PPI Tool Download Instructions.docx
DOCX document 290 KB Posted
- Solicitation number
- CLS-Nov22-RFI
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Past Performance Information (PPI) Download Instructions for Offerors
Offerors must use the PPI Tool (Use latest version at https://www.sam.gov) in order to electronically submit the PPI portion of the Past Performance Volume in accordance with the RFP FA8134-23-R-B002 for (C-20/C-37 Contractor Logistics Support (CLS) Services) Appendix J, Instructions to Offerors Attachment 1.1.
Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to open the Tool, contact Tracie Holman at tracie.holman@us.af.mil for assistance):
1. Right-click on the above ppi_tool.accdb icon. Select Copy. Paste the ppi_tool.accdb icon to a location on your computer. Right-click on the newly pasted ppi_tool.accdb icon and rename the file name as the prime contractor + RFP number + file extension. (e.g. XYZCompanyFA813423RB002.accdb).
If the copy/paste function does not work, select the ppi_tool.accdb icon and drag it to a location on your computer desktop and rename the file name as the prime contractor + RFP number + file extension. (e.g. XYZCompanyFA813423RB002.accdb).
2. Once the PPI Tool has been downloaded, opened, and content has been enabled, refer to the instructions located in RFP FA813423RB002 for C-20/C-37 CLS Services Appendix J, Instructions to Offerors Attachment 1.1. for the remaining PPI Tool instructions.
Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension.
image1.emf ppi_tool.accdb
File details come from the government source that posted it. Updated .