DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
W31P4Q-20-R-0015
Agency
ACC Redstone Army Contracting Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336414 Guided Missile and Space Vehicle Manufacturing
PSC
1410 Guided Missiles
Place of performance
Redstone Arsenal, Alabama 35898, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This draft request for proposal from the Department of the Army Materiel Command Contracting Command seeks proposals for the Integrated Battle Command System Low Rate Initial Production/Full Rate Production hardware segment. The requirement includes producing IBCS hardware end items such as engagement operations centers and integrated fire control network relays according to supplied technical data packages and critical item development specifications. Offerors must also maintain approved software and firmware updates, cybersecurity, and authority to operate on existing hardware components. Engineering changes may be required for obsolescence, new capabilities, and export considerations. Evaluation criteria will assess technical maturity, production maturity, system synchronization and metrics, depot subcontractor management, small business participation, cost and price.

There is no set-aside designation specified. The main NAICS code is 336411 for aircraft manufacturing and the predominant PSC code is likely 1520 for aircraft, missile, and space vehicles equipment. Northrop Grumman is identified as the potential incumbent. The period of performance is five years with ordering periods established for pricing and the contract type will utilize fixed price incentive and cost reimbursement. First article inspections will be required and the most important evaluation factors are schedule followed by management and small business participation, with cost and price being significantly less important.

Notice text

This requirement is a Hardware production effort, but also requires maintaining approved software & firmware updates, cybersecurity, Authority to Operate, etc. on existing hardware components; as well as, any engineering changes executed in the performance period of this effort. This Integrated Battle Command System (IBCS)   Hardware Low Rate Initial Production/Full Rate Production (HW LRIP/FRP) segment is to produce the IBCS hardware end items in accordance with (IAW) the supplied Technical Data Packages and the Critical Item Development Specification (CIDS).Engineering changes may be required for obsolescence, new capabilities, and export considerations.  THIS IS A DRAFT RFP FOR COMMENT ONLY. THE GOVERNMENT IS NOT CURRENTLY SEEKING PROPOSALS BASED ON THE INFORMATION POSTED. DO NOT SUBMIT A PROPOSAL IN RESPONSE TO THIS POSTING.

Attachments

Files attached to this notice, newest first
File Type Posted
Attachment 21 - Task Order 0001 Statement of Work.docx DOCX document
Attachment 10c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 10a.16– R034 Media Converter Power Supply-FMECA.xlsx XLSX spreadsheet
W31P4Q-20-R-0015_DRAFT_28 May 2020.pdf PDF
Attachment 10a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 04b - Draft_Relay Acceptance Test Procedures.docx DOCX document
Attachment 13c - IBCS-A301-003 Vol II Instructor Guide.pdf PDF
Attachment 22a.1.f - EOC Shelter views.pptx PPTX presentation
Attachment 22a.1.d - ALH-213030 00 CABLE ASSEMBLY, CASS J1 AND J3.pdf PDF
Attachment 10a.14 – R032 Media Converter Module 11-FMECA.xlsx XLSX spreadsheet
Attachment 20 - Section M - Evaluation Factors For Award.docx DOCX document
Attachment 22a - CASS to PDRS.docx DOCX document
Attachment 10d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10e.10 – E148 – Table 4 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10e.5 – E122 – EMI Tent PDU-FMECA.xlsx XLSX spreadsheet
Attachment 17 - Pre-Award Survey Accounting System Checklist.pdf PDF
Attachment 22a.1.g - PL-ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 22a.1.e - ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 22a.4 - CASS Task Purpose.pptx PPTX presentation
Attachment 10a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 10c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 03 - GFP Attachment - LRIP_FRP - 20 April 2020.xlsx XLSX spreadsheet
Attachment 04 - Acceptance Test Plan.docx DOCX document
Attachment 10c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Attachment 10b.8 – E032 R112 Shelter – Server Stack – 02-FMECA.xlsx XLSX spreadsheet
Attachment 11- Cost Report and Plan.pdf PDF
Attachment 09 - R_M Predication Report.docx DOCX document
Attachment 10e.7 – E145 – Table 1 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 05 - Software Installation Instructions.docx DOCX document
Attachment 10a.10 – R016 thru R025 Media Converter Module-FMECA.xlsx XLSX spreadsheet
Attachment 10f - IBCS - 243-003 HW FMECA Results.docx DOCX document
Attachment 10e.3 – E092 thru E101 Wkstn Display-FMECA.xlsx XLSX spreadsheet
Attachment 10b.4 – E013 ADSI Shelter – Misc Equip-FMECA.xlsx XLSX spreadsheet
Attachment 10b.3 – E005 Blower Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 08 - AIAMD IUID Plan Appendix A - IUID Candidates List Data Items.pdf PDF
Attachment 10d.1 – E123 TMSS – ECU-FMECA.xlsx XLSX spreadsheet
Attachment 10c.11 – E061 Isolation Router Red-FMECA.xlsx XLSX spreadsheet
Attachment 10e.8 – E146 – Table 2 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10e.4 – E102d thru E111 Vid Extender-FMECA.xlsx XLSX spreadsheet
Attachment 01 - IBCS LRIP FRP Statement of Work.docx DOCX document
Attachment 10 - FMECA.docx DOCX document
Attachment 22a.1.c - ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 22a.2 - PDRS Support information for integration task.pptx PPTX presentation
Attachment 15b - Fixed Price Level of Effort Labor Categories.xlsx XLSX spreadsheet
Attachment 10h - SWFMEA RESULTS.xlsx XLSX spreadsheet
Attachment 22a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 04c - ECT_Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 22a.1.a - ALH-208670 05 IBCS SHELTER INTERCONNECT.pdf PDF
Attachment 10a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 13 - Training Documentation.docx DOCX document
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
RFP AMD 0007 for Integrated Battle Command System (IBCS) LRIP/FRP Latest solicitation Solicitation
RFP AMD 0006 for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
RFP AMD 0005 for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
Integrated Battle Command (IBCS) System Amendment 0004 Solicitation
RFP AMD 0003 for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
RFP AMD 0002 for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
RFP AMD 0001 for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
RFP for Integrated Battle Command System (IBCS) LRIP/FRP Solicitation
Integrated Battle Command (IBCS) System Pre-Solicitation
Integrated Battle Command (IBCS) System Pre-Solicitation
Integrated Battle Command (IBCS) System Pre-Solicitation
Integrated Battle Command (IBCS) System Pre-Solicitation
Industry Day for Integrated Battle Command (IBCS) System Pre-Solicitation
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP This notice Pre-Solicitation
Industry Day for Integrated Battle Command (IBCS) System Original Special Notice
Show all 15

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity