This solicitation is for a firm fixed-price construction contract to renovate Building 254, Squadron Operations, at the 185th Air Refueling Wing of the Iowa Air National Guard base in Sioux City, Iowa. The scope of work includes renovating office spaces, classrooms, restrooms, locker rooms, common areas, and storage spaces; upgrading 1,600 square feet to sensitive compartmented information facility standards; replacing the HVAC system; upgrading electrical and communications systems; constructing a 2,300 square foot dual use Alert Facility; and repairing rooms for the Global Aircrew Strategic Network Terminal. The contract duration is 365 days after notice to proceed, and the magnitude of construction is estimated between $5 million and $10 million. Supporting documentation includes building plans, specifications divided into parts, and facility assessment forms addressing architectural, mechanical, electrical, plumbing, civil, and structural systems.

View the file

Other files

File Type Posted
W912LP-21-B-0001_OF 1419 Abstract of Offers - Construction.pdf PDF
W912LP-21-B-0001-0007.pdf PDF
Questions and Answers v7 - FINAL.pdf PDF
W912LP-21-B-0001_Attachment_9_2013008.11 Sqd Ops Bldg 254 - Addendum #004.pdf PDF
W912LP-21-B-0001-0006.pdf PDF
Questions and Answers v6.pdf PDF
Questions and Answers v5.pdf PDF
W912LP-21-B-0001_Attachment_8_Building 254 Auto Sprinkler Layout_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1a_Bldg_254_Plans_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1d_Specifications_Part_3_DIV_26-33_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_1b_Specifications_Part_1_DIV_1-13_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_6_2013008.11SqdOpsBldg254-Addendum#002-2021-07-21_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_2c_AF-Form-66-Bldg_254_Civil_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_2a_AF-Form-66-Bldg_254_Arch-Struct_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_2b_AF-Form-66-Bldg_254_MEP_re-upload.xlsx XLSX spreadsheet
W912LP-21-B-0001_Attachment_1c_Specifications_Part_2_DIV_21-23_re-upload.pdf PDF
W912LP-21-B-0001_Attachment_7_2013008.11 Sqd Ops Bldg 254 - Addendum #003_re-upload.pdf PDF
Questions and Answers v4.pdf PDF
W912LP-21-B-0001-0005.pdf PDF
W912LP-21-B-0001-0004.pdf PDF
Questions and Answers v3.pdf PDF
VSSB192001 Pre-bid Conference Minutes.pdf PDF
W912LP-21-B-0001-0003.pdf PDF
VSSB192001 Pre-bid Conference Slides.pdf PDF
Questions and Answers v2.pdf PDF
W912LP-21-B-0001-0002.pdf PDF
W912LP-21-B-0001_Attachment_5_INSTRUCTIONS_TO_REQUEST_PLANS_AND_SPECS.pdf PDF
W912LP-21-B-0001-0001.pdf PDF
Questions and Answers v1.pdf PDF
W912LP-21-B-0001_Project_VSSB192001.pdf PDF
W912LP-21-B-0001_Attachment_3_JA_Brand_Name-Keying_System_Redacted.pdf PDF
W912LP-21-B-0001_Attachment_4_Contractor-Visitor_Access_Request.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate Squadron Operations Building 254 Addendum No. 005

Project Location August 03, 2021

FEH Project No. 2013008.11 Page 1 of 3

6 0 4 E A S T G R A N D A V E N U E

D E S M O I N E S, I O W A 50 3 0 9

5 1 5 2 8 8 2 0 00

ADDENDUM NO. 005

Renovate Squadron Operations Building 254

185th ARW, Sioux Gateway Airport

BG Bud Day Field

Sioux City, IA 51111-1300

Project No: VSSB192001

Architect’s File No. 2013008.11

FEH DESIGN

604 East Grand Avenue

PHONE (515) 288-2000

FAX (515) 288-1999

DATE ISSUED: August 03, 2021

TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:

This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and any previously issued Addendums. Portions of the Addendum affected the Contract

Documents will be incorporated into the Contract by enumeration of the Addenda in the Owner/Contractor

Agreement.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum forms a part of the Bidding Documents.

