B08_Attach_9_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf

PDF 97 KB Posted

Attached to
GRCA 318719_Temporary WWTP at North Rim Federal contract opportunity
Solicitation number
140P2026R0075
Issued by
Department of the Interior National Park Service National Office

About this file

This is a template form for proposing equal products in a federal solicitation. The document, part of the B08 Solicitation PSP Vol II, implements FAR Provision 52.211-06 (Section L) and allows contractors to propose substitute products or models as equals to those specified in the original solicitation. Contractors must complete a table identifying the section number, paragraph number, original product/model number, and proposed product/model number for each substitution.

By submitting a proposed equal, contractors certify five key commitments: (1) the proposed item is equal or superior in all respects to the specified salient characteristics; (2) warranties provided will be at minimum equivalent to those for the specified item; (3) the proposed item is compatible with interfacing items; (4) the contractor will coordinate installation and make all necessary changes required due to the substitution; and (5) the contractor waives all claims for additional expenses resulting from the substitution. The solicitation encourages contractors to propose products that exceed accessibility standards or are made from recycled or environmentally responsible materials, with commitment to approve such sustainable alternatives when submitted.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA 318719_Temporary WWTP at North Rim, newest first.
File Type Posted
GRCA_318719_NR_TWWTP_Spec_Addm_1_0006.pdf PDF
E601-E601_0006.pdf PDF
Sol_140P2026R0075_Amd_0006.pdf PDF
Other_Updates_22_July_2026_0006.pdf PDF
E602-E602_0006.pdf PDF
Solicitation_140P2026R0075_Temp_WWTP_Q_and_A_July_15__2026_0005.pdf PDF
Sol_140P2026R0075_Amd_0005.pdf PDF
GRCA_318719_North_Rim_GIR_20250811_0004.pdf PDF
Q_and_A_dated_July_10_2026_0004.pdf PDF
Sol_140P2026R0075_Amd_0004.pdf PDF
Sol_140P2026R0075_Amd_0003.pdf PDF
Pre_Bid_Site_Visit_June_23_2026_Attendee_List_0002.pdf PDF
Sol_140P2026R0075_Amd_0002.pdf PDF
Sol_140P2026R0075_Amd_0001.pdf PDF
GRCA_318719_Temporary_WWTP_Pre-Bid_Map_0001.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part3.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part1.pdf PDF
Sol_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part4.pdf PDF
B08_Attach_04_Contract_Price_Schedule_TWWTP_-_Blank_Only.xlsx XLSX spreadsheet
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_03_AZ20260056_dated_May_18_2026.pdf PDF
B08_Attach_01_GRCA_318719_North_Rim_TWWTP_t_Project_Manual_20260610.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part2.pdf PDF
B08_140P2026R0075.pdf PDF
B08_Attach_05_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B08 Solicitation PSP Vol II Equals v1 2025Feb

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No. Paragraph No.

Product/Model No. Proposed Product/Model No.

A. By submitting the proposed equal, the Contractor certifies that it:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to the specified Salient Characteristics;

2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified;

3. Has determined that the proposed item is compatible with interfacing items;

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution; and

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .