W912LP-21-B-0001_Attachment_10_2013008.11 Sqd Ops Bldg 254 - Addendum #005.pdf
PDF 578 KB Posted
- Attached to
- Renovate Bldg 254 Squadron Operations at 185ARW
- Solicitation number
- W912LP21B0001
About this file
This solicitation is for a firm fixed-price construction contract to renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing of the Iowa Air National Guard base in Sioux City, Iowa. The scope of work includes renovating office spaces, classrooms, restrooms, locker rooms, common areas, and storage spaces; upgrading 1,600 square feet to sensitive compartmented information facility standards; replacing the HVAC system; upgrading electrical and communications systems; constructing a 2,300 square foot dual use Alert Facility; and repairing rooms for the Global Aircrew Strategic Network Terminal. The contract duration is 365 days after notice to proceed, and the magnitude of construction is estimated between $5 million and $10 million. Supporting documentation includes building plans, specifications divided into parts, and facility assessment forms addressing architectural, mechanical, electrical, plumbing, civil, and structural systems.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate Squadron Operations Building 254 Addendum No. 005
Project Location August 03, 2021
FEH Project No. 2013008.11 Page 1 of 3
6 0 4 E A S T G R A N D A V E N U E
D E S M O I N E S, I O W A 50 3 0 9
5 1 5 2 8 8 2 0 00
ADDENDUM NO. 005
Renovate Squadron Operations Building 254
185th ARW, Sioux Gateway Airport
BG Bud Day Field
Sioux City, IA 51111-1300
Project No: VSSB192001
Architect’s File No. 2013008.11
FEH DESIGN
604 East Grand Avenue
PHONE (515) 288-2000
FAX (515) 288-1999
DATE ISSUED: August 03, 2021
TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:
This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and any previously issued Addendums. Portions of the Addendum affected the Contract
Documents will be incorporated into the Contract by enumeration of the Addenda in the Owner/Contractor
Agreement.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum forms a part of the Bidding Documents.
GENERAL and ADMINISTRATIVE ITEMS
1. Clarification: FEH DESIGN did not provide an “ADDENDUM #001”. FEH DESIGN Addendums start with “Addendum #002”.
REFER TO PROJECT MANUAL
1. 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS
a. Article 1.2-A.-2.: Delete the word “blast”.
FEH Project No. 2013008.11 Page 2 of 3
5 1 5 2 8 8 2 0 00
b. Article 1.4.: After “12 December 2018” add the words “Change 1, 19 August 2020”.
c. Article 3.2-A.-5.a.: Delete the words “blast mitigation”.
d. Article 1.5.C.: Delete article and all sub-paragraphs 1 thru 4. Replace with the following”
“C. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.
“1. Frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:
“a) For laminated glass, the frame shall meet bite requirements indicated in
Glazing Specifications with the laminated pane utilizing adhesive glazing tape.
The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.
“2. Exterior doors: All exterior doors shall open outwards and the doors shall seat into the door frames in response to an explosive blast.
e. Article 2.9-A: Change to: Color Anodic Finish: AAMA 611, AA-M12C22A42/A44, CLASS 1,
0.018 MM or thicker. Color: Dark Bronze
2. 08 51 13 ALUMINUM WINDOWS
a. Article 1.2-B.: Delete the word “blast”.
b. Article 1.5.C.: Delete entire paragraph and sub-paragraphs 1 thru 3.
c. ADD Article 1.4.F. as additional performance requirements.
“F. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.
“1. Frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:
“a) For laminated glass, the frame shall meet bite requirements indicated in
Glazing Specifications with the laminated pane utilizing adhesive glazing tape.
The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.
3. 08 80 00 - GLAZING
a. Article 1.2-A.4.: After “12 December 2018” add the words “Change 1, 19 August 2020”.
FEH Project No. 2013008.11 Page 3 of 3
5 1 5 2 8 8 2 0 00
b. Article 3.2-A.4: Delete the word “blast”.
c. ADD Article 1.4.C. as additional performance requirements.
“C. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.
“1. Glazing in frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:
“a) For laminated glass, the frame & glazing shall meet bite requirements indicated in Glazing Specifications with the laminated pane utilizing adhesive glazing tape. The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.
