Attachment 10b.4 – E013 ADSI Shelter – Misc Equip-FMECA.xlsx

XLSX spreadsheet 11 MB Posted

Attached to
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP
Solicitation number
W31P4Q-20-R-0015
Issued by

About this file

This document contains a preliminary analysis for an Automated Digital Network System Interface (ADSI) used in a shelter for miscellaneous equipment. The analysis identifies 41 potential failure modes for ADSI components, listing the failure effect, detection method, and severity classification for each. Many failure modes are classified initially as Category I but reduced to Category III-1R due to redundancy between ADSI units. The modified conditional risk for all modes is 7.98E-04.

The related federal contract opportunity is a draft request for proposal for Low Rate Initial Production/Full Rate Production of the Integrated Battle Command System hardware. The Army Materiel Command is seeking to produce IBCS hardware in accordance with technical data packages and specifications, including engineering changes for obsolescence, new capabilities, and export. The RFP is posted for comment only and not currently soliciting proposals.

View the file

Other files

File Type Posted
Attachment 10h - SWFMEA RESULTS.xlsx XLSX spreadsheet
Attachment 10a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10b.9 – E033 R112 Shelter – Server Stack – 03-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.a - ALH-208670 05 IBCS SHELTER INTERCONNECT.pdf PDF
Attachment 22a - CASS to PDRS.docx DOCX document
Attachment 10c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 10a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.c - ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 20 - Section M - Evaluation Factors For Award.docx DOCX document
Attachment 10a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 10c.9 – E059 Shelter Switch – 01-FMECA.xlsx XLSX spreadsheet
Attachment 10a.2 – R002 BPU-FMECAAttachment 10b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10g - IBCS - 243-003 HW FMECA Results.pdf PDF
Attachment 22a.3 - S280_SystemPowerAnalysis_Draft_12-5-2017.xlsx XLSX spreadsheet
Attachment 10c.12 – E062 Shelter Router-Red-FMECA.xlsx XLSX spreadsheet
Attachment 10c.14 – E064 Shelter Router Black – FMECA.xlsx XLSX spreadsheet
Attachment 10d.2 – E144 RWS Bkup Batteries-FMECA.xlsx XLSX spreadsheet
Attachment 10b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 10c.16 – E069 Media Converter 03 - FMECA.xlsx XLSX spreadsheet
Attachment 10e.2 – E082 thru E091 Wkstn Laptop-FMECA.xlsx XLSX spreadsheet
Attachment 10d.4 – E151 – Media Converter 04-FMECA.xlsx XLSX spreadsheet
Attachment 10d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 13c - IBCS-A301-003 Vol II Instructor Guide.pdf PDF
Attachment 03 - GFP Attachment - LRIP_FRP - 20 April 2020.xlsx XLSX spreadsheet
Attachment 10a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 22a.2 - PDRS Support information for integration task.pptx PPTX presentation
Attachment 19 - Section L - Instructions - Conditions - And Notices To Offerors.docx DOCX document
Attachment 10c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.e - ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 04b - Draft_Relay Acceptance Test Procedures.docx DOCX document
Attachment 22a.1.f - EOC Shelter views.pptx PPTX presentation
Attachment 10c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 10b.7 – E031 R112 Shelter – Server Stack – 01-FEMCA.xlsx XLSX spreadsheet
Attachment 16 - Example Cage Code and Cognizant DCMA DCAA Information.xlsx XLSX spreadsheet
Attachment 13a -A293-004 ETM 60 Percent Draft.pdf PDF
Attachment 04a - Draft_EOC Acceptance Test Procedures.docx DOCX document
Attachment 10d.6 – E153 RS112 Server -05 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10d.8 – E153 RS112 Server -07 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10e.1 – E067 – EtherNet Switch-FMECA.xlsx XLSX spreadsheet
Attachment 06 - Obsolete Parts List.pdf PDF
Attachment 04c - ECT_Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 15a- Example Skill Classification Crosswalk.xlsx XLSX spreadsheet
Attachment 10c.3 – E048 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 10a.8 – R008 Media Converter Chassis-FMECA.xlsx XLSX spreadsheet
Attachment 10b.6 – E030 KVM Console-FMECA.xlsx XLSX spreadsheet
Attachment 21 - Task Order 0001 Statement of Work.docx DOCX document
Attachment 10a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.b - ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .