Attachment 10b.6 – E030 KVM Console-FMECA.xlsx
XLSX spreadsheet 11 MB Posted
- Attached to
- DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
- Solicitation number
- W31P4Q-20-R-0015
About this file
This document contains a preliminary analysis of potential failure modes for a KVM console component used in an integrated battle command system. The analysis identifies 17 potential failure modes for the component and estimates the criticality and severity of each. Failure modes include failure to operate at a prescribed time, faulty keyboard, short circuits, and under/over voltages. Severity classifications are determined, with most modes initially rated Category I or II. However, due to redundancy from emergency operation centers, the severity classifications are reduced to Category III-1R or III-2R. Compensating provisions and failure detection methods are identified. Modified failure probabilities are then calculated based on design modifications and redundancies.
This federal contract opportunity posting is a draft request for proposal for low rate initial production and full rate production of hardware for an integrated battle command system. The requirement involves maintaining approved software and firmware updates, cybersecurity, and authority to operate on existing hardware, as well as engineering changes. The opportunity is with the Department of the Army Materiel Command Contracting Command at Redstone Arsenal. Offerors are advised not to submit proposals in response to the draft RFP.
View the file
Other files for this federal contract opportunity
Show all 50
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .