrapped Panel
Designtex, Blink, Old Silver
31'-11 1/4"
PART A PART B
PART C
"BODY"
.5
.5
.2
/4
PART A
PART B
PART C
"BODY"
PART C
PART B
PART A
SEE STRUCTURAL FOR CONNECTION
DETAILS AND SUPPORT DETAILS
ADD04.1
ADD04.1
ADD04.1
.7
.7
. 1
LEVEL LINE
0.88°
.0
SHEET
S H
E E
T T
IT
L E
P R
O J E
C T T
IT
L E
DATE ISSUED:
PROJECT NUMBER
S
IO
U X
C
IT
Y
IA
(7
-3
D E
S M
O
IN
E S
IA
(5
-2
F E
H D
E S
IG
N
.C O
M
F E
H D
E S
IG
N
O C
O N
O M
O W
O C
W
I
(2
-2
D U
B U
Q U
E
IA
(5
-4
C
U s e rs \r ic k s \D o c u m e n ts
\2
.1
S
Q O
P S
B ld g
R ri c k s fe h d m
.c o m .r v t
7/30/2021 9:53:10 AM
2013008.11
ADD04.1
R E
V
IS
E D
C A
N O
P Y
D E
T A
IL
S
IO
W
A A
IR
N
A T
IO
N A
L G
U A
R D
V
S S
B
S Q
U A
D R
O N
O P
E R
A T
IO
N S
B U
IL
D
IN
G
T H
A R
W S
IO
U
X G
A T E
W A
Y A
IR
P
O R
T B
G B
U D
D A
Y F
IE
L D
S
IO
U
X C
IT
Y
IA
30 JULY 2021
SCALE: 1/4" = 1'-0"2DECORATIVE METAL CANOPY ROLL ANGLE SECTION
SCALE: 1/4" = 1'-0"1REVISED DECORATIVE METAL CANOPY AERIAL PLAN
SCALE: 1/4" = 1'-0"5PART C PITCH ANGLE
SCALE: 1/4" = 1'-0"4PART B PITCH ANGLE
SCALE: 1/4" = 1'-0"3PART A PITCH ANGLE
REV. NO. DATE
03 7/30/21
/4
R
'-7
R
'-3
/8
4"
4"
R
4' -1
1/
2"
R ±4'-9 5/8"
±52.25°
4"
4"
R
'-5
/4
R ±6'-1"
4"
'-9
/8
R ±25'-5 3/8"
R ±1'-11 1/8"
R ±2'-7"
R ±6'-0 1/2"
R ±27'-11 1/8"
R ±10 1/4"
NOTE: ELECTRONIC FILES AVAILABLE
FROM ARCHITECT TO SUCCESSFUL
CONTRACTOR IN REVIT OR AUTOCAD
FORMAT.
PART A PART B
PART C "BODY"
8'-11 1/4"
6'-7"
3'-10"
/2
/8
7'-1 7/8"
/2
7'-7 3/8"
6'-6 3/8"
R
'-2
/2
R ±5'-4 5/8"
11 1/8"
R
'-3
/8
4'-1 3/4"
1'-4 3/8"
'-9
/8
'-5
'-5
PROPOSED
SPLICE
LOCATION
PROPOSED
SPLICE
LOCATION
PROPOSED
SPLICE
LOCATION
PROPOSED
SPLICE
LOCATION
SHEET
S H
E E
T T
IT
L E
P R
O J E
C T T
IT
L E
DATE ISSUED:
PROJECT NUMBER
S
IO
U X
C
IT
Y
IA
(7
-3
D E
S M
O
IN
E S
IA
(5
-2
F E
H D
E S
IG
N
.C O
M
F E
H D
E S
IG
N
O C
O N
O M
O W
O C
W
I
(2
-2
D U
B U
Q U
E
IA
(5
-4
C
U s e rs \r ic k s \D o c u m e n ts
\2
.1
S
Q O
P S
B ld g
R ri c k s fe h d m
.c o m .r v t
7/30/2021 9:42:07 AM
2013008.11
ADD04.2
R E
V
IS
E D
D E
C O
R A
T
IV
E M
E T A
L C
A N
O P
Y A
L U
M
IN
U M
P A
R T S
T E
M P
L A
T E
IO
W
A A
IR
N
A T
IO
N A
L G
U A
R D
V
S S
B
S Q
U A
D R
O N
O P
E R
A T
IO
N S
B U
IL
D
IN
G
T H
A R
W S
IO
U
X G
A T E
W A
Y A
IR
P
O R
T B
G B
U D
D A
Y F
IE
L D
S
IO
U
X C
IT
Y
IA
30 JULY 2021
SCALE: 1/4" = 1'-0"1
REVISED DECORATIVE METAL CANOPY ALUMINUM
PARTS TEMPLATE
2 CONT.
A5.1
_______6
A5.3
GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED WALL
MOUNTED TV/MONITOR WITH
BRACKET. VERIFY MOUNTING
HEIGHT AND LOCATION WITH
OWNER PRIOR TO INSTALLATION
OF OUTLETS AND BRACKETS.
PROVIDE WOOD BLOCKING AT
STUD WALLS
CEILING MOUNTED MOTORIZED
PROJECTION SCREEN, BY
CONTRACTOR
ROLLER WINDOW SHADES
CONCRETE MASONRY UNIT (CMU)
D156.1 D156.2 A U D
IT
O R
IU
M
O P E N A
R E A
6A
VDF
WALL BASE PER ROOM FINISH
SCHEDULE
PAINT GYPSUM BOARD WALLS
SHEET
S H
E E
T T
IT
L E
P R
O J E
C T T
IT
L E
DATE ISSUED:
PROJECT NUMBER
S
IO
U X
C
IT
Y
IA
(7
-3
D E
S M
O
IN
E S
IA
(5
-2
F E H
D E
S
IG
N .C
O M
F E H
D E
S
IG
N
O C
O N
O M
O W
O C
W
I
(2
-2
D U
B U
Q U
E
IA
(5
-4
C
U s e rs \r ic k s \D o c u m e n ts
\2
.1
S
Q O
P S
B ld g
R ri c k s fe h d m
.c o m .r v t
7/30/2021 9:42:09 AM
2013008.11
ADD04.3
A U
D
A
S O
U T H
E L E
V A
T
IO
N
IO
W A
A
IR
N A
T
IO
N A
L G
U A
R D
V
S S
B
S Q
U A
D R
O N
O P
E R
A T
IO
N S
B U
IL
D
IN
G
T H
A R
W S
IO
U
X G
A T E
W A
Y A
IR
P
O R
T B
G B
U D
D A
Y F
IE
L D
S
IO
U
X C
IT
Y
IA
30 JULY 2021
SCALE: 3/8" = 1'-0"1
AUD 156A - SOUTH
ELEVATION
| 2013008.11 Sqd Ops Bldg 254-Amendment #004 Attachment #01-Colors&Finishes |
| ADD04-1 - REVISED CANOPY DETAILS |
| ADD04-2 - REVISED DECORATIVE METAL CANOPY ALUMINUM PARTS TEMPLATE |
| ADD04-3 - AUD 156A SOUTH ELEVATION |
File details come from the government source that posted it. Updated .