Other_Updates_22_July_2026_0006.pdf
PDF 40 KB Posted
- Attached to
- GRCA 318719_Temporary WWTP at North Rim Federal contract opportunity
- Solicitation number
- 140P2026R0075
About this file
This is a Questions and Answers document for Solicitation #140P2026R0075, GRCA 318719: Temporary Waste Water Treatment Plant, providing clarifications and updates to the contract specifications and drawings.
The document outlines multiple specification section updates and drawing revisions issued to address contractor questions and refine technical requirements. Key updates include: Specification Section 10 50 00 modified to change THHN to THWN wiring and update lightning protection wording; Specification Section 26 05 00 updated to replace ESB-21 with ESB-13C; Specification Section 26 05 33 revised to reduce applications to area designations only and clarify when Flex and Flex-LT conduits are used; Specification Section 26 05 43 modified to reference only handholes and remove conduit references; Specification Section 26 05 73 revised to reference only conduit and remove handholes references; Specification Section 26 41 13 updated with revised lightning protection requirements for the contractor; Specification Sections 33 32 13, 40 41 13, and 46 07 53 modified to add or clarify lightning protection wording; and Division 26 Electrical added as a referenced section in Specification Section 40 41 13. Additionally, Drawings E601 and E602 have been replaced. These updates collectively address electrical, conduit, drainage, and lightning protection specifications for the temporary waste water treatment plant project.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q Question Government Answer
Solicitation# 140P2026R0075 GRCA 318719: Temporary Waste Water Treatment Plant
Questions and Answers
Specification Section 26 05 73 - Replace with attached. Summar of Updates:
Remove any reference to the handholes. Content is only the conduit.
Specification Section 26 41 13 - Replace with attached. Summar of Updates:
Section 1.1.3, Updated lightening protection requirements of the Contractor.
Solicitation# 140P2026R0075 GRCA 318719: Temporary Waste Water Treatment Plant
Other Updates Update
Specification Section 10 50 00 - Replace with attached. Summar of Updates:
Section 2.6.C.4, THHN to THWN Section 2.6.D, Updated wording for lightning protection
Specification Section 26 05 00 - Replace with attached. Summar of Updates:
Section 3.3, Update ESB-21 to ESB-13C
Specification Section 26 05 33 - Replace with attached. Summar of Updates:
Section 3.3C, Reduce the applications to only the area designations.
Section 3.3E, Added clarification on when Flex conduits is used Section 3.3F, Added clarification on when Flex-LT conduits is used
Specification Section 26 05 43 - Replace with attached. Summar of Updates:
Remove any reference to the conduit. Content is only the handholes
Drawings: Replace Drawing E601 Drawings: Replace Drawing E602
Specification Section 33 32 13 - Replace with attached. Summar of Updates:
Section 2.3.H.5.K., Added wording for lightning protection
Specification Section 40 41 13 - Replace with attached. Summar of Updates:
Added Div 26 Electrical as a referenced section
Specification Section 46 07 53 - Replace with attached. Summar of Updates:
Section 1.6.Hl, Added wording for lightning protection
Sheet1