C-20/C-37 Contractor Logistics Support (CLS) Services

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
CLS-Nov22-RFI
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft operated by the U.S. Air Force, Navy, Marine Corps, Army, and Coast Guard. The Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base is seeking proposals for these CLS services, which include maintenance and supply chain management. The solicitation will be evaluated on technical, past performance, and price factors, with technical subfactors including program management, supply support, maintenance, and small business participation. Key dates include a pre-solicitation conference on October 16, 2023 and a proposal due date of January 16, 2024.

This solicitation does not have a set-aside designation. The incumbent contractor is unknown. The total contract value is not specified, but the services will be procured on a firm-fixed-price basis. The solicitation seeks to maintain competition and encourage participation by small businesses.

Notice text

18 versions

Update #18 · Latest ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

**Note, please download a new copy of Appendix G Pricing Matrix.  Previously posted document was the wrong version.**

***AMENDMENT 2 TO THE RFP AND Q&A POSTED TODAY, 5 JAN 2024***

***AMENDMENT 1 TO THE RFP AND Q&A POSTED TODAY, 18 DEC 2023***

***RFP Q&A  Interim Question posted 6 Dec 2023.  Final list of Questions to be posted within 7-10 days.***

***3rd Draft Documents Q&A Posted today, 17 Nov 2023***

******FINAL RFP PACKAGE POSTED TODAY, 17 NOV 2023******

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #17 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

**Note, please download a new copy of Appendix G Pricing Matrix.  Previously posted document was the wrong version.**

***AMENDMENT 1 TO THE RFP AND Q&A POSTED TODAY, 18 DEC 2023***

***RFP Q&A  Interim Question posted 6 Dec 2023.  Final list of Questions to be posted within 7-10 days.***

***3rd Draft Documents Q&A Posted today, 17 Nov 2023***

******FINAL RFP PACKAGE POSTED TODAY, 17 NOV 2023******

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #16 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***AMENDMENT 1 TO THE RFP AND Q&A POSTED TODAY, 18 DEC 2023***

***RFP Q&A  Interim Question posted 6 Dec 2023.  Final list of Questions to be posted within 7-10 days.***

***3rd Draft Documents Q&A Posted today, 17 Nov 2023***

******FINAL RFP PACKAGE POSTED TODAY, 17 NOV 2023******

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #15 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***RFP Q&A  Interim Question posted 6 Dec 2023.  Final list of Questions to be posted within 7-10 days.***

***3rd Draft Documents Q&A Posted today, 17 Nov 2023***

******FINAL RFP PACKAGE POSTED TODAY, 17 NOV 2023******

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #14 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***3rd Draft Documents Q&A Posted today, 17 Nov 2023***

******FINAL RFP PACKAGE POSTED TODAY, 17 NOV 2023******

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #13 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***SYNOPSIS POSTED TODAY, 30 Oct 2023***

**Pre-solicitation Conference Q&A added, 30 Oct 2023***

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #12 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***2nd Draft Q&A has been posted 27 Oct 2023, along with the following documents:

  • Pre-solicitation Conference Q&A
  • New Cover Sheet
  • Revised Draft PWS
  • Revised Draft Appendix G Price Matrix
  • Revised Draft 1449 showing revised CLIN descriptions
  • Projected Flying Hours_Fleet

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #11 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***Presolicitation charts have been posted 16 Oct 2023

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #10 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***Presolicitation Conference Instructions and Registration Form posted 18 Sep 2023

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #9 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

***2nd Draft RFP FBO Announcement Updated 29 Aug 2023***

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #8 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

*********2ND DRAFT RFP added 21 Aug 2023*******

Items of Note:

1.  Draft RFP 2 FBO Announcement - please review and provide feedback on the items listed

2.  CLS RFP FA813423RB002 First Draft RFP Questions and Answers - includes all questions received in response to the first draft RFP 

3.  Documents with most extensive revisions - Solicitation CLIN structure, Appendix A - PWS, Appendix G - Price Matrix, Appendix H - CMP Codes, Appendix I - Performance Incentive Plan, Appendix J - Instructions to Offerors, and Appendix K - Evaluation Factors

************ DRAFT RFP added 20 Jun 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #7 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more inform

************DRAFT RFP added 20 June 2023***********

******************************************************************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #6 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

***********************

New question added to RFI #2 document - please download new version prior to submitting response!  Thank you!!