4. 10 51 23 PLASTIC LAMINATE LOCKERS
a. Add Article 2.5-B.: Protective Mats: 1/8-inch- (3-mm-) thick, solid rubber.
5. 10 71 13 EXTERIOR SUN CONTROL DEVICES
a. Article 1.2-A.: Delete entire article (no UFC requirements or “Blast” requirements.
REFER TO DRAWINGS
1. Sheet A7.5:
a. Interior Elevations 3, 4,5 & 6: Delete reference to “ABI #2” at lockers. Clarification: All lockers in these elevations are Base Bid. There are no Additive Bid Items or Alternate Items.
b. Keynotes Legend (Upper Right Corner): At Keynote 10 51 23.A1: Delete reference to “ABI
#2”.
2. Sheet A9.2:
a. Change ceilings and floor finishes as indicated with revision clouds.
ATTACHMENTS
1. Sheet A9.2: Room Finish Schedule, Details
ROOM FINISH NOTES
1. TELECOMMUNICATION CABLES: ALL DATA CABLINE (INCLUDING
CONCEALED, IN CABLE TRAYS OR ABOVE CEILINGS) SHALL BE PROTECTED
FROM PAINT OVERSPRAY OR INSTALLED AFTER PAINTING - COORDINATE
WITH OTHER TRADES. PAINT ON DATA CABLING VOIDS THECABLE WARRANTY.
ANY DATA CABLING WITH PAINT ON THEM SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
2. FINISHES FOR CLOSETS AND AREAS NOT SHOWN SHALL RECEIVE THE
SAME FINISH TO THAT OF THE ADJACENT ROOM U.N.O..
3. ELECTRICAL PANELS AND ACCESS DOOR PANELS SHALL BE PRIMED AND
PAINTED TO MATCH ADJACENT WALLS (VERIFY WITH OWNER).
4. CONCRETE FLOORS THAT ARE NOT SCHEDULED FOR A FINISH FLOOR
MATERIAL SHALL RECEIVE SEALER PER THE PROJECT MANUAL.
CONCRETE FLOORS ARE TO BE CLEANED OF ALL FOREIGN MATERIAL PRIOR
TO THE APPLICATION OF THE SEALER.
5. PROVIDE EXPANSION JOINTS AT ALL SLAB EDGES AGAINST EXTERIOR
WALLS. REFER TO STRUCTURAL.
6. SLOPE INTERIOR FLOOR SLAB TO DRAIN AT 1/8" PER FOOT WHERE SLOPED
SLABS ARE INDICATED, U.N.O.
7. FLOOR SLAB TO BE SLOPED DOWN AROUND DRAINS WHERE FLOOR SLAB
IS NOT INDICATED TO BE SLOPED, EXCEPT IN RESTROOMS WITH TILE. IN
RESTROOMS WITH TILE, INSTALL DRAIN TO BE FLUSH WITH ADJACENT
FLOOR TILE. REFER TO MECHANICAL DRAWINGS FOR ALL FLOOR DRAINS.
8. FLOOR DRAINS AND TRENCH DRAINS INDICATED FOR LOCATION AND
CONFIGURATION ONLY, REFER TO MECHANICAL DRAWINGS FOR PRODUCT
AND PIPING INFORMATION.
9. JOINT LAYOUT LOCATIONS SHOWN ARE FOR BIDDING PURPOSES ONLY.
VERIFY LAYOUT / LOCATIONS WITH ARCHITECT PRIOR TO BEGINNING WORK
AND SUBMIT JOINT LAYOUT DRAWING FOR APPROVAL.
10. VERIFY WALL AND FLOOR TILE PATTERN LAYOUT WITH ARCHITECT PRIOR
TO BEGINNING WORK.
11. TILE JOINTS (BOTH ON WALL AND FLOOR) ARE TO ALIGN WITH MASONRY
JOINTS ON WALL. WHERE TILE JOINTS DO NOT ALIGN WITH THAT OF CMU, CUT
TILES AT MIDDLE OF THE RUN OR AT THE DOOR, OR AS SHOWN ON FLOOR
FINISH PLANS. IF DISCREPANCY IS FOUND, CONTACT ARCHITECT BEFORE
LAYING TILE.
12. ALL FLOOR FINISH TRANSITIONS TO BE LOCATED UNDER DOOR
CENTERLINES, U.N.O.
13. PAINT ENTIRE WALL FROM FINISHED FLOOR TO STRUCTURE ABOVE AT
AREAS WHERE CEILING DOES NOT MEET THE WALL.
A. PARTIAL AREA OF FLOOR HAS RAISED ACCESS PANELS; VINYL FLOOR FINISH
B. GRAPHIC WRAPS AROUND BULKHEAD
C. PAINT CATWALK GUARD RAILS
D. EXISTING CEILING GRID TO REMAIN
E. ROOM OCCUPIED DURING CONSTRUCTION
F. SEE INTERIOR ELEVATIONS FOR ACOUSTICAL WALL PANELS (AWP)
G. CARPET TILE OVER RAISED ACCESS FLOOR PREFINISHED VINYL.
ROOM FINISH COMMENTS
ROOM FINISH SCHEDULE LEGEND
CPT CARPET TILE
CT CERAMIC TILE
LVT LUXURY VINYL TILE
EPX EPOXY FLOORING
SC SEALED CONCRETE
VCT VINYL COMPOSITION TILE
WCPT WALK-OFF CARPET TILE
VAF VINYL ACCESS FLOORING
FLOORS
ACT ACOUSTICAL CEILING TILE
EACT EXISTING GRID WITH NEW CEILING TILE
EXP-2 EXPOSED STRUCTURE, NO PAINT
EXP-1 EXPOSED STRUCTURE, PAINT
GB GYPSUM BOARD, PAINT
EGB GYPSUM BOARD, EPOXY PAINT
CEILINGWALL
CT CERAMIC TILE
PNT PAINT
SGPNT SEMI-GLOSS PAINT
MS MILD STEEL
BB BURNISHED BLOCK
VWC VINYL WALLCOVERING
AWP ACOUSTIC WALL PANELS
WP WALL WOOD COMPOSITE PANELING
VDF VISUAL DISPLAY FABRIC (DRY ERASE)
PL PLASTIC LAMINATE WOOD PANELING
BRICK BRICK VENEER
(NOTE: NUMER BEHIND WALL FINISH
REFERENCES MATERIAL COLORS - SEE SPEC)
CT CERAMIC TILE BASE
VB VINYL BASE
BASE
Epoxy
Metal Floor Transition
Luxury Vinyl Tile
Metal Edge Termination
Epoxy
Metal Floor Transition
Sealed Concrete
Metal Edge Termination Ceramic Tile or Carpet Tile
Metal Edge Termination
Epoxy Luxury Vinyl Tile
Vinyl Floor Transition
Ceramic Tile
Sealed Concrete
Vinyl Floor Transition
Carpet Tile
VINYL FLOOR
TRANSITION EDGE;
PROVIDE AT ALL
CARPETING
EXPOSED EDGESCARPET TILE
CERAMIC TILE
1/4" X 1/2" ALUMINUM
EDGE ANGLE
CL OF DOOR
EPOXY QUARTZ
BUILD UP EPOXY QUARTS
TO MEET CT THICKNESS
FLOOR TILE; SEE FLOOR FINISH
PLAN; SEE SPECIFICATIONS
/4
1" 3" 1"
MARBLE/ SOLID
SURFACE THRESHOLD
5/8"
5/8"
6" 5/8"
5/8"
ACOUSTICAL SEALANT
Within Controlled SideWithin Controlled Side
BOTH SIDES
3 5/8" METAL RUNNER
RAISED ACCESS FLOORINGRAISED ACCESS FLOORING
5/8" GYPSUM WALLBOARD
5/8" GYPSUM WALLBOARD
6" METAL STUD FRAMING
ACOUSTICAL BATT INSULATION
SEE ROOM FINISH SCHEDULE FOR
FLOOR FINISH
4" RESILIENT BASE
PEDESTAL SUPPORT FOR RAISED
ACCESS FLOORING
4" RESILIENT BASE
ACOUSTICAL SEALANT - INSTALL
BETWEEN FLOOR SLAB & STUD
RUNNER FLOOR TRACK.