GENERAL and ADMINISTRATIVE ITEMS

1. Clarification: FEH DESIGN did not provide an “ADDENDUM #001”. FEH DESIGN Addendums start with “Addendum #002”.

REFER TO PROJECT MANUAL

1. 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

a. Article 1.2-A.-2.: Delete the word “blast”.

FEH Project No. 2013008.11 Page 2 of 3

5 1 5 2 8 8 2 0 00

b. Article 1.4.: After “12 December 2018” add the words “Change 1, 19 August 2020”.

c. Article 3.2-A.-5.a.: Delete the words “blast mitigation”.

d. Article 1.5.C.: Delete article and all sub-paragraphs 1 thru 4. Replace with the following”

“C. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.

“1. Frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:

“a) For laminated glass, the frame shall meet bite requirements indicated in

Glazing Specifications with the laminated pane utilizing adhesive glazing tape.

The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.

“2. Exterior doors: All exterior doors shall open outwards and the doors shall seat into the door frames in response to an explosive blast.

e. Article 2.9-A: Change to: Color Anodic Finish: AAMA 611, AA-M12C22A42/A44, CLASS 1,

0.018 MM or thicker. Color: Dark Bronze

2. 08 51 13 ALUMINUM WINDOWS

a. Article 1.2-B.: Delete the word “blast”.

b. Article 1.5.C.: Delete entire paragraph and sub-paragraphs 1 thru 3.

c. ADD Article 1.4.F. as additional performance requirements.

“F. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.

“1. Frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:

“a) For laminated glass, the frame shall meet bite requirements indicated in

Glazing Specifications with the laminated pane utilizing adhesive glazing tape.

The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.

3. 08 80 00 - GLAZING

a. Article 1.2-A.4.: After “12 December 2018” add the words “Change 1, 19 August 2020”.

FEH Project No. 2013008.11 Page 3 of 3

5 1 5 2 8 8 2 0 00

b. Article 3.2-A.4: Delete the word “blast”.

c. ADD Article 1.4.C. as additional performance requirements.

“C. System shall meet UFC 04-010-01 Performance Requirements, 12 December 2018, Change 1, 19 August 2020 for conventional construction within a controlled perimeter for existing facility. No blast pressure design required for existing facilities.

“1. Glazing in frames receiving glazing shall be in compliance with this UFC standard & is not required to be designed or constructed for blast resistance. It is only intended to minimize hazardous glazing fragments. Apply the following prescriptive requirements:

“a) For laminated glass, the frame & glazing shall meet bite requirements indicated in Glazing Specifications with the laminated pane utilizing adhesive glazing tape. The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.

4. 10 51 23 PLASTIC LAMINATE LOCKERS

a. Add Article 2.5-B.: Protective Mats: 1/8-inch- (3-mm-) thick, solid rubber.

5. 10 71 13 EXTERIOR SUN CONTROL DEVICES

a. Article 1.2-A.: Delete entire article (no UFC requirements or “Blast” requirements.

REFER TO DRAWINGS

1. Sheet A7.5:

a. Interior Elevations 3, 4,5 & 6: Delete reference to “ABI #2” at lockers. Clarification: All lockers in these elevations are Base Bid. There are no Additive Bid Items or Alternate Items.

b. Keynotes Legend (Upper Right Corner): At Keynote 10 51 23.A1: Delete reference to “ABI

#2”.

2. Sheet A9.2:

a. Change ceilings and floor finishes as indicated with revision clouds.

ATTACHMENTS

1. Sheet A9.2: Room Finish Schedule, Details

ROOM FINISH NOTES

1. TELECOMMUNICATION CABLES: ALL DATA CABLINE (INCLUDING

CONCEALED, IN CABLE TRAYS OR ABOVE CEILINGS) SHALL BE PROTECTED

FROM PAINT OVERSPRAY OR INSTALLED AFTER PAINTING - COORDINATE

WITH OTHER TRADES. PAINT ON DATA CABLING VOIDS THECABLE WARRANTY.

ANY DATA CABLING WITH PAINT ON THEM SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

2. FINISHES FOR CLOSETS AND AREAS NOT SHOWN SHALL RECEIVE THE

SAME FINISH TO THAT OF THE ADJACENT ROOM U.N.O..

3. ELECTRICAL PANELS AND ACCESS DOOR PANELS SHALL BE PRIMED AND

PAINTED TO MATCH ADJACENT WALLS (VERIFY WITH OWNER).

4. CONCRETE FLOORS THAT ARE NOT SCHEDULED FOR A FINISH FLOOR

MATERIAL SHALL RECEIVE SEALER PER THE PROJECT MANUAL.

CONCRETE FLOORS ARE TO BE CLEANED OF ALL FOREIGN MATERIAL PRIOR

TO THE APPLICATION OF THE SEALER.

5. PROVIDE EXPANSION JOINTS AT ALL SLAB EDGES AGAINST EXTERIOR

WALLS. REFER TO STRUCTURAL.

6. SLOPE INTERIOR FLOOR SLAB TO DRAIN AT 1/8" PER FOOT WHERE SLOPED

SLABS ARE INDICATED, U.N.O.

7. FLOOR SLAB TO BE SLOPED DOWN AROUND DRAINS WHERE FLOOR SLAB

IS NOT INDICATED TO BE SLOPED, EXCEPT IN RESTROOMS WITH TILE. IN

RESTROOMS WITH TILE, INSTALL DRAIN TO BE FLUSH WITH ADJACENT

FLOOR TILE. REFER TO MECHANICAL DRAWINGS FOR ALL FLOOR DRAINS.

8. FLOOR DRAINS AND TRENCH DRAINS INDICATED FOR LOCATION AND

CONFIGURATION ONLY, REFER TO MECHANICAL DRAWINGS FOR PRODUCT

AND PIPING INFORMATION.

9. JOINT LAYOUT LOCATIONS SHOWN ARE FOR BIDDING PURPOSES ONLY.

VERIFY LAYOUT / LOCATIONS WITH ARCHITECT PRIOR TO BEGINNING WORK

AND SUBMIT JOINT LAYOUT DRAWING FOR APPROVAL.

10. VERIFY WALL AND FLOOR TILE PATTERN LAYOUT WITH ARCHITECT PRIOR

TO BEGINNING WORK.

11. TILE JOINTS (BOTH ON WALL AND FLOOR) ARE TO ALIGN WITH MASONRY

JOINTS ON WALL. WHERE TILE JOINTS DO NOT ALIGN WITH THAT OF CMU, CUT

TILES AT MIDDLE OF THE RUN OR AT THE DOOR, OR AS SHOWN ON FLOOR

FINISH PLANS. IF DISCREPANCY IS FOUND, CONTACT ARCHITECT BEFORE

LAYING TILE.

12. ALL FLOOR FINISH TRANSITIONS TO BE LOCATED UNDER DOOR

CENTERLINES, U.N.O.

13. PAINT ENTIRE WALL FROM FINISHED FLOOR TO STRUCTURE ABOVE AT

AREAS WHERE CEILING DOES NOT MEET THE WALL.

A. PARTIAL AREA OF FLOOR HAS RAISED ACCESS PANELS; VINYL FLOOR FINISH

B. GRAPHIC WRAPS AROUND BULKHEAD

C. PAINT CATWALK GUARD RAILS

D. EXISTING CEILING GRID TO REMAIN

E. ROOM OCCUPIED DURING CONSTRUCTION

F. SEE INTERIOR ELEVATIONS FOR ACOUSTICAL WALL PANELS (AWP)

G. CARPET TILE OVER RAISED ACCESS FLOOR PREFINISHED VINYL.

ROOM FINISH COMMENTS

ROOM FINISH SCHEDULE LEGEND

CPT CARPET TILE

CT CERAMIC TILE

LVT LUXURY VINYL TILE

EPX EPOXY FLOORING

SC SEALED CONCRETE

VCT VINYL COMPOSITION TILE

WCPT WALK-OFF CARPET TILE

VAF VINYL ACCESS FLOORING

FLOORS

ACT ACOUSTICAL CEILING TILE

EACT EXISTING GRID WITH NEW CEILING TILE

EXP-2 EXPOSED STRUCTURE, NO PAINT

EXP-1 EXPOSED STRUCTURE, PAINT

GB GYPSUM BOARD, PAINT

EGB GYPSUM BOARD, EPOXY PAINT

CEILINGWALL

CT CERAMIC TILE

PNT PAINT

SGPNT SEMI-GLOSS PAINT

MS MILD STEEL

BB BURNISHED BLOCK

VWC VINYL WALLCOVERING

AWP ACOUSTIC WALL PANELS

WP WALL WOOD COMPOSITE PANELING

VDF VISUAL DISPLAY FABRIC (DRY ERASE)

PL PLASTIC LAMINATE WOOD PANELING

BRICK BRICK VENEER

(NOTE: NUMER BEHIND WALL FINISH

REFERENCES MATERIAL COLORS - SEE SPEC)

CT CERAMIC TILE BASE

VB VINYL BASE

BASE

Epoxy

Metal Floor Transition

Luxury Vinyl Tile

Metal Edge Termination

Epoxy

Metal Floor Transition

Sealed Concrete

Metal Edge Termination Ceramic Tile or Carpet Tile

Metal Edge Termination

Epoxy Luxury Vinyl Tile

Vinyl Floor Transition

Ceramic Tile

Sealed Concrete

Vinyl Floor Transition

Carpet Tile

VINYL FLOOR

TRANSITION EDGE;

PROVIDE AT ALL

CARPETING

EXPOSED EDGESCARPET TILE

CERAMIC TILE

1/4" X 1/2" ALUMINUM

EDGE ANGLE

CL OF DOOR

EPOXY QUARTZ

BUILD UP EPOXY QUARTS

TO MEET CT THICKNESS

FLOOR TILE; SEE FLOOR FINISH

PLAN; SEE SPECIFICATIONS

/4

1" 3" 1"

MARBLE/ SOLID

SURFACE THRESHOLD

5/8"

5/8"

6" 5/8"

5/8"

ACOUSTICAL SEALANT

Within Controlled SideWithin Controlled Side

BOTH SIDES

3 5/8" METAL RUNNER

RAISED ACCESS FLOORINGRAISED ACCESS FLOORING

5/8" GYPSUM WALLBOARD

5/8" GYPSUM WALLBOARD

6" METAL STUD FRAMING

ACOUSTICAL BATT INSULATION

SEE ROOM FINISH SCHEDULE FOR

FLOOR FINISH

4" RESILIENT BASE

PEDESTAL SUPPORT FOR RAISED

ACCESS FLOORING

4" RESILIENT BASE

ACOUSTICAL SEALANT - INSTALL

BETWEEN FLOOR SLAB & STUD

RUNNER FLOOR TRACK.

SEE ROOM FINISH SCHEDULE FOR

FLOOR FINISH

P L A

N

S E

E

8 1/2"

1"1"

/3

5 1/4"

09 30 00.04

09 30 00.01

09 30 00.01

SHOWER SIDE -

SLOPE DOWN TO

DRAIN

Within Controlled Side

S E

E P

L A

N

RAISED ACCESS FLOORING

SEE ROOM FINISH SCHEDULE FOR

FLOOR FINISH

PEDESTAL SUPPORT FOR RAISED

ACCESS FLOORING

METAL CLOSURE ANGLE BY RAISED

ACCESS FLOR MANUFACTURER

ACOUSTICAL SEALANT - INSTALL

BETWEEN FLOOR AND BOTH

LAYERS GYPSUM BOARD WALL

PANEL; BOTH SIDES OF WALL.

WEST WALL

ROOM 177

EXISTING OR

NEW CONCRETE

SLAB - SEE

STRUCTURAL

EXISTING OR

NEW CONCRETE

FOUNDATION WALL -

SEE STRUCTURAL

CL OF DOOR

EPOXY QUARTZ

EPOXY QUARTS TO MEET

SEALED CONCRETE SURFACE

CUT CONCRETE

SEALED CONCRETE

/3

3"

CERAMIC TILE

CRACK ISOLATION

MEMBRANE/ WATER

PROOF MEMBRANE

METAL TRANSITION STRIP

CARPET TILE

LUXURY VINYL TILE RESILIENT TRANSITION

SEALED CONCRETE

VINYL FLOOR

TRANSITION

LUXURY VINYL TILE

VCT

O M

A H

A L

IN

C

O L N

D

E S

M O

IN

E

S C

O L O

R A

D O

S P

R

IN

G S

F A

R R

IS

E

N G

IN

E

E R

IN

G fa rr is -u s a .c o m

S

IO

U X

C

IT

Y

IA

(7 -3

D E

S M

O

IN

E S

IA

(5 -2

F E

H D

E S

IG

N

.C O

M

F E

H D

E S

IG

N

S H

E E

T T

IT

L E

P R

O J E

C T T

IT

L E

DATE ISSUED

PROJECT NUMBER

SHEET

IN

A

S S

O C

IA

T

IO

N W

IT

H

O C

O N

O M

O W

O C

W

I

(2 -2

D U

B U

Q U

E

IA

(5 -4

8/3/2021 10:51:47 AM

C U s e rs

\j a s o n c \D o c u m e n ts

\2

.1

S Q

O P

S B ld g

R ja s o n c L L

J W

C .r v t

A9.2

2013008.11

30 JULY 2021

S Q

U A

D R

O N

O P

E R

A T

IO

N S

B U

IL

D

IN

G

T H

A R

W S

IO

U

X G

A T E

W A

Y A

IR

P

O R

T B

G B

U D

D A

Y F

IE

L D

S

IO

U

X C

IT

Y

IA

R O

O M

F

IN

IS

H

S C

H E

D U

L E

D

E T A

IL

S

IO

W

A A

IR

N

A T

IO

N A

L G

U A

R D

V

S S

B

ROOM FINISH SCHEDULE

NUMBER NAME

FLOOR

FINISH BASE FINISH

WALL CEILING

COMMENTSNORTH SOUTH EAST WEST FINISH

CEILING

HEIGHT

002 WALLS - DON'T DELETE

100 VESTIBULE WCPT-1 VB-1 SGPNT-1 SGPNT-1 BRICK BRICK GB-1 10'-0"

101 ENTRY CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1/BRICK - SGPNT-5 ACT-3 16'-4"

102 AIRFIELD OPS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"

102A SDO CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"

103 FLIGHT SCHEDULING CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"

104 (E) COMM ROOM LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1

105 TRAINING OFFICER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"

106 TECH ORDER LIBRARY CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

107 STAN/EVAL OFF & TEST CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-3 16'-4"

108 ARMS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

109 CORR CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-3 16'-4"

110 CORR CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 - SGPNT-1 ACT-3 16'-4"

111 SQ. OPS. AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"

112 SQ. OPS AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"

113 SQ. OPS. AIRCREW BRIEF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"

114 CURRENT OPERATIONS STAFF CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 9'-0"

115 CORR EPX-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-3 16'-4"

116 FLIGHT COMMANDERS A, B AND C CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"

116B OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 9'-0"

117 CSS CPT-1/CPT-2 VB-1 - SGPNT-1 SGPNT-1 SGPNT-1 EXP-1/ACT-3 VARIES

118 GROUP COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 10'-0"

119 CONFERENCE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

120 REFUEL COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

121 CORR CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 -- ACT-3 16'-4"

122 DIRECTOR OF OPS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 GB-1/ACT-1 VARIES

123 CHIEF BOOM OPERATOR/GROUP SUPER CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 GB-1/ACT-1 VARIES

124 OSS COMMANDER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 GB-1/ACT-1 VARIES

125 STORES CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

126 ORDERLY CPT-1/CPT-2 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-3 VARIES

127 FIELD REP CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"

128 FLIGHT PLANNING CPT-1 VB-1 PNT-5 PNT-1 PNT-1 PNT-1 ACT-1 9'-0"

129 CORR EPX-1 VB-1 SGPNT-1 BB-1/SGPNT-1 BB-1 SGPNT-1 ACT-3 16'-4"

130 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"

130A EQUIPMENT PLATFORM SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-2 C

131 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"

132 MALE LOCKER CT-1 CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 SGPNT-1/CT-3 ACT-2 8'-0"

133 MALE SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 8'-0"

134 DINING-READY RM LVT-1 VB-1 SGPNT-1 SGPNT-5 SGPNT-1 SGPNT-1 ACT-1 10'-0"

135 KITCHEN LVT-1 VB-1 PNT-1 -- PNT-1 BB-1 ACT-1 10'-0"

136 DOOR GUARD LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

137 CREW BUNK 01 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"

138 CREW BUNK 02 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"

139 CREW BUNK 03 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"

140 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

141 CREW BUNK 04 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"

142 CREW BUNK 05 CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 GB-1 10'-0"

143 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

144 MALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"

145 UNISEX SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"

146 FEMALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"

147 PASSENGER SERVICE LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

148 LACTATION LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

149 HALL LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

150 STORES LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

151 UNISEX CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"

152 UNISEX CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 10'-0"

153 SUPERINTENDENT LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

154 SECURE VESTIBULE WCPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 BB-1 ACT-1 10'-0"

155 CORR EPX-1 VB-1 SGPNT-1 BB-1 SGPNT-1 BB-1 GB-1 VARIES

156 AUDITORIUM CPT-3/SC-1 VB-1 SGPNT-1/AWP-2 SGPNT-1/VDF SGPNT-1/AWP-1 SGPNT-1/AWP-1 ACT-1 14'-9" F

156A AUDITORIUM OPEN AREA CPT-3 VB-1 -- SGPNT-1/VDF SGPNT-1 SGPNT-1 GB-1 11'-0"

157 CORR EPX-1 VB-1 SGPNT-1 PL-3 BB-1 SGPNT-1/PL-3 GB-1 10'-8"

158 COMM. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

159 AV SC-1 VB-2 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

160 CORR EPX-1/EPX-2 VB-2 BB-1 PL-3 BB-1/VWC-1 PL-3 GB-1 VARIES

161 CORR. EPX-1 VB-2 -- BB-1 BB-1/VWC-1 MS-1 GB-1 VARIES

162 HOTELING LVT-1 VB-2 PNT-1 PNT-1 MS-1 WP-1 PERF-1 10'-6"

163 ALCOVE EPX-1 VB-2 SGPNT-1 -- SGPNT-1 SGPNT-1 ACT-1 9'-0"

164 VEST. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"

165 SECURE CORR. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 9'-0"

166 SECURE CORR EPX-1/EPX-2 VB-1 SGPNT-1/VWC-2 SGPNT-1/VWC-2 SGPNT-1/VWC-2 SGPNT-1/VWC-2 GB-1 VARIES B

167 CLASSIFIED MAIN BRIEFING LVT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-6"

168 COMM. LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

169 XP OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

170 WING PLANS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

171 MISSION PLANNING OFFICER CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"

172 INTEL CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

173 TRAP CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

173A PASSAGE CPT-1/CPT-2 VB-1 SGPNT-1 SGPNT-1 SGPNT-1/VWC-3 SGPNT-1 EXP-1/ACT-1 VARIES

174 KITCHEN CT-1 CT-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0"

175 TOILET CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 10'-0"

176 CP MANAGERS/ ADMIN CPT-1 VB-1 VWC-5 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES

177 GLOBAL ASNT EQUIPMENT ROOM SC/VAF VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1 A

178 TRAINING CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 EXP-1/ACT-1 VARIES

179 LOCKER BREAK AREA CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1/ACT-1 VARIES

180 EA CELL CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0" A, G

181 CRISIS ACTION TEAM CPT-1 VB-1 PNT-1 PNT-1 PNT-1 WP-1 ACT-1 10'-6"

182 SECURE CORR. EPX-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 7'-11 3/8"

183 INTEL SECURE OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES

184 TOILET CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 9'-0"

185 TRAP CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"

186 SSR CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXP-1/ACT-1 VARIES

187 SECURE STORAGE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 9'-0"

188 COMBAT CREW COMMS CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-6"

189 ELECT. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

190 COMM. SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

191 INTEL SECURED CPT-1 VB-1 PNT-1 VWC-5 PNT-1 PNT-1 EXP-1/ACT-1 VARIES

192 AIR CREW FLT. OFFICES CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 12'-0"

193 LAUNDRY/WASH ROOM/VAC LIGHT LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-0"

194 SEWING LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-0"

195 MECH SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

196 ELECT SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

198 BOSS OFF. LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-5 SGPNT-1 ACT-1 9'-3"

198A ALCOVE LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 9'-3"

198B BOSS VEST LVT-1 VB-1 PNT-1 PNT-1 PNT-1 -- ACT-1 8'-8"

199 BOSS EXISTING

VCT

EXISTING VB VWC-4/SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EACT 12'-0" D, E

200 FLOTATION ROOM LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-6"

201 JANITOR SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

202 CSEL RADIO TRAINIING TO LIBRARY LVT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

203 COMBINED AIRCREW MOBILITY STORAGE SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

203A COMBINED AIRCREW MOBILITY STORAGE SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

204 AIR CREW FLT. OFFICE CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 10'-0"

205 CORR LVT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 12'-6"

206 VEST WCPT VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 GB-1 9'-0"

206A EQUIPMENT PLATFORM SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-2 C

207 FEMALE LATRINE CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-0"

208 FEMALE LATRINE ENTRY CT-1 CT-3 CT-3 CT-3 CT-3 CT-3 ACT-2 8'-8"

209 FEMALE LOCKER CT-1 CT-3 PNT-1/CT-3 PNT-1/CT-3 PNT-1/CT-3 PNT-1/CT-3 ACT-2 8'-8"

210 FEMALE SHOWER CT-1/CT-2 CT-3 CT-3 CT-3 CT-3 CT-3 EGB-2 8'-8"

211 NCOIC CPT-1 VB-1 PNT-1 PNT-1 PNT-5 PNT-1 ACT-1 10'-0"

212 SUPERINTENDENT CPT-1 VB-1 PNT-1 PNT-1 PNT-1 PNT-5 ACT-1 10'-0"

213 HELMET O2 MASK REPAIR CPT-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 ACT-1 10'-0"

214 MOBILE ASNT SC-1 VB-1 SGPNT-1 SGPNT-1 SGPNT-1 SGPNT-1 EXP-1

SCALE: 12" = 1'-0"1

Floor Transition Detail

EPOXY - LVT

SCALE: 12" = 1'-0"2

Floor Transition Detail

EPOXY - SC

SCALE: 12" = 1'-0"3

Flooring Transition Detail

EPOXY - CT/CPT

SCALE: 12" = 1'-0"4

Flooring Transition Detail

LVT - CT

SCALE: 12" = 1'-0"5

Floor Transition Detail-

CPT-SC

SCALE: 12" = 1'-0"6

Floor Transition Detail

CPT/ LVT

SCALE: 12" = 1'-0"7

Floor Transition Detail

CT-EPX

SCALE: 3" = 1'-0"8

Shower Floor Detail

ACCESSIBLE

SCALE: 1 1/2" = 1'-0"15

ACCESS FLOORING DETAIL @ 6" MTL

STUD- SOUND CONTROL WALL

SCALE: 12" = 1'-0"13

Floor Transition Detail -

MARBLE THRESHOLD

(SHOWER ENTRY)

SCALE: 1 1/2" = 1'-0"14

ACCESS FLOORING EACH

SIDE @ 3 5/8" MTL STUD

WALL

SCALE: 12" = 1'-0"9

Floor Transition Detail

SC-EPX

SCALE: 12" = 1'-0"10

Floor Transition Detail

CT-CPT

SCALE: 12" = 1'-0"11

Floor Transition Detail

SC-LVT

SCALE: 12" = 1'-0"12

Floor Transition Detail

LVT-VCT

REV. NO. DATE

04 8/3/2021

File details come from the government source that posted it. Updated .