GRCA 318719_Temporary WWTP at North Rim

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140P2026R0075
Agency
National Office National Park Service, Department of the Interior
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Y1NE Construction Of Water Supply Facilities
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service seeks installation of a temporary wastewater treatment plant (WWTP) at North Rim, Grand Canyon National Park, with proposals due July 29, 2026 and questions due July 10. This is a Small Business Set-Aside requiring a lump-sum bid with a base contract value of $14 million and an optional $2 million line item, totaling $16 million with all options.

Place of performance is North Rim, Grand Canyon National Park, Arizona. The 420-calendar-day performance period begins September 30, 2026 and must conclude with Arizona Department of Environmental Quality operational approval by June 1, 2027, with liquidated damages of $3,517 per calendar day for delays beyond that date. The work comprises five contract line items: Site Work and Utilities ($8.5 million), Storage Container ($500,000), One Membrane Package Treatment ($2 million), Startup, Commissioning, Operations and Winterization ($1.75 million), and End-of-Season Tank Pumping and Biosolids Removal ($1.25 million), with an optional second Membrane Package ($2 million).

The NAICS code is 237110, Water and Sewer Line and Related Structures Construction; PSC is Y1NE, Construction of Water Supply Facilities. The facility processes wastewater at 60,000 gallons per day average flow through screening, equalization, membrane bioreactor treatment (two 11,600-gallon units rated 45,000 GPD each), UV disinfection, and lift stations. Specifications require a 56-foot modular laboratory trailer, two 40-foot refurbished chemical storage containers with HVAC, electrical systems with Ethernet TCP/IP communications, and multiple subsystem controllers without a central SCADA requirement. All work must comply with prevailing wage rates under Davis-Bacon Act authority (Arizona General Decision AZ20260056, dated May 18, 2026). Contractor personnel require no specific security clearances. Tree removal is restricted to September 1 through March 31 for bird protection; work hours are 6 a.m. to 6 p.m. Monday through Friday, and State Route 67 is typically impassable December 7, 2026 through April 1. A pre-bid site visit was held June 23, 2026. Amendments through July 22 have incorporated design revisions, geotechnical reports, and updated electrical and lightning protection specifications.

Notice text

GRCA 318719_Installation of Temp WWTP

Attachments

Files attached to this notice, newest first
File Type Posted
GRCA_318719_NR_TWWTP_Spec_Addm_1_0006.pdf PDF
Sol_140P2026R0075_Amd_0006.pdf PDF
Other_Updates_22_July_2026_0006.pdf PDF
E602-E602_0006.pdf PDF
E601-E601_0006.pdf PDF
Solicitation_140P2026R0075_Temp_WWTP_Q_and_A_July_15__2026_0005.pdf PDF
Sol_140P2026R0075_Amd_0005.pdf PDF
Sol_140P2026R0075_Amd_0004.pdf PDF
Q_and_A_dated_July_10_2026_0004.pdf PDF
GRCA_318719_North_Rim_GIR_20250811_0004.pdf PDF
Sol_140P2026R0075_Amd_0003.pdf PDF
Pre_Bid_Site_Visit_June_23_2026_Attendee_List_0002.pdf PDF
Sol_140P2026R0075_Amd_0002.pdf PDF
GRCA_318719_Temporary_WWTP_Pre-Bid_Map_0001.pdf PDF
Sol_140P2026R0075_Amd_0001.pdf PDF
B08_Attach_05_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part3.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part1.pdf PDF
B08_Attach_03_AZ20260056_dated_May_18_2026.pdf PDF
B08_Attach_01_GRCA_318719_North_Rim_TWWTP_t_Project_Manual_20260610.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part2.pdf PDF
B08_140P2026R0075.pdf PDF
Sol_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part4.pdf PDF
B08_Attach_04_Contract_Price_Schedule_TWWTP_-_Blank_Only.xlsx XLSX spreadsheet
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 30

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Grca 318719 construct temp. Wwtp at nort Award Award Notice
GRCA 318719_Temporary WWTP at North Rim This notice · Latest solicitation Solicitation
GRCA 318719_Temporary WWTP at North Rim Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity