11 - Team Roles and Responsibilities (Attachment 11).xlsx

XLSX spreadsheet 20 KB Posted

Attached to
KC-46 Landing Gear PBL
Solicitation number
SPRHA1-26-R-4646
Issued by

About this file

This is an attachment template for submitting team roles and responsibilities in response to the KC-46 Landing Gear Performance Based Logistics (PBL) solicitation (SPRHA1-26-R-4646) issued by the Defense Logistics Agency Aviation. The template requires contractors to identify all participating team members and their organizational information, including business size (large or small), CAGE Code, and DUNS Number for both prime contractors and subcontractors.

Contractors must mark their participation across three technical evaluation sub-factors: Remanufacture Capability and Capacity, Exchange Lead Time (for shipsets), and Remanufacture Turn Around Time (for sub-components). The template clarifies that only contractors participating in a particular sub-factor will be evaluated for that sub-factor. Respondents must save the completed Excel file using their company name and submit it as part of their proposal in accordance with Section M 2.3.5 of the RFP. The solicitation is a single-award small business set-aside with an anticipated active period from February 11, 2026 through July 28, 2026, seeking remanufacture and overhaul support for KC-46 Landing Gear Depot Level Repairables to meet programmed Time Change Intervals and field-level demands under a 5-year basic period with a 5-year option period.

View the file

Other files

File Type Posted
KC-46 Landing Gear PBL - RFP QA 8.20.26.pdf PDF
SPRHA1-26-R-4646 0006.pdf PDF
KC-46 Landing Gear PBL - RFP QA 7.8.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 6.8.26.pdf PDF
KC-46 LGPBL - APPENDIX A - Supply Chain and Program Management (5-12-2026).pdf PDF
SPRHA1-26-R-4646 0005.pdf PDF
KC-46 LGPBL - TRD Main (5-12-2026).pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.30.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.17.26.pdf PDF
SPRHA1-26-R-4646 0004.pdf PDF
SPRHA1-26-R-4646 0003.pdf PDF
KC-46 Landing Gear PBL - RFP QA 4.7.26.pdf PDF
KC-46 LGPBL - APPENDIX C - Remanufacturing Requirements (4-7-2026).pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.23.26.pdf PDF
SPRHA1-26-R-4646 0002.pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.6.26.pdf PDF
KC-46 Landing Gear PBL - RFP QA 3.4.26.pdf PDF
SPRHA1-26-R-4646 0001.pdf PDF
KC-46 Landing Gear PBL - RFP QA 2.10.26.pdf PDF
01 - KC-46 LG PBL NSN List (Attachment 1).xlsx XLSX spreadsheet
08 - Past Performance Client Auth Ltr (Attachment 8).docx DOCX document
KC-46 LGPBL - TRD Main.pdf PDF
KC-46 LGPBL - APPENDIX A - Supply Chain and Program Management .pdf PDF
KC-46 LGPBL - APPENDIX C - Remanufacturing Requirements.pdf PDF
02- PMRT Workbook (Attachment 2).xlsx XLSX spreadsheet
03 - SSLLP Disassembly Tracking (Attachment 3).xlsx XLSX spreadsheet
07 - Past Performance Consent Letter (Attachment 7).docx DOCX document
09 - Past Performance Questionnaire (Attachment 9).docx DOCX document
10 - Past Performance Information Sheet (Attachment 10).docx DOCX document
SPRHA1-26-R-4646.pdf PDF
KC-46 LGPBL - APPENDIX D - Acronyms Forms and Definitions.pdf PDF
04 - SSLLP Assembly Tracking (Attachment 4).xlsx XLSX spreadsheet
05 - KC-46 TCI Schedule (Attachment 5).xlsx XLSX spreadsheet
06 - KC-46 LG TEP - (Attachment 6).xlsx XLSX spreadsheet
12 - Process Steps For Parts Beyond CMM Repairability (Attachment 12).docx DOCX document
13 - GFM and Instructions (Attachment 13).docx DOCX document
14 - KC-46 LG PBL CDRL Listing and Matrix (Contractor) (Attachment 14).xlsx XLSX spreadsheet
KC-46 LGPBL - APPENDIX B - Performance Metrics Reconciliation.pdf PDF
KC-46 LGPBL CDRL Portfolio.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TEAM LIST, ROLES AND RESPONSIBILITIES -

Factor One Technical
TeamSub-factor 1: Remanufacture Capability and CapacitySub-factor 2: Exchange Lead Time (ELT, Shipsets)Sub-factor 3: Remanufacture Turn Around Time (RTAT, Sub-Components)Business Size (Large or Small)Cage CodeDUNS Number
(Prime Contractor/Joint Venture)
(Team Member)
(Team Member)
(Team Member)
(Team Member)
(Team Member)
Instructions: Please clarify the roles and responsibilities of each team member (as defined in Section M 2.3.5) participating in your proposal for the KC-46 LG PBL solicitation (SPRHA1-26-R-4646) by typing the name of each participating company in the appropriate column in the table above. Then mark an "X" for each subfactor that they will be participating in on this contract. Contractors not participating in a particular sub-factor will not be evaluated for that subfactor. Also include the Business Size, Cage Code, and DUNS Number for each as per the headings in the table. Please save the Excel file as your company name (e.g. ABCInc.xls). See example below.
TeamSub-factor 1: EngineeringSub-factor 2: Program ManagementSub-factor 3: Order FulfillmentBusiness Size (Large or Small)Cage CodeDUNS Number
ABC, Inc.XXXSmallXXXXXXXXXXXX
XYZ, Inc.XXXLargeXXXXXXXXXXXX
LMNOP, Inc.XSmallXXXXXXXXXXXX
HIJK, Inc.XSmallXXXXXXXXXXXX
(Subcontractor)
(Subcontractor)

&KFF0000Date: 3 May 2017

Example

File details come from the government source that posted it. Updated .