SEE ROOM FINISH SCHEDULE FOR
FLOOR FINISH
P L A
N
S E
E
8 1/2"
1"1"
/3
5 1/4"
09 30 00.04
09 30 00.01
09 30 00.01
SHOWER SIDE -
SLOPE DOWN TO
DRAIN
Within Controlled Side
S E
E P
L A
N
RAISED ACCESS FLOORING
SEE ROOM FINISH SCHEDULE FOR
FLOOR FINISH
PEDESTAL SUPPORT FOR RAISED
ACCESS FLOORING
METAL CLOSURE ANGLE BY RAISED
ACCESS FLOR MANUFACTURER
ACOUSTICAL SEALANT - INSTALL
BETWEEN FLOOR AND BOTH
LAYERS GYPSUM BOARD WALL
PANEL; BOTH SIDES OF WALL.
WEST WALL
ROOM 177
EXISTING OR
NEW CONCRETE
SLAB - SEE
STRUCTURAL
EXISTING OR
NEW CONCRETE
FOUNDATION WALL -
SEE STRUCTURAL
CL OF DOOR
EPOXY QUARTZ
EPOXY QUARTS TO MEET
SEALED CONCRETE SURFACE
CUT CONCRETE
SEALED CONCRETE
/3
3"
CERAMIC TILE
CRACK ISOLATION
MEMBRANE/ WATER
PROOF MEMBRANE
METAL TRANSITION STRIP
CARPET TILE
LUXURY VINYL TILE RESILIENT TRANSITION
SEALED CONCRETE
VINYL FLOOR
TRANSITION
LUXURY VINYL TILE
VCT
O M
A H
A L
IN
C
O L N
D
E S
M O
IN
E
S C
O L O
R A
D O
S P
R
IN
G S
F A
R R
IS
E
N G
IN
E
E R
IN
G fa rr is -u s a .c o m
S
IO
U X
C
IT
Y
IA
(7 -3
D E
S M
O
IN
E S
IA
(5 -2
F E
H D
E S
IG
N
.C O
M
F E
H D
E S
IG
N
S H
E E
T T
IT
L E
P R
O J E
C T T
IT
L E
DATE ISSUED
PROJECT NUMBER
SHEET
IN
A
S S
O C
IA
T
IO
N W
IT
H
O C
O N
O M
O W
O C
W
I
(2 -2
D U
B U
Q U
E
IA
(5 -4
8/3/2021 10:51:47 AM
C U s e rs
\j a s o n c \D o c u m e n ts
\2
.1
S Q
O P
S B ld g
R ja s o n c L L
J W
C .r v t
A9.2
2013008.11
30 JULY 2021
S Q
U A
D R
O N
O P
E R
A T
IO
N S
B U
IL
D
IN
G
T H
A R
W S
IO
U
X G
A T E
W A
Y A
IR
P
O R
T B
G B
U D
D A
Y F
IE
L D
S
IO
U
X C
IT
Y
IA
R O
O M
F
IN
IS
H
S C
H E
D U
L E
D
E T A
IL
S
IO
W
A A
IR
N
A T
IO
N A
L G
U A
R D
V
S S
B
ROOM FINISH SCHEDULE
NUMBER NAME
FLOOR
FINISH BASE FINISH
WALL CEILING
COMMENTSNORTH SOUTH EAST WEST FINISH
CEILING
HEIGHT
002 WALLS - DON'T DELETE
100 VESTIBULE WCPT-1 VB-1 SGPNT-1 SGPNT-1 BRICK BRICK GB-1 10'-0"
101 ENTRY CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1/BRICK - SGPNT-5 ACT-3 16'-4"
102 AIRFIELD OPS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"
102A SDO CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"
103 FLIGHT SCHEDULING CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"
104 (E) COMM ROOM LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1
105 TRAINING OFFICER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"
106 TECH ORDER LIBRARY CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
107 STAN/EVAL OFF & TEST CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-3 16'-4"
108 ARMS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
109 CORR CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-3 16'-4"
110 CORR CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 - SGPNT-1 ACT-3 16'-4"
111 SQ. OPS. AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"
112 SQ. OPS AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"
113 SQ. OPS. AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"
114 CURRENT OPERATIONS STAFF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 9'-0"
115 CORR EPX-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-3 16'-4"
116 FLIGHT COMMANDERS A, B AND C CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"
116B OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 9'-0"
117 CSS CPT-1/CPT-2 VB-1 - SGPNT-1 SGPNT-1 SGPNT-1 EXP-1/ACT-3 VARIES
118 GROUP COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 10'-0"
119 CONFERENCE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
120 REFUEL COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
121 CORR CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 -- ACT-3 16'-4"
122 DIRECTOR OF OPS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 GB-1/ACT-1 VARIES
123 CHIEF BOOM OPERATOR/GROUP SUPER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 GB-1/ACT-1 VARIES
124 OSS COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 GB-1/ACT-1 VARIES
125 STORES CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
126 ORDERLY CPT-1/CPT-2 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-3 VARIES
127 FIELD REP CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"
128 FLIGHT PLANNING CPT-1 VB-1 PNT-5 PNT-1 PNT-1 PNT-1 ACT-1 9'-0"
129 CORR EPX-1 VB-1 SGPNT-1 BB-1/SGPNT-1 BB-1 SGPNT-1 ACT-3 16'-4"
130 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"
130A EQUIPMENT PLATFORM SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-2 C
131 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"
132 MALE LOCKER CT-1 CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 ACT-2 8'-0"
133 MALE SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 8'-0"
134 DINING-READY RM LVT-1 VB-1 SGPNT-1 SGPNT-5 SGPNT-1 SGPNT-1 ACT-1 10'-0"
135 KITCHEN LVT-1 VB-1 PNT-1 -- PNT-1 BB-1 ACT-1 10'-0"
136 DOOR GUARD LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
137 CREW BUNK 01 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"
138 CREW BUNK 02 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"
139 CREW BUNK 03 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"
140 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
141 CREW BUNK 04 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"
142 CREW BUNK 05 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"
143 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
144 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"
145 UNISEX SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"
146 FEMALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"
147 PASSENGER SERVICE LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
148 LACTATION LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
149 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
150 STORES LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
151 UNISEX CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"
152 UNISEX CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"
153 SUPERINTENDENT LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
154 SECURE VESTIBULE WCPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 BB-1 ACT-1 10'-0"
155 CORR EPX-1 VB-1 SGPNT-1 BB-1 SGPNT-1 BB-1 GB-1 VARIES
156 AUDITORIUM CPT-3/SC-1 VB-1 SGPNT-1/AWP-2 SGPNT-1/VDF SGPNT-1/AWP-1 SGPNT-1/AWP-1 ACT-1 14'-9" F
156A AUDITORIUM OPEN AREA CPT-3 VB-1 -- SGPNT-1/VDF SGPNT-1 SGPNT-1 GB-1 11'-0"
157 CORR EPX-1 VB-1 SGPNT-1 PL-3 BB-1 SGPNT-1/PL-3 GB-1 10'-8"
158 COMM. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
159 AV SC-1 VB-2 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
160 CORR EPX-1/EPX-2 VB-2 BB-1 PL-3 BB-1/VWC-1 PL-3 GB-1 VARIES
161 CORR. EPX-1 VB-2 -- BB-1 BB-1/VWC-1 MS-1 GB-1 VARIES
162 HOTELING LVT-1 VB-2 PNT-1 PNT-1 MS-1 WP-1 PERF-1 10'-6"
163 ALCOVE EPX-1 VB-2 SGPNT-1 -- SGPNT-1 SGPNT-1 ACT-1 9'-0"
164 VEST. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"
165 SECURE CORR. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 9'-0"
166 SECURE CORR EPX-1/EPX-2 VB-1 SGPNT-1/VWC-2 SGPNT-1/VWC-2 SGPNT-1/VWC-2 SGPNT-1/VWC-2 GB-1 VARIES B
167 CLASSIFIED MAIN BRIEFING LVT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"
168 COMM. LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
169 XP OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
170 WING PLANS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
171 MISSION PLANNING OFFICER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"
172 INTEL CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
173 TRAP CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
173A PASSAGE CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1/VWC-3 SGPNT-1 EXP-1/ACT-1 VARIES
174 KITCHEN CT-1 CT-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0"
175 TOILET CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 10'-0"
176 CP MANAGERS/ ADMIN CPT-1 VB-1 VWC-5 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES
177 GLOBAL ASNT EQUIPMENT ROOM SC/VAF VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1 A
178 TRAINING CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 EXP-1/ACT-1 VARIES
179 LOCKER BREAK AREA CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1/ACT-1 VARIES
180 EA CELL CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0" A, G
181 CRISIS ACTION TEAM CPT-1 VB-1 PNT-1 PNT-1 PNT-1 WP-1 ACT-1 10'-6"
182 SECURE CORR. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 7'-11 3/8"
183 INTEL SECURE OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES
184 TOILET CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 9'-0"
185 TRAP CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"
186 SSR CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES
187 SECURE STORAGE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 9'-0"
188 COMBAT CREW COMMS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"
189 ELECT. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
190 COMM. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
191 INTEL SECURED CPT-1 VB-1 PNT-1 VWC-5 PNT-1 PNT-1 EXP-1/ACT-1 VARIES
192 AIR CREW FLT. OFFICES CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 12'-0"
193 LAUNDRY/WASH ROOM/VAC LIGHT LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0"
194 SEWING LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"
195 MECH SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
196 ELECT SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
198 BOSS OFF. LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-5 SGPNT-1 ACT-1 9'-3"
198A ALCOVE LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-3"
198B BOSS VEST LVT-1 VB-1 PNT-1 PNT-1 PNT-1 -- ACT-1 8'-8"
199 BOSS EXISTING
VCT
EXISTING VB VWC-4/SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EACT 12'-0" D, E
200 FLOTATION ROOM LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-6"
201 JANITOR SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
202 CSEL RADIO TRAINIING TO LIBRARY LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
203 COMBINED AIRCREW MOBILITY STORAGE SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
203A COMBINED AIRCREW MOBILITY STORAGE SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
204 AIR CREW FLT. OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"
205 CORR LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-6"
206 VEST WCPT VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 9'-0"
206A EQUIPMENT PLATFORM SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-2 C
207 FEMALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-0"
208 FEMALE LATRINE ENTRY CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"
209 FEMALE LOCKER CT-1 CT-3 PNT-1/CT-3 PNT-1/CT-3 PNT-1/CT-3 PNT-1/CT-3 ACT-2 8'-8"
210 FEMALE SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 8'-8"
211 NCOIC CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"
212 SUPERINTENDENT CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 10'-0"
213 HELMET O2 MASK REPAIR CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"
214 MOBILE ASNT SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1
SCALE: 12" = 1'-0"1
Floor Transition Detail
EPOXY - LVT
SCALE: 12" = 1'-0"2
Floor Transition Detail
EPOXY - SC
SCALE: 12" = 1'-0"3
Flooring Transition Detail
EPOXY - CT/CPT
SCALE: 12" = 1'-0"4
Flooring Transition Detail
LVT - CT
SCALE: 12" = 1'-0"5
Floor Transition Detail-
CPT-SC
SCALE: 12" = 1'-0"6
Floor Transition Detail
CPT/ LVT
SCALE: 12" = 1'-0"7
Floor Transition Detail
CT-EPX
SCALE: 3" = 1'-0"8
Shower Floor Detail
ACCESSIBLE
SCALE: 1 1/2" = 1'-0"15
ACCESS FLOORING DETAIL @ 6" MTL
STUD- SOUND CONTROL WALL
SCALE: 12" = 1'-0"13
Floor Transition Detail -
MARBLE THRESHOLD
(SHOWER ENTRY)
SCALE: 1 1/2" = 1'-0"14
ACCESS FLOORING EACH
SIDE @ 3 5/8" MTL STUD
WALL
SCALE: 12" = 1'-0"9
Floor Transition Detail
SC-EPX
SCALE: 12" = 1'-0"10
Floor Transition Detail
CT-CPT
SCALE: 12" = 1'-0"11
Floor Transition Detail
SC-LVT
SCALE: 12" = 1'-0"12
Floor Transition Detail
LVT-VCT
REV. NO. DATE
04 8/3/2021
File details come from the government source that posted it. Updated .