Attachment 10c.8 – E053 Shelter Time Server-FMECA.xlsx
XLSX spreadsheet 9 MB Posted
- Attached to
- DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
- Solicitation number
- W31P4Q-20-R-0015
About this file
This document contains a preliminary failure modes and effects criticality analysis (FMECA) for an Integrated Battle Command System (IBCS) shelter time server.
The FMECA identifies 57 potential failure modes for components of the time server including failures of the power supply, processors, interfaces, and Ethernet and timing circuits. Each failure mode is assessed for its effects on component, system and end item operation. Severity classifications are assigned and mitigations considered such as redundant electronics-on-circuit boards. With redundancies, severity classifications are reduced from Category I to Category III. The FMECA was performed to support an upcoming IBCS low rate initial production/full rate production hardware contract requiring production of IBCS hardware end items in accordance with technical data packages and specifications, including engineering changes for obsolescence, new capabilities and export.
View the file
Other files for this federal contract opportunity
Show all 50
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .