KC-46 Landing Gear PBL

Closed Solicitation Posted

Solicitation number
SPRHA1-26-R-4646
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Defense Logistics Agency Aviation is soliciting for remanufacture and overhaul support of KC-46 landing gear depot-level repairables, with proposals due August 27, 2026. This is a single-award small business set-aside under NAICS 336413, foreclosing competition outside that pool.

Work is performed at Tinker Air Logistics Complex in Oklahoma. The contract is a 5-year basic period with a 5-year option period (10 years total) structured as a requirements-type contract with firm fixed pricing. The contractor must meet an Exchange Lead Time (ELT) of 82 days for complete shipsets (75 days remanufacture plus 7 days transportation) and Remanufacture Turn Around Time (RTAT) of 90 days for individual subcomponents, with at least 25 percent of subcomponent quantities delivered within RTAT and additional 25 percent increments every 30 days thereafter. Notional annual demand is 15 landing gear shipsets, though quantities fluctuate based on failure rates and available Air Force funding.

The contractor must hold a Title 14 CFR Part 145 Certified Repair Station rated for 767 landing gear and achieve AS9110 certification prior to award, with allowance for submission of a comprehensive pre-award certification plan if not currently held. All remanufacturing work must comply with applicable Component Maintenance Manuals, 14 CFR Part 43, and FAA standards. The contractor is responsible for furnishing all Contractor Furnished Material (CFM); Government Furnished Material (GFM) is available only as a last resort when the Contracting Officer determines it serves the government's best interest. The contractor must provide detailed facility layouts, equipment identification, sourcing plans, parts control programs compliant with SAE AS9110, transition plans with staffing ramp-up schedules, process flow charts, and Supply Chain Risk Management plans addressing continuity of operations and cybersecurity per NIST SP 800-171. Proposals must include extensive reporting through 22 Contract Data Requirements Lists covering monthly progress, Structural Safe Life Limited Parts tracking, Commercial Asset Visibility-Air Force system reporting within 24 hours, and failure analysis.

Evaluation uses tradeoff source selection with Technical factors (Sub-factors: Remanufacture Capability and Capacity; Exchange Lead Time for 767-300F shipsets; Remanufacture Turn Around Time for sub-components) and Past Performance (Acceptable/Unacceptable rating based on recency within five years, relevancy, and quality) being significantly more important than Price. Proposals must be submitted electronically via DoD SAFE in four volumes: Technical (150 pages maximum), Price (unlimited), Past Performance (30 pages maximum), and Contract Documentation (unlimited). The RFP originally opened February 11, 2026 and closed July 28, but Amendment 0006 extended the deadline to August 27. The contracting officer is Kyle Swaner, kyle.swaner@us.af.mil, (385) 591-8732. The NAICS code is 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, with a small business size standard of 1,250 employees; the PSC code is 1620, Aircraft Landing Gear Components.

Notice text

13 versions

Update #13 · Latest ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/30/2026 UPDATE: Updated RFP Q&A Added to Attachments

05/13/2026 UPDATE: Amendment 0005 has been issued to update the TRD Main and TRD Appendix A to include use of O&A part procedures for subcomponent overhauls as well as establish a process for reimbursement of actual costs incurred prior to a BER determinations. The amendment also incorporates by reference FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION 2026O0040,REVISION 1)(APR 2026). See SPRHA1-26-R-4646 0005 and updated TRD documents in the Attachments.

06/08/2026 UPDATE: Updated RFP Q&A Added to Attachments

07/08/2026 UPDATE: Amendment 0006 has been issued to extend the proposal submission deadline to August 27, 2026, 4:00 PM MT. Additionally, the RFP Q&A has been updated. Please see both SPRHA1-26-R-4646 0006 and RFP Q&A in the Attachments

08/20/2026 UPDATE: Updated RFP Q&A Added to Attachments

Update #12 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/30/2026 UPDATE: Updated RFP Q&A Added to Attachments

05/13/2026 UPDATE: Amendment 0005 has been issued to update the TRD Main and TRD Appendix A to include use of O&A part procedures for subcomponent overhauls as well as establish a process for reimbursement of actual costs incurred prior to a BER determinations. The amendment also incorporates by reference FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION 2026O0040,REVISION 1)(APR 2026). See SPRHA1-26-R-4646 0005 and updated TRD documents in the Attachments.

06/08/2026 UPDATE: Updated RFP Q&A Added to Attachments

07/08/2026 UPDATE: Amendment 0006 has been issued to extend the proposal submission deadline to August 27, 2026, 4:00 PM MT. Additionally, the RFP Q&A has been updated. Please see both SPRHA1-26-R-4646 0006 and RFP Q&A in the Attachments

Update #11 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/30/2026 UPDATE: Updated RFP Q&A Added to Attachments

05/13/2026 UPDATE: Amendment 0005 has been issued to update the TRD Main and TRD Appendix A to include use of O&A part procedures for subcomponent overhauls as well as establish a process for reimbursement of actual costs incurred prior to a BER determinations. The amendment also incorporates by reference FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION 2026O0040,REVISION 1)(APR 2026). See SPRHA1-26-R-4646 0005 and updated TRD documents in the Attachments.

06/08/2026 UPDATE: Updated RFP Q&A Added to Attachments

Update #10 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/30/2026 UPDATE: Updated RFP Q&A Added to Attachments

05/13/2026 UPDATE: Amendment 0005 has been issued to update the TRD Main and TRD Appendix A to include use of O&A part procedures for subcomponent overhauls as well as establish a process for reimbursement of actual costs incurred prior to a BER determinations. The amendment also incorporates by reference FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION 2026O0040,REVISION 1)(APR 2026). See SPRHA1-26-R-4646 0005 and updated TRD documents in the Attachments.

Update #9 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/30/2026 UPDATE: Updated RFP Q&A Added to Attachments

Update #8 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

04/17/2026 UPDATE: Amendment 0004 has been issued to clarify requirements in sections L & M related to AS9110 certification. See SPRHA1-26-R-4646 0004 in Attachments. Updated RFP Q&A has also been added to Attachments.

Update #7 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

04/07/2026 UPDATE: Amendment 0003 has been issued to correct attachment KC46 LGPBL APPENDIX C Remanufacturing Requirements. The update to the attachment corrects the reference in section 2.4.2 to correctly identify TRD Main paragraph 3.15.3, instead of 3.16.3. Updated RFP Q&A has also been added to Attachments.

Update #6 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

3/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.

Update #5 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments

Update #4 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments

Update #3 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments.

Update #2 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

02/10/2026 UPDATE: RFP Q&A Added to Attachments

Update #1 ·

Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products.

This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years.

There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside.

The RFP is anticipated to be active from February 11, 2026 through July 28, 2026.

The required scope and items covered are outlined in the RFP and attachments.

Files

File Type Posted
KC-46 Landing Gear PBL - RFP QA 8.20.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 7.8.26.pdf PDF
SPRHA1-26-R-4646 0006.pdf PDF
KC-46 Landing Gear PBL - RFP QA 6.8.26.pdf PDF
KC-46 LGPBL - APPENDIX A - Supply Chain and Program Management (5-12-2026).pdf PDF
SPRHA1-26-R-4646 0005.pdf PDF
KC-46 LGPBL - TRD Main (5-12-2026).pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.30.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.17.26.pdf PDF
SPRHA1-26-R-4646 0004.pdf PDF
SPRHA1-26-R-4646 0003.pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.7.26.pdf PDF
KC-46 LGPBL - APPENDIX C - Remanufacturing Requirements (4-7-2026).pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.23.26.pdf PDF
SPRHA1-26-R-4646 0002.pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.6.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.4.26.pdf PDF
SPRHA1-26-R-4646 0001.pdf PDF
KC-46 Landing Gear PBL - RFP QA 2.10.26.pdf PDF
01 - KC-46 LG PBL NSN List (Attachment 1).xlsx XLSX spreadsheet
08 - Past Performance Client Auth Ltr (Attachment 8).docx DOCX document
KC-46 LGPBL - TRD Main.pdf PDF
KC-46 LGPBL - APPENDIX A - Supply Chain and Program Management .pdf PDF
KC-46 LGPBL - APPENDIX C - Remanufacturing Requirements.pdf PDF
02- PMRT Workbook (Attachment 2).xlsx XLSX spreadsheet
03 - SSLLP Disassembly Tracking (Attachment 3).xlsx XLSX spreadsheet
07 - Past Performance Consent Letter (Attachment 7).docx DOCX document
09 - Past Performance Questionnaire (Attachment 9).docx DOCX document
10 - Past Performance Information Sheet (Attachment 10).docx DOCX document
KC-46 LGPBL - APPENDIX B - Performance Metrics Reconciliation.pdf PDF
KC-46 LGPBL CDRL Portfolio.pdf PDF
SPRHA1-26-R-4646.pdf PDF
KC-46 LGPBL - APPENDIX D - Acronyms Forms and Definitions.pdf PDF
04 - SSLLP Assembly Tracking (Attachment 4).xlsx XLSX spreadsheet
05 - KC-46 TCI Schedule (Attachment 5).xlsx XLSX spreadsheet
06 - KC-46 LG TEP - (Attachment 6).xlsx XLSX spreadsheet
11 - Team Roles and Responsibilities (Attachment 11).xlsx XLSX spreadsheet
12 - Process Steps For Parts Beyond CMM Repairability (Attachment 12).docx DOCX document
13 - GFM and Instructions (Attachment 13).docx DOCX document
14 - KC-46 LG PBL CDRL Listing and Matrix (Contractor) (Attachment 14).xlsx XLSX spreadsheet
Show all 40

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
KC-46 Landing Gear PBL Pre-Solicitation
DRAFT RFP - KC-46 Landing Gear PBL Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
FINAL RFP - Landing Gear Collaborative Supply Chain Integration II United States · NAICS 336413 Aviation Total Small Business
Remanufacture of KC-135 Gearbox Assembly, NSN 1680007986073FL Tinker AFB, Oklahoma, United States · NAICS 336413 Air Force Sustainment Center Total Small Business
KC-135 Center Console Refresh (CCR) Revision 2 Tinker AFB, Oklahoma 73145, United States · NAICS 336413 AFLCMC Tinker AFB No set-aside
W58RGZ-26-B-0004 Amendment 0004 OVERHAUL/UPGRADE LANDING GEAR FIXED United States · NAICS 336413 ACC Redstone Total Small Business
ELECTRONIC COMPONENT_End_Item_KC-46_NSN_5998016537482KT_PN_285T0049-65 NAICS 336413 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity