RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
C-20/C-37 Contractor Logistics Support (CLS) Services
Solicitation number
CLS-Nov22-RFI
Issued by

View the file

Other files

File Type Posted
Revision Summary 2.pdf PDF
Solicitation - FA813423RB002 Amd 02_5 Jan 2024.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Final Amd 1 Questions_5 Jan.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 2.pdf PDF
Appendix G - Pricing Matrix C20-C37 FINAL 14DEC2023- Protected.xlsx XLSX spreadsheet
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 1.pdf PDF
Revision Summary 1.pdf PDF
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 12 - USCG Airport Agreement_Rev 1.pdf PDF
Attachment 11 Vendor Subscriptions_Rev 1.xlsx XLSX spreadsheet
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 1.pdf PDF
DRAFT Appendix E C20_C-37 CLS DD254_Rev 1.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_for FINAL release.pdf PDF
C20 C37 Aircraft Interior Pictures Final RFP.docx DOCX document
3rd Draft Questions and Answers_All.xlsx XLSX spreadsheet
Rolls Royce Letter - US Airforce LOT Final RFP.docx.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
Appendix H - C20_C37AB CMP Codes.pdf PDF
Attachment 11 Vendor Subscriptions_New.xlsx XLSX spreadsheet
C-20 C-37 Aircraft Exteriors Pictures FINAL RFP.docx DOCX document
Appendix C Safety_Final.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 15NOV23-Protected.xlsx XLSX spreadsheet
FBO Post.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Attachment 3 Publications Manuals and Forms.pdf PDF
Attachment 2-Definitions Final RFP.pdf PDF
PPI Tool Download Instructions.docx DOCX document
Appendix F Wage Determination.pdf PDF
Appendix I C-20 C-37 Performance Incentive Document (PID).pdf PDF
Solicitation - FA813423RB002 Final RFP.pdf PDF
CDRL A030 Chief Financial Officer Report Attachment 1.xlsx XLSX spreadsheet
Pre-Solicitation Conference Questions and Answers.pdf PDF
C-20 C-37 Synopsis.pdf PDF
C20-C37 Pre-Solicitation Conference.pdf PDF
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
Draft RFP Updates SAM Announcement.docx DOCX document
DRAFT FA813423RB002 CLIN Structure.pdf PDF
2nd Draft PWS Questions and Answers R2.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT 16OCT23-Protected.xlsx XLSX spreadsheet
C20-C37 Pre-Solicitation Conference.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amentum Questions

Document:PageSectionDescriptionQuestion/ErrorAnswer
Appendix G1X400-X450Engine MaintenanceDo the engine maintenance evaluation criteria hours of Appendix G represent 1 engine or 2 enginesThe number of hours and cycles provided on Appendix G represents 1 engine only. Therefore, the number of hours and cycles will need to be multiplied by 2 to calculate a total per aircraft cost.

File details come from the government source that posted it. Updated .