Final Amd 1 Questions_5 Jan.pdf

PDF 409 KB Posted

Attached to
C-20/C-37 Contractor Logistics Support (CLS) Services
Solicitation number
CLS-Nov22-RFI
Issued by

About this file

This document contains answers to questions on appendices for a solicitation requesting proposals for C-20 and C-37 Contractor Logistics Support (CLS) services. The solicitation seeks CLS services for Gulfstream aircraft fleets operated by the US Air Force, Navy, Marine Corps, Army, and Coast Guard. The answers clarify that Appendix J should reference PWS section 2.8.1 instead of 2.8 for subfactor 4 on small business participation. Appendix K should reference PWS section 1.8 instead of 1.9 for subfactor 3 in evaluating an offeror's understanding of maintenance performance requirements.

View the file

Other files

File Type Posted
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Revision Summary 1.pdf PDF
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx XLSX spreadsheet
Appendix C Safety_Final.pdf PDF
Appendix H - C20_C37AB CMP Codes.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
C-20 C-37 Synopsis.pdf PDF
Pre-Solicitation Conference Questions and Answers.pdf PDF
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
C20-C37 Pre-Solicitation Conference.pdf PDF
C20 C37 CLS Pre-Solicitation Conference Instructions.pdf PDF
2nd Draft RFP FBO Announcement.docx DOCX document
2nd Draft RFP Attachment 1 - C-20_C-37 CLS PWS Acronyms.docx DOCX document
2nd Draft RFP Appendix F Wage Determination_2nd Draft.pdf PDF
2nd Draft Appendix K DRAFT_C20_C37 CLS Addendum 52.212-2.pdf PDF
2nd Draft RFP Attachment 11 - C-37 Vendor Subscriptions.pdf PDF
2nd Draft RFP Attachment 3 Publications Manuals and Forms.docx DOCX document
2nd Draft RFP Attachment 4_Mission Essential Services.docx DOCX document
2nd Draft RFP Appendix J DRAFT_C20_C37 CLS Addendum 52.212-1.pdf PDF
2nd Draft RFP Appendix G - Pricing Matrix C20-C37 DRAFT 20AUG23.xlsx XLSX spreadsheet
2nd Draft RFP Appendix E 2 of 2 CLS DD254 Continuation Sheet DRAFT_16 Mar 2023.docx DOCX document
2nd Draft RFP FBO Announcement.docx DOCX document
Process to Gain CMP Access.pdf PDF
Appendix I - C-20 C-37 Performance Incentive Document.pdf PDF
C-20 C-37 Aircraft Interior Pictures.docx DOCX document
Rolls Royce Letter - US Airforce LOT ltr_KE .docx.pdf PDF
MOB LAYOUTS (ALL).pdf PDF
Appendix D - CDRLs.pdf PDF
Attachment 9 Base Support Agreements.pdf PDF
Appendix F Wage Determinations.pdf PDF
Attachment 7 Appearance Standards.docx DOCX document
Attachment 4_Mission Essential Services.docx DOCX document
Attachment 3 Publications Manuals and Forms.docx DOCX document
C-20 C-37 CLS RFI 2 Final.docx DOCX document
Industry Day Questions and Answers.pdf PDF
C20G C37AB Industry Day Attendee List_Publish.pdf PDF
C-20 C-37 CLS RFI 2 Final.docx DOCX document
C-20 C-37CLS RFI.docx DOCX document
C-20 C-37 CLS RFI.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Page Section Description Question/Error Answer Appendix J 7 Table 2.3.1 Cross Reference Matrix Should Subfactor 4 - Small Business Participation reference PWS 2.8.1 rather than 2.8?

Yes, see revised Appendix J

Appendix J Paragraph 3.2.6.b Subfactor 4 Should paragraph 3.2.6.6 read "The offeror shall describe how the offeror will comply with CDRL X026 Small Business Utiliziation Report IAW PWS 2.8.1?

Yes, see revised Appendix K

Appendix K Paragraph 2.2.3 Subfactor 3 Paragraph 2.2.3 states “The subfactor is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale how their approach will meet the maintenance performance requirements (PWS 1.9) for all of the following essential maintenance elements with little potential for disruption of schedule or degradation of performance:” Should this paragraph refer to PWS 1.8 instead?

Yes, see revised Appendix K

File details come from the government source that posted it. Updated .