B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part2.pdf

PDF 40 MB Posted

Attached to
GRCA 318719_Temporary WWTP at North Rim Federal contract opportunity
Solicitation number
140P2026R0075
Issued by
Department of the Interior National Park Service National Office

About this file

This file is a set of construction design drawings and specifications for a Temporary Wastewater Treatment Plant (WWTP) at the North Rim, prepared by HDR Engineering, Inc. (Denver, CO) dated June 2026.

The document comprises civil and structural engineering sheets detailing the temporary WWTP facility design, including site survey control and potholing plans (sheets C101-C102), overall site layout and grading plans with erosion and sediment control (sheets C103-C105), comprehensive yard piping systems with 10-inch stainless steel components (sheets C106, C401-C402, C801-C802), and civil details addressing access, utilities, erosion control, and general construction requirements (sheets C501-C506). Additional sheets cover construction staging areas, helicopter staging zones, and trailer placement (sheet G106), along with structural general notes. The drawings include survey control point tables, grading point tables, plan and profile views of yard piping, and enlarged plan views for detailed construction reference. This appears to be the design basis documentation for the installation of temporary wastewater treatment infrastructure at the North Rim location under GRCA project 318719, managed by the National Park Service.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA 318719_Temporary WWTP at North Rim, newest first.
File Type Posted
GRCA_318719_NR_TWWTP_Spec_Addm_1_0006.pdf PDF
E601-E601_0006.pdf PDF
Sol_140P2026R0075_Amd_0006.pdf PDF
Other_Updates_22_July_2026_0006.pdf PDF
E602-E602_0006.pdf PDF
Solicitation_140P2026R0075_Temp_WWTP_Q_and_A_July_15__2026_0005.pdf PDF
Sol_140P2026R0075_Amd_0005.pdf PDF
GRCA_318719_North_Rim_GIR_20250811_0004.pdf PDF
Q_and_A_dated_July_10_2026_0004.pdf PDF
Sol_140P2026R0075_Amd_0004.pdf PDF
Sol_140P2026R0075_Amd_0003.pdf PDF
Pre_Bid_Site_Visit_June_23_2026_Attendee_List_0002.pdf PDF
Sol_140P2026R0075_Amd_0002.pdf PDF
Sol_140P2026R0075_Amd_0001.pdf PDF
GRCA_318719_Temporary_WWTP_Pre-Bid_Map_0001.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part3.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part1.pdf PDF
Sol_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part4.pdf PDF
B08_Attach_04_Contract_Price_Schedule_TWWTP_-_Blank_Only.xlsx XLSX spreadsheet
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_03_AZ20260056_dated_May_18_2026.pdf PDF
B08_Attach_01_GRCA_318719_North_Rim_TWWTP_t_Project_Manual_20260610.pdf PDF
B08_140P2026R0075.pdf PDF
B08_Attach_05_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRIME:

DENVER, CO 80202

HDR ENGINEERING, INC.

JUNE 2026JUNE 2026 7

E

E

E

E

TR

E

TR

E

E

JUNE 2026

PRIME:

DENVER, CO 80202

8 90

SURVEY NOTES:

DENVER, CO 80202

JUNE 2026 9 90

E

E

E

TR

E

TR

E

E

10 90JUNE 2026

PRIME:

E

E

E

TR

E

TR

E

E

SF

CF

SF

SF

SF

CF

CF

CF

SF

CF

SF

CF

PRIME:

DENVER, CO 80202

JUNE 2026 11 90

12 90JUNE 2026

E

E

E

TR

E

TR

E

E

PRIME:

DENVER, CO 80202

JUNE 2026 9013

TEMPORARY WASTEWATER TREATMENT PLANT
GENERAL SHEETS
G106 - NORTH RIM WWTP CONSTRUCTION TRAILERS & HELICOPTOR STAGING AREA I — — mg I — 1 L a— — A k I —— A k I V , k l k I A ==g . k I A I— A — I
CIVIL SHEETS
C101 - TEMPORARY WWTP OVERALL SURVEY CONTROL AND POTHOLING PLAN k I — —==g I — I k a. — A k I —. A k IV . k I k I A m=g . k I A I— A — I >
C102 - TEMPORARY WWTP SURVEY CONTOL AND POTHOLE POINT TABLES
C103 - TEMPORARY WWTP OVERALL SITE PLAN k I — —==ig l r, I k A — • Aki — . A k IX . k I k I A ==a . A I A I A ,, I >
C104 -TEMPORARY WWTP OVERALL GRADING AND GESC PLAN
C105 - TEMPORARY WWTP GRADING POINT TABLES k l . 1 I A 1 . — A , i, I _A e, . _A — A I J
C106 - TEMPORARY WWTP OVERALL YARD PIPING PLAN k i , —=. 1 — 1 _ 1 . _ — — AA- , _ _A e. . _A — A — I >
C401 - TEMPORARY WWTP YARD PIPING ENLARGED PLAN
C402 - TEMPORARY WWTP YARD PIPING ENLARGED PLAN
C501 - CIVIL DETAILS - ACCESS AND UTILITIES
C502 - CIVIL DETAILS - ACCESS AND UTILITIES
C503 - CIVIL DETAILS - GESC CONTINUED
C504 - CIVIL DETAILS - GESC CONTINUED
C505 - CIVIL DETAILS - GENERAL
C506 - CIVIL DETAILS
C801 - TEMPORARY WWTP YARD PIPING PLAN AND PROFILE 10” SS k l — —moi.g 1— 1 k 4. — Aki —. A k Ik . k I k I A ==a . A I A I — A — I >
C802 - TEMPORARY WWTP YARD PIPING PROFILES k I . —=== 1— I k J— — Aki —— A k Ik , k l k I A ==o . A I A I — A — I >
STRUCTURAL SHEETS
SOO1 - TEMPORARY WWTP STRUCTURAL GENERAL NOTES

File details come from the government source that posted it. Updated .