This document is an electrical single-line diagram for a temporary wastewater treatment facility (WWTP) located at North Rim, Grand Canyon National Park. The diagram illustrates the electrical distribution system and interconnections for the facility's power infrastructure.

The system receives incoming primary power at 24.49 kV from Garkane Energy and distributes it through an automatic transfer switch (ATS) to multiple load centers (MCB1, MCB3, and MCB4). The facility is equipped with a portable generator as backup power with cam lock-type connectors for temporary connections. Power is distributed to several critical components including two wastewater treatment pumps (TWWTP-1 and TWWTP-2) rated at approximately 125 full-load amperes at 480V three-phase, UV treatment units (UV Unit 1, 2, and 3), equipment loads (EQ) at approximately 30 FLA, and a wastewater laboratory panel. The cable schedule details 13 separate cable runs (identified as A through M) using PVC conduit ranging from 2 to 6 inches in diameter, with conductor sizes varying from #6 to 500 kCMIL aluminum URD cables depending on load requirements. General notes emphasize grounding electrode system requirements at every structure, proper cable termination at manufacturer-provided terminals, and disconnection procedures for the portable generator. The MCB1 load analysis indicates a total connected load of 748.9 kVA for the primary MCB1 distribution center.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA 318719_Temporary WWTP at North Rim, newest first.
File Type Posted
Sol_140P2026R0075_Amd_0006.pdf PDF
Other_Updates_22_July_2026_0006.pdf PDF
E602-E602_0006.pdf PDF
GRCA_318719_NR_TWWTP_Spec_Addm_1_0006.pdf PDF
Sol_140P2026R0075_Amd_0005.pdf PDF
Solicitation_140P2026R0075_Temp_WWTP_Q_and_A_July_15__2026_0005.pdf PDF
GRCA_318719_North_Rim_GIR_20250811_0004.pdf PDF
Q_and_A_dated_July_10_2026_0004.pdf PDF
Sol_140P2026R0075_Amd_0004.pdf PDF
Sol_140P2026R0075_Amd_0003.pdf PDF
Sol_140P2026R0075_Amd_0002.pdf PDF
Pre_Bid_Site_Visit_June_23_2026_Attendee_List_0002.pdf PDF
Sol_140P2026R0075_Amd_0001.pdf PDF
GRCA_318719_Temporary_WWTP_Pre-Bid_Map_0001.pdf PDF
Sol_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part4.pdf PDF
B08_Attach_04_Contract_Price_Schedule_TWWTP_-_Blank_Only.xlsx XLSX spreadsheet
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_03_AZ20260056_dated_May_18_2026.pdf PDF
B08_Attach_01_GRCA_318719_North_Rim_TWWTP_t_Project_Manual_20260610.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part2.pdf PDF
B08_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part3.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part1.pdf PDF
B08_Attach_05_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25KV 3PH JUNCTION ENCLOSURE.

(3) 4-POSITION JUNCTION BARS W/

200AMP ELBOW TERMINATIONS AND

200AMP PROTECTIVE CAPS

LA

TRANSFORMER - T1A

24.9kV - 480Y/277 V 5.75% Z 750 kVA

3-PH

100A 30A

ESB-13C

EXIST MEDIUM

VOLTAGE POWER TO WWTP

T-37

200A 3P

150A 3P

200A 3P

25A 3P

1000A 3P

150A 3P

60A 3P

MCB1

480/277 VAC

3Ø, 4W 1000A

NEMA 3R

65KAIC

TWWTP-1 ~125FLA

VOLTAGE:480/3

TWWTP-2 ~125FLA

VOLTAGE:480/3

EQ ~30 FLA

VOLTAGE:480/3

TO MCB4

HYPOCHLORITE / CAUSTIC

STORAGE CONTAINER

TO MCB3

CITRIC ROOM / MEMBRANE

STORAGE CONTAINER

WW LAB (T3B)

60A 3P

UV UNIT 1: PANEL LCP-5101

MTS

480V/3PH

3-POLE

1000AMPS

NEMA 3R

65KAIC

GEN

PORTABLE

GENERATOR

LINE A (N.P.S)

TO ESB-14

(NOT SHOWN)

EXIST 25KV 3PH POWER CABLE

250A 3P

UV UNIT 3: PANEL LCP-5301

60A 3P

UV UNIT 2: PANEL LCP-5201

1000AT

3PH

LSIGA

N

G

N

G

PER. MFR

LSIGA

N

G

T3B 150kVA DRY TYPE

480 - 208/120V

NEMA 3R WITH WEATHERSHIELDS

MANUFACTURER PROVIDED PANEL BOARD

208/120 VAC

3Ø, 4W 400A

WASTE WATER LAB

200A 3P

200A 3P

200A 3P

200A 3P

200A 3P

SURGE

ARRESTER

METER

CAM LOCK TYPE

RECEPTACLES

(MALE)

G

G

PORTABLE

CABLES WITH

CAM LOCK

CONNECTORS.

THREE PER

PHASE.

CAM LOCK TYPE

RECEPTACLES

(FEMALE)

ESB-13 ESB-12

PTS-2

SO

U

R C

E

TR

AN

SF

ER

C

O N

TR

O

L

N.C.

N.O.

N.C.

SPARE

25K PTS-2

SOURCE TRANSFER SWITCH

AT POWER DISTRIBUTION CENTER (PDC)

LINE C (N.P.S)

TO T-35

(NOT SHOWN)

TO T-36

GENERATION BUILDING

(NOT SHOWN)

TO MC-2

INCOMING GARKANE ENERGY PRIMARY 24.49KV POWER

(NOT SHOWN)

CABLE ID FROM TO CONDUIT CABLE

A ESB-13C T1A 6" PVC CONDUIT (3) 1/C 3/0 AL 133% URD CABLE W/ 1/3 CONC NEUTRAL

B T1A ATS 6" PVC CONDUIT 3 SETS [3#500kCMIL, #500kCMIL (N), #3/0 (G)]*

C ATS MCB1 6" PVC CONDUIT 3 SETS [3#500kCMIL, #500kCMIL (N), #3/0 (G)]*

D MCB1 MCB4 3" PVC CONDUIT 1 SET [3#4/0, #4/0 (N), #4 (G)]*

E MCB1 MCB3 3" PVC CONDUIT 1 SET [3#4/0, #4/0 (N), #4 (G)]*

F MCB1 EQ 2" PVC CONDUIT 1 SET [3#8, #8 (N), #6 (G)]*

G MCB1 TWWTP-1 2" PVC CONDUIT 1 SET [3#1/0, #1/0 (N), #6 (G)]*

H MCB1 TWWTP-2 2" PVC CONDUIT 1 SET [3#1/0, #1/0 (N), #6 (G)]*

I MCB1 T3B 3" PVC CONDUIT 1 SET [3#250, #4 (G)]*

J MCB1 UV UNIT 1 2" PVC CONDUIT 1 SET [3#6, #6 (N), #8 (G)]*

K MCB1 UV UNIT 2 2" PVC CONDUIT 1 SET [3#6, #6 (N), #8 (G)]*

L MCB1 UV UNIT 3 2" PVC CONDUIT 1 SET [3#6, #6 (N), #8 (G)]*

M T3B WW LAB PB 6" PVC CONDUIT 2 SETS [3#350kCMIL, #350kCMIL (N), #2/0 (G)]*

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text B

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

NORTH RIM - GRAND CANYON NATIONAL PARK

AutoCAD SHX Text

A/E FIRM

AutoCAD SHX Text

PRIME:

AutoCAD SHX Text

HDR ENGINEERING, INC.

AutoCAD SHX Text

PM: MATTHEW GOUGH

AutoCAD SHX Text

DENVER, CO

AutoCAD SHX Text

TEMPORARY WWTP

AutoCAD SHX Text

SINGLE LINE DIAGRAM 1

AutoCAD SHX Text

AutoCAD SHX Text 182752A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

T. VANG

AutoCAD SHX Text

T. VANG

AutoCAD SHX Text

T. MOORE

AutoCAD SHX Text

MAY 2026

AutoCAD SHX Text 318719

AutoCAD SHX Text E601

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text KEYNOTES: 1. TERMINATE POWER CABLES AT MANUFACTURER PROVIDED TERMINATE POWER CABLES AT MANUFACTURER PROVIDED TERMINAL BLOCKS. 2. TEMPORARY PORTABLE GENERATOR CONNECTION WITH CAM TEMPORARY PORTABLE GENERATOR CONNECTION WITH CAM LOCK TYPE CONNECTIONS. 3. 100% RATED BREAKER 100% RATED BREAKER 4. INTERCEPT EXISTING MEDIUM VOLTAGE POWER CABLE INTERCEPT EXISTING MEDIUM VOLTAGE POWER CABLE BETWEEN POWER DISTRIBUTION CENTER AND WWTP. SET 3PH JUNCTION ENCLOSURE. EXPOSE EXISTING MEDIUM VOLTAGE POWER CABLE AND REROUTE TO JUNCTION ENCLOSURE ESB-13C. TERMINATE WITH EXISTING POWER CABLE. 5. ABANDON EXISTING MEDIUM VOLTAGE POWER FROM ABANDON EXISTING MEDIUM VOLTAGE POWER FROM INTERCEPTION POINT TO WWTP. 6. MAIN BONDING JUMPER MAIN BONDING JUMPER 7. ALL GROUNDING JUMPER TO BE #4/0 UNLESS OTHERWISE ALL GROUNDING JUMPER TO BE #4/0 UNLESS OTHERWISE SHOWN. SEE DETAIL 3 ON SHEET E503 FOR GROUNDING ELECTRODE SYSTEM DETAIL. 8. DO NOT BOND NEUTRAL AND GROUND TOGETHER. DO NOT BOND NEUTRAL AND GROUND TOGETHER. 9. MAIN BONDING JUMPER.MAIN BONDING JUMPER.

AutoCAD SHX Text X

AutoCAD SHX Text

CABLE/CONDUIT SCHEDULE

AutoCAD SHX Text GENERAL NOTES 1. GROUNDING ELECTRODE SYSTEM IS REQUIRED AT EVERY GROUNDING ELECTRODE SYSTEM IS REQUIRED AT EVERY STRUCTURE AND BUILDING FED FROM MCBS. NEUTRAL IS NOT TO BE BONDED AT THE BUILDING GROUND.

AutoCAD SHX Text

NOTE: (* COPPER CONDUCTORS WITH XHHW-2 INSULATION)

AutoCAD SHX Text

JUNE 2026

AutoCAD SHX Text 7/20/2026 Vang, Tou C:\Users\TVANG\DC\ACCDocs\HDR\10350545_NPS_GRCA_N_Rim_Utility_2022\Project Files\CAD_HDR\DRAWINGS\TEMPORARY WASTEWATER\ELECTRICAL\E601-E602.dwg Vang, Tou C:\Users\TVANG\DC\ACCDocs\HDR\10350545_NPS_GRCA_N_Rim_Utility_2022\Project Files\CAD_HDR\DRAWINGS\TEMPORARY WASTEWATER\ELECTRICAL\E601-E602.dwgVang, Tou C:\Users\TVANG\DC\ACCDocs\HDR\10350545_NPS_GRCA_N_Rim_Utility_2022\Project Files\CAD_HDR\DRAWINGS\TEMPORARY WASTEWATER\ELECTRICAL\E601-E602.dwg C:\Users\TVANG\DC\ACCDocs\HDR\10350545_NPS_GRCA_N_Rim_Utility_2022\Project Files\CAD_HDR\DRAWINGS\TEMPORARY WASTEWATER\ELECTRICAL\E601-E602.dwgC:\Users\TVANG\DC\ACCDocs\HDR\10350545_NPS_GRCA_N_Rim_Utility_2022\Project Files\CAD_HDR\DRAWINGS\TEMPORARY WASTEWATER\ELECTRICAL\E601-E602.dwg

Sheets and Views
E601