SPRHA1-26-R-4646 0005.pdf
PDF 115 KB Posted
- Attached to
- KC-46 Landing Gear PBL
- Solicitation number
- SPRHA1-26-R-4646
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the KC-46 Landing Gear Performance Based Logistics (PBL) contract.
The amendment, numbered SPRHA1-26-R-4646-0005 and effective May 13, 2026, modifies solicitation SPRHA126R4646 (dated February 11, 2026) issued by DLA Aviation at Hill Air Force Base, Utah. The amendment makes three substantive changes to the contract requirements. First, it updates the KC-46 LGPBL Technical Requirements Document (TRD) Main sections 3.8 and 3.8.2 to permit Outside and Additional (O&A) parts procedures to apply to both shipsets and subcomponent overhauls, enabling contractors to claim reimbursement for repair or replacement of O&A parts outside of Contractor Maintenance Manual (CMM) requirements separately from the Fixed Price Proposal (FFP) in the Technical Evaluation Plan (TEP). Second, it updates KC-46 LGPBL Appendix A—Supply Chain and Program Management section 8.0 to expand O&A language to include subcomponent overhauls and adds provisions for contractor reimbursement of actual costs incurred prior to the Best Estimate of Repair (BER) determination. Third, the amendment incorporates by reference FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (Deviation 2026-O0040, Revision 1, April 2026). The amendment does not extend the offer receipt date, and offerors must acknowledge receipt of the amendment using one of three specified methods before the solicitation deadline or risk rejection.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NUMBER
PAGE OF PAGES
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE
(X)
4. REQUISITION/PURCHASE REQUISITION NUMBER3. EFFECTIVE DATE
1. CONTRACT ID CODE
SPRHA1-26-R-4646-0005
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
BUYER: Kyle Swaner/DLA kyle.swaner@us.af.mil Phone: (385) 591- 8732
SPRHA1
13 MAY 2026 FD20202600030 KC-46 Landing Gear PBL
X
SPRHA126R4646
11-FEB-2026
X X
X 1
ROUTINE
SPRHA1-26-R-4646-0005
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to do the following:
1) Update attachment: KC46 LGPBL TRD Main.
a. This update makes changes to sections 3.8 and 3.8.2 to allow O&A parts procedures to apply to both the shipsets and subcomponent overhauls. This removes potential challenges to providing a FFP PPE for the subcomponents by allowing for the additional repair or replacement of the O&A parts (outside of CMM requirements) within the subcomponents to be paid for outside of the FFP proposed in the TEP.
2) Update attachment: KC46 LGPBL APPENDIX A – Supply Chain and Program Management.
a. This update makes changes to section 8.0 to update the O&A language to be inclusive of subcomponent overhauls.
b. This update also adds language to provide an avenue for reimbursement of work performed by the contractor for actual costs incurred prior to the BER determination.
See attachments for updated TRD Main and TRD Appendix A.
3) Incorporate by reference into the solicitation: FAR 52.22290 Addressing DEI Discrimination by Federal Contractors
(DEVIATION 2026O0040, REVISION 1)(APR 2026)
All other terms and conditions remain unchanged.
SPRHA1-26-R-4646-0005
LIST OF DOCUMENTS, EXHIBITS OR ATTACHMENTS
Form Number Description/File Name Date Number of Pages KC-46 LGPBL - TRD Main (5-12-2026) 12MAY2026 15
KC-46 LGPBL - APPENDIX A - Supply Chain and Program Management (5-12-2026)
12MAY2026 15
File details come from the government source that posted it. Updated .