This is a Questions and Answers document for Solicitation #140P2026R0075, GRCA 318719: Temporary Waste Water Treatment Plant, providing clarifications and updates to the contract specifications and drawings.

The document outlines multiple specification section updates and drawing revisions issued to address contractor questions and refine technical requirements. Key updates include: Specification Section 10 50 00 modified to change THHN to THWN wiring and update lightning protection wording; Specification Section 26 05 00 updated to replace ESB-21 with ESB-13C; Specification Section 26 05 33 revised to reduce applications to area designations only and clarify when Flex and Flex-LT conduits are used; Specification Section 26 05 43 modified to reference only handholes and remove conduit references; Specification Section 26 05 73 revised to reference only conduit and remove handholes references; Specification Section 26 41 13 updated with revised lightning protection requirements for the contractor; Specification Sections 33 32 13, 40 41 13, and 46 07 53 modified to add or clarify lightning protection wording; and Division 26 Electrical added as a referenced section in Specification Section 40 41 13. Additionally, Drawings E601 and E602 have been replaced. These updates collectively address electrical, conduit, drainage, and lightning protection specifications for the temporary waste water treatment plant project.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA 318719_Temporary WWTP at North Rim, newest first.
File Type Posted
GRCA_318719_NR_TWWTP_Spec_Addm_1_0006.pdf PDF
Sol_140P2026R0075_Amd_0006.pdf PDF
E602-E602_0006.pdf PDF
E601-E601_0006.pdf PDF
Solicitation_140P2026R0075_Temp_WWTP_Q_and_A_July_15__2026_0005.pdf PDF
Sol_140P2026R0075_Amd_0005.pdf PDF
Q_and_A_dated_July_10_2026_0004.pdf PDF
Sol_140P2026R0075_Amd_0004.pdf PDF
GRCA_318719_North_Rim_GIR_20250811_0004.pdf PDF
Sol_140P2026R0075_Amd_0003.pdf PDF
Pre_Bid_Site_Visit_June_23_2026_Attendee_List_0002.pdf PDF
Sol_140P2026R0075_Amd_0002.pdf PDF
GRCA_318719_Temporary_WWTP_Pre-Bid_Map_0001.pdf PDF
Sol_140P2026R0075_Amd_0001.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part3.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part1.pdf PDF
B08_Attach_03_AZ20260056_dated_May_18_2026.pdf PDF
B08_Attach_01_GRCA_318719_North_Rim_TWWTP_t_Project_Manual_20260610.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part2.pdf PDF
B08_140P2026R0075.pdf PDF
B08_Attach_05_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Sol_140P2026R0075.pdf PDF
B08_Attach_02_GRCA_318719_NR_TWWTP_Final_CD_20260610_Part4.pdf PDF
B08_Attach_04_Contract_Price_Schedule_TWWTP_-_Blank_Only.xlsx XLSX spreadsheet
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q Question Government Answer

Solicitation# 140P2026R0075 GRCA 318719: Temporary Waste Water Treatment Plant

Questions and Answers

Specification Section 26 05 73 - Replace with attached. Summar of Updates:

Remove any reference to the handholes. Content is only the conduit.

Specification Section 26 41 13 - Replace with attached. Summar of Updates:

Section 1.1.3, Updated lightening protection requirements of the Contractor.

Solicitation# 140P2026R0075 GRCA 318719: Temporary Waste Water Treatment Plant

Other Updates Update

Specification Section 10 50 00 - Replace with attached. Summar of Updates:

Section 2.6.C.4, THHN to THWN Section 2.6.D, Updated wording for lightning protection

Specification Section 26 05 00 - Replace with attached. Summar of Updates:

Section 3.3, Update ESB-21 to ESB-13C

Specification Section 26 05 33 - Replace with attached. Summar of Updates:

Section 3.3C, Reduce the applications to only the area designations.

Section 3.3E, Added clarification on when Flex conduits is used Section 3.3F, Added clarification on when Flex-LT conduits is used

Specification Section 26 05 43 - Replace with attached. Summar of Updates:

Remove any reference to the conduit. Content is only the handholes

Drawings: Replace Drawing E601 Drawings: Replace Drawing E602

Specification Section 33 32 13 - Replace with attached. Summar of Updates:

Section 2.3.H.5.K., Added wording for lightning protection

Specification Section 40 41 13 - Replace with attached. Summar of Updates:

Added Div 26 Electrical as a referenced section

Specification Section 46 07 53 - Replace with attached. Summar of Updates: