Final Amd 1 Questions_5 Jan.pdf

PDF 409 KB Posted

Attached to
C-20/C-37 Contractor Logistics Support (CLS) Services
Solicitation number
CLS-Nov22-RFI
Issued by

About this file

This document contains answers to questions on appendices for a solicitation requesting proposals for C-20 and C-37 Contractor Logistics Support (CLS) services. The solicitation seeks CLS services for Gulfstream aircraft fleets operated by the US Air Force, Navy, Marine Corps, Army, and Coast Guard. The answers clarify that Appendix J should reference PWS section 2.8.1 instead of 2.8 for subfactor 4 on small business participation. Appendix K should reference PWS section 1.8 instead of 1.9 for subfactor 3 in evaluating an offeror's understanding of maintenance performance requirements.

View the file

Other files

File Type Posted
Revision Summary 2.pdf PDF
Solicitation - FA813423RB002 Amd 02_5 Jan 2024.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 2.pdf PDF
Appendix G - Pricing Matrix C20-C37 FINAL 14DEC2023- Protected.xlsx XLSX spreadsheet
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 1.pdf PDF
Revision Summary 1.pdf PDF
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 12 - USCG Airport Agreement_Rev 1.pdf PDF
Attachment 11 Vendor Subscriptions_Rev 1.xlsx XLSX spreadsheet
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 1.pdf PDF
DRAFT Appendix E C20_C-37 CLS DD254_Rev 1.pdf PDF
RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx XLSX spreadsheet
Appendix K C20_C37 CLS Addendum 52.212-2_for FINAL release.pdf PDF
C20 C37 Aircraft Interior Pictures Final RFP.docx DOCX document
3rd Draft Questions and Answers_All.xlsx XLSX spreadsheet
Rolls Royce Letter - US Airforce LOT Final RFP.docx.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
Appendix H - C20_C37AB CMP Codes.pdf PDF
Attachment 11 Vendor Subscriptions_New.xlsx XLSX spreadsheet
C-20 C-37 Aircraft Exteriors Pictures FINAL RFP.docx DOCX document
Appendix C Safety_Final.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 15NOV23-Protected.xlsx XLSX spreadsheet
FBO Post.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Attachment 3 Publications Manuals and Forms.pdf PDF
Attachment 2-Definitions Final RFP.pdf PDF
PPI Tool Download Instructions.docx DOCX document
Appendix F Wage Determination.pdf PDF
Appendix I C-20 C-37 Performance Incentive Document (PID).pdf PDF
Solicitation - FA813423RB002 Final RFP.pdf PDF
CDRL A030 Chief Financial Officer Report Attachment 1.xlsx XLSX spreadsheet
Pre-Solicitation Conference Questions and Answers.pdf PDF
C-20 C-37 Synopsis.pdf PDF
C20-C37 Pre-Solicitation Conference.pdf PDF
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
Draft RFP Updates SAM Announcement.docx DOCX document
DRAFT FA813423RB002 CLIN Structure.pdf PDF
2nd Draft PWS Questions and Answers R2.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT 16OCT23-Protected.xlsx XLSX spreadsheet
C20-C37 Pre-Solicitation Conference.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Page Section Description Question/Error Answer Appendix J 7 Table 2.3.1 Cross Reference Matrix Should Subfactor 4 - Small Business Participation reference PWS 2.8.1 rather than 2.8?

Yes, see revised Appendix J

Appendix J Paragraph 3.2.6.b Subfactor 4 Should paragraph 3.2.6.6 read "The offeror shall describe how the offeror will comply with CDRL X026 Small Business Utiliziation Report IAW PWS 2.8.1?

Yes, see revised Appendix K

Appendix K Paragraph 2.2.3 Subfactor 3 Paragraph 2.2.3 states “The subfactor is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale how their approach will meet the maintenance performance requirements (PWS 1.9) for all of the following essential maintenance elements with little potential for disruption of schedule or degradation of performance:” Should this paragraph refer to PWS 1.8 instead?

Yes, see revised Appendix K

File details come from the government source that posted it. Updated .