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #5 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

***********************

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Industry Day Attendees and Industry Day Questions & Answers have been posted.

**************************

Update #4 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

***********************

RFI #2 has been posted with a response required by 3 May 2023.  Please see attachment entitled C-20 C-37 CLS RFI 2 Final - new questions begin on page 4.

************************

Instructions for Industry Day scheduled for 29 Mar 2023 have been posted!  See new attachment for more information.  Thank you!

**************************

Update #3 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

***********************

INDUSTRY DAY IS NOW FULLY VIRTUAL.  We will no longer be hosting an in-person meeting at the Tinker Industrial Park for Industry Day.  We apologize for any inconvenience.  Instruction attachment has been edited.

************************

Instructions for Industry Day scheduled for 29 Mar 2023 have been posted!  See new attachment for more information.  Thank you!

**************************

Update #2 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

************************

Instructions for Industry Day scheduled for 29 Mar 2023 have been posted!  See new attachment for more information.  Thank you!

**************************

Update #1 ·

This requirement includes C-20 and C-37 Contractor Logistics Support (CLS) services for Gulfstream GIV, GV, and G550 aircraft for US Air Force (USAF), US Navy (USN), US Marine Corp (USMC), US Army (USA) and US Coast Guard (USCG) fleets.  See attached  document for more information.

Files

File Type Posted
Final Amd 1 Questions_5 Jan.pdf PDF
Solicitation - FA813423RB002 Amd 02_5 Jan 2024.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 2.pdf PDF
Revision Summary 2.pdf PDF
Appendix G - Pricing Matrix C20-C37 FINAL 14DEC2023- Protected.xlsx XLSX spreadsheet
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 1.pdf PDF
DRAFT Appendix E C20_C-37 CLS DD254_Rev 1.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 1.pdf PDF
Attachment 11 Vendor Subscriptions_Rev 1.xlsx XLSX spreadsheet
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Attachment 12 - USCG Airport Agreement_Rev 1.pdf PDF
Revision Summary 1.pdf PDF
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx XLSX spreadsheet
CDRL A030 Chief Financial Officer Report Attachment 1.xlsx XLSX spreadsheet
Appendix C Safety_Final.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
PPI Tool Download Instructions.docx DOCX document
Appendix H - C20_C37AB CMP Codes.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Solicitation - FA813423RB002 Final RFP.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Appendix F Wage Determination.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
Appendix I C-20 C-37 Performance Incentive Document (PID).pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
3rd Draft Questions and Answers_All.xlsx XLSX spreadsheet
Appendix K C20_C37 CLS Addendum 52.212-2_for FINAL release.pdf PDF
FBO Post.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 15NOV23-Protected.xlsx XLSX spreadsheet
Attachment 2-Definitions Final RFP.pdf PDF
Attachment 3 Publications Manuals and Forms.pdf PDF
Attachment 11 Vendor Subscriptions_New.xlsx XLSX spreadsheet
Rolls Royce Letter - US Airforce LOT Final RFP.docx.pdf PDF
C-20 C-37 Aircraft Exteriors Pictures FINAL RFP.docx DOCX document
C20 C37 Aircraft Interior Pictures Final RFP.docx DOCX document
C-20 C-37 Synopsis.pdf PDF
Pre-Solicitation Conference Questions and Answers.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 16OCT23-Protected.xlsx XLSX spreadsheet
Draft RFP Updates SAM Announcement.docx DOCX document
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
DRAFT FA813423RB002 CLIN Structure.pdf PDF
C20-C37 Pre-Solicitation Conference.pdf PDF
2nd Draft PWS Questions and Answers R2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
C-20/C-37 Contractor Logistics Support (CLS) Services Award Award Notice
This notice Latest pre-solicitation Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity