Attachment 10d.8 – E153 RS112 Server -07 Shelter with PT-FMECA.xlsx

XLSX spreadsheet 11 MB Posted

Attached to
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
Solicitation number
W31P4Q-20-R-0015
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains an attachment to a Preliminary Failure Modes and Effects Criticality Analysis (PFMECA) for an Integrated Battle Command System (IBCS) hardware low rate initial production/full rate production effort. The PFMECA attachment provides details on potential failure modes for IBCS shelter components, failure effects, detection methods, severity classifications, and proposed design modifications to reduce risk. Failure modes addressed include open circuits, data loss, improper operation, poor air flow, electrical overstress, and more. Severity classifications are reduced from Category I to III-1R due to redundant emergency operation centers. The document also includes a draft request for proposal for the IBCS hardware LRIP/FRP segment to produce end items per supplied technical data packages and critical item development specification, including potential engineering changes for obsolescence, new capabilities, and export considerations.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
Attachment 22a.2 - PDRS Support information for integration task.pptx PPTX presentation
Attachment 15b - Fixed Price Level of Effort Labor Categories.xlsx XLSX spreadsheet
Attachment 10h - SWFMEA RESULTS.xlsx XLSX spreadsheet
Attachment 22a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 04c - ECT_Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 22a.1.a - ALH-208670 05 IBCS SHELTER INTERCONNECT.pdf PDF
Attachment 10a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 13 - Training Documentation.docx DOCX document
Attachment 10a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.j - PL-ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 10c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 10b.9 – E033 R112 Shelter – Server Stack – 03-FMECA.xlsx XLSX spreadsheet
Attachment 10b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 10a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 19 - Section L - Instructions - Conditions - And Notices To Offerors.docx DOCX document
Attachment 10c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 10e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.b - ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 10c.1 – E043 Firewall Red-FMECA.xlsx XLSX spreadsheet
Attachment 02 - AIAMD System of Systems (SoS)(MIS-PRF-56500).pdf PDF
Attachment 10b.1 – E001 28VDC Pwr Supply Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10e.11 – E149 – Table 5 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10d.2 – E144 RWS Bkup Batteries-FMECA.xlsx XLSX spreadsheet
Attachment 12 - Risk Management Plan.pdf PDF
Attachment 21 - Task Order 0001 Statement of Work.docx DOCX document
Attachment 10c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 10a.16– R034 Media Converter Power Supply-FMECA.xlsx XLSX spreadsheet
W31P4Q-20-R-0015_DRAFT_28 May 2020.pdf PDF
Attachment 10a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 04b - Draft_Relay Acceptance Test Procedures.docx DOCX document
Attachment 13c - IBCS-A301-003 Vol II Instructor Guide.pdf PDF
Attachment 22a.1.f - EOC Shelter views.pptx PPTX presentation
Attachment 22a.1.d - ALH-213030 00 CABLE ASSEMBLY, CASS J1 AND J3.pdf PDF
Attachment 10a.14 – R032 Media Converter Module 11-FMECA.xlsx XLSX spreadsheet
Attachment 20 - Section M - Evaluation Factors For Award.docx DOCX document
Attachment 22a - CASS to PDRS.docx DOCX document
Attachment 10d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10e.10 – E148 – Table 4 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10e.5 – E122 – EMI Tent PDU-FMECA.xlsx XLSX spreadsheet
Attachment 17 - Pre-Award Survey Accounting System Checklist.pdf PDF
Attachment 22a.1.g - PL-ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 22a.1.e - ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 22a.4 - CASS Task Purpose.pptx PPTX presentation
Attachment 10a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 10c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 03 - GFP Attachment - LRIP_FRP - 20 April 2020.xlsx XLSX spreadsheet
Attachment 04 - Acceptance Test Plan.docx DOCX document
Attachment 10c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Show all 50

DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .