AN-SPN-50(V)1 - Procurement

Awarded Award Notice Posted

Solicitation number
N00019-15-R-0081
Agency
Naval Air Systems Command Department of the Navy, Department of Defense
Awarded
to Saab, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
N00019-16-C-5000 Federal contract award
NAICS code
334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

18 versions

Update #18 · Latest ·

Added: Sep 29, 2016 8:52 am The Naval Air Systems Command issued a Firm-Fixed Price and Cost Plus Incentive Fee contract to Saab Defense and Security USA for supplies and services associated with the AN/SPN-50(V)(1) RADAR system for air traffic control aboard Navy aircraft carriers and amphibious ships.  The contract provides for the delivery of three engineering development models.  The contract was competitively awarded and two offers were received.  The contracting officer is Mr. John Britt, john.britt@navy.mil (301) 757-5940; the contract specialist is LCDR Matthew Poss, matthew.poss@navy.mil (301) 757-5209.

Update #17 ·

Added: Nov 19, 2015 12:22 pm

November 19, 2015

This is Amendment 0007. There is no Amendment 0008 at this time. 


The purpose of amendment 0007 is to revise the formal RFP N00019-15-R-0081, posted on 18 September 2015, to provide an updated SOW, to attached updated CDRLs, and to publish additional Questions & Answers. For ease of seeing, the changes are highlighted in yellow with the exception of Section I changes.  Offorer is responsible for all revised changes whether or not they highlighted.

Please refer to the attached Amendment 0007 for complete details.

Offorers must acknowledge receipt of this amendment and receipt of the attachments on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry. Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069 and Mrs. Virgina Perry-Aldridge. Mrs. Perry-Aldridge can be reached via email at virginia.perry-aldri@navy.mil and by phone at (301) 342-9920.

Update #16 ·

Added: Oct 20, 2015 1:45 pm

 
20 October 2015 


This is Amendment 0006. There is no Amendment 0007 at this time. 

The purpose of this amendment is to revise the formal RFP dated 18 September 2015.  These changes are highlighted in yellow; provide one time Data Item Descriptions (DIDs) that are not accessable on the "DLA Assist" Website; attach revised associated CDRLs A001, A017 and A075.

Please refer to the attached Amendment 0006 for complete details.

Offorers must acknowledge receipt of this amendment and recepit of the attachments on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry. Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069 and Mrs. Virgina Perry-Aldridge. Mrs. Perry-Aldridge can be reached via email at virginia.perry-aldri@navy.mil and by phone at (301) 342-9920.

Update #15 ·

Added: Oct 14, 2015 2:53 pm This is Amendment 0005. There is no Amendment 0006 at this time. 

14 October 2015

The purpose of this amendment is to revise the formal RFP dated 18 September 2015 and to attach new and updated documents that pertain to the solicitation. Please see the attached SF 30 for the details of the amendment.

In order to gain access to the new documents in the Technical Library and the updated SRD, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the documents. Once you have downloaded the documents, your password will expire.

Offorers must acknowledge receipt of this amendment on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry. Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069 and Mrs. Virgina Perry-Aldridge. Mrs. Perry-Aldridge can be reached via email at virginia.perry-aldri@navy.mil and by phone at (301) 342-9920.

Update #14 ·

Added: Oct 06, 2015 2:07 pm


This is Amendment 0004.  There is no Amendment 0005 at this time.


06 October 2015

The purpose of this amendment is to revise the formal RFP dated 18 September 2015 and to attach new and updated documents that pertain to the solicitation.  Please see the attached SF 30 for the details of the amendment.

 In order to gain access to the new documents in the Technical Library and the updated SRD, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the documents.  Once you have downloaded the documents, your password will expire


Offorers must acknowledge receipt of this amendment on each copy of the offer submitted.


Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069 and Mrs. Virgina Perry-Aldridge.  Mrs. Perry-Aldridge can be reached via email at virginia.perry-aldri@navy.mil and by phone at (301) 342-9920.


Update #13 ·

Added: Oct 02, 2015 3:09 pm

02 October 2015

This is amendment 0003 not 0004 there is no amendment 0004 at this time.

Please see the attached SF 30 for the purpose of the amendment.

Offorers must acknowledge receipt of this amendment on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069 and Mrs. Virgina Perry-Aldridge.  Mrs. Perry-Aldridge can be reached via email at virginia.perry-aldri@navy.mil and by phone at (301) 342-9920.

Update #12 ·

Added: Sep 24, 2015 3:52 pm 24 September 2015 - Amendment #2



The purpose if this amendment is to inform Industry that the Technical Library can be accessed via the ARMDEC Website.  In order to gain access to the documents in the Library, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the documents.  Once you have downloaded the documents, your password will expire. 

Offorers must acknowledge receipt of this amendment on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #11 ·

Added: Sep 22, 2015 2:05 pm

 22 September 2015


This notice is to inform Industry that Amendment #1 for RFP number N00019-15-R-0081 has been posted.  The amendment includes the SF 30 and Section L Attachments embedded in the attached spreadsheet.   

The posting appears to have two amendments; this is because two separate attachments were added: 1) The SF 30 and 2) the Section L Cost Attachments.  Please note however, that this is Amendment #1 there is no Amendment #2 posted at this time.

Offorers must acknowledge receipt of this amendment on each copy of the offer submitted.

Questions on this amendment/synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #10 ·

Added: Sep 21, 2015 9:04 am  

21 September 2015



This notice is to inform industry that the Government is reattaching the Formal RFP that was posted on 18 September 2015 to this notice with the exact same RFP but without the "draft" watermark on the cover page.  Again, the RFP has not changed we are simply removing the "draft" watermark.

Questions on this synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.


.

Update #9 ·

Added: Sep 18, 2015 5:44 pm  

     The Naval Air Systems Command (NAVAIR) tentatively plans to conduct a full and open competition for the AN/SPN-50(V)(1) Shipboard Air Traffic Radar (SATR) Technology and Risk Reduction Phase with an option for the Engineering and Manufacturing Development phase as addressed in the FEDBIZZOPPS synopsis of 23 December 2014.  On 24 February 2015, NAVAIR posted a synopsis which announced an Industry Day for this procurement and stated that a draft Request for Proposal (RFP) for this requirement would be posted to the NAVAIR Homepage. The purpose of this synopsis is to provide publicly assessable draft RFP documents to you and describe procedures for obtaining the SPN-50 SATR Specification.


     The NAVAIR Homepage is inoperative; as a result, publicly assessable RFP documents are attached to this synopsis.  These documents consist of draft Sections B through K, draft SPN-50 SATR Statement of Work, and draft Contract Data Requirements List (CDRL) items.  Industry is encouraged to download these documents and review them in preparation for the pending Industry Day on 17-18 March 2015.


      The SPN-50 SATR Specification is marked with Distribution Statement C which limits distribution of the document to United States (U.S.) Government Agencies and their contractors.  The SPN-50 Specification may NOT be distributed to foreign contractors/foreign nationals.  As a result of this constraint, the SPN-50 SATR Specification will be made available to U.S. Contractors through the AMRDEC Website.  In order to gain access to the SPN-50 SATR Specification, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088.  Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the SPN-50 SATR Specification.  Once you have downloaded the SPN-50 SATR Specification, your password will expire. 


      Questions on this synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #8 ·

Added: Sep 18, 2015 5:39 pm


18 September 2015
 

The formal Request for Proposal (RFP) for the full and open competition for an engineering and manufacturing development contract for the AN/SPN-50(V)1 Shipboard Air Traffic Radar (SATR) Program is provided.  The RFP, Statement of Work, CDRLs, and SPN-50 Questions & Answers are attached to this synopsis.  As discussed in the synopsis posted earlier today, a revised specification dated 14 September 2015 for the AN/SPN-50(V)1 Shipboard Air Traffic Radar (SATR) Program  is available to U.S. Contractors through the ARMDEC Website.  In order to gain access to the SPN-50 SATR Specification dated 14 September 2015, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the SPN-50 SATR Specification.  Once you have downloaded the SPN-50 SATR Specification, your password will expire.  Questions on this synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.


 

Update #7 ·

Added: Sep 18, 2015 9:19 am 18 September 2015 


The Naval Air Systems Command (NAVAIR) has approved a revised specification dated 14 September 2015 for the AN/SPN-50(V)1 Shipboard Air Traffic Radar (SATR) Program.  As discussed in previous SPN-50 synopses, the revised SPN-50 SATR Specification will be made available to U.S. Contractors through the ARMDEC Website.  In order to gain access to the SPN-50 SATR Specification dated 14 September 2015, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the SPN-50 SATR Specification.  Once you have downloaded the SPN-50 SATR Specification, your password will expire.  Please note that NAVAIR plans to post the formal RFP for this acquisition to FEDBIZZOPPS imminently.  Questions on this synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #6 ·

Added: Jul 22, 2015 9:58 am Modified: Sep 04, 2015 9:16 amTrack Changes 22 July 2015

 
This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time.


This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 

 This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 

Added: Aug 25, 2015 12:54 pm Modified: Sep 04, 2015 9:16 amTrack Changes 25 August 2015


In response to industries concern regarding an updated SPN-50 SATR Specification mentioned in the 20 August 2015 post, we currently do not have the updated version.  However we do anticipate having the updated specification to be released concurrent with the RFP release.

Please direct all questions to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.



04 September 2015


The acquisition approach for the pending full and open competition for the engineering and manufacturing development contract for the AN/SPN-50(V)1 Shipboard Air Traffic Radar has been changed from Best Value to Lowest Price Technically Acceptable.  The Naval Air Systems Command anticipates issuing the formal request for proposal for this acquisition no later than 30 September 2015.

Update #5 ·

Added: Aug 25, 2015 12:54 pm 25 August 2015


In response to industries concern regarding an updated SPN-50 SATR Specification mentioned in the 20 August 2015 post, we currently do not have the updated version.  However we do anticipate having the updated specification to be released concurrent with the RFP release.

Please direct all questions to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #4 ·

Added: Jul 22, 2015 9:58 am Modified: Aug 20, 2015 12:05 pmTrack Changes 22 July 2015

 
This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 
















































































































































































































































































































































This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 


 


This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 

Update #3 ·

Added: Aug 20, 2015 11:57 am 20 AUGUST 2015 

The Naval Air Systems Command (NAVAIR) intends to conduct a full and open competition in accordance with FAR 6.102(b) for an engineering and manufacturing development contract for the AN/SPN-50(V)1 Shipboard Air Traffic Radar (SATR) Program.  NAVAIR does not intend to use the provisions of FAR Part 12 for this acquisition. Publicly assessable Request for Proposal (RFP) documents will be attached to a synopsis to be posted to FEDBIZZOPPS upon release of the final RFP.  NAVAIR hopes to release the final RFP in early September.  As discussed in previous SPN-50 synopses, the SPN-50 SATR Specification will be made available to U.S. Contractors through the ARMDEC Website.  In order to gain access to the SPN-50 SATR Specification, please provide your Cage Code and e-mail address to Mr. Mike Collins of PMA-213 at michael.c.collins@navy.mil or phone (301) 737-2088. Once Mr. Collins verifies your Cage Code, he will issue an e-mail to you providing the ARMDEC link and a unique password to be used to download the SPN-50 SATR Specification.  Once you have downloaded the SPN-50 SATR Specification, your password will expire.  Questions on this synopsis may be addressed to the PMA-213 Procuring Contracting Officer, Mr. Dan Gentry.  Mr. Gentry can be reached via e-mail at william.gentry@navy.mil and by phone at (301) 757-7069.

Update #2 ·

Added: Jul 22, 2015 9:58 am 22 July 2015

 
This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 


















































































































































































































































































































































This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 


 


This posting is to notify industry that the formal RFP release date for AN/SPN-50(V)1 effort has been pushed back. 

The Government is unable to project a release date at this time. 

Update #1 ·

Added: May 05, 2015 9:26 am  May 06, 2015 

 


"The following revised AN/SPN-50(V)1 SATR TMRR/EMD  procurement milestones with notional completion dates are provided:  Formal RFP posted to FEDBIZZOPPS -- 25 June 2015:  Due Date for Proposal Submittal - 25 August 2015; and Contract Award -- 10 May 2016.  Please note that these dates are subject to change". 

Also attached is the March 2015 Industry Day Information.

Attachments

Files attached to this notice, newest first
File Type Posted
Questions_and_Answers_16.Nov.15_amend_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007.pdf PDF
Amend_0007_CDRLs.pdf PDF
SF30_Amendment_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007_with_track_changes.pdf PDF
N00019_15_R_0081_0006_10.20.15.pdf PDF
OT-16-20005_SPN50_LeadTimeItems_(3)20151019(Rev1).pdf PDF
OT-16-20006_LCC_ISA_Rpt_PID0002_(3)20151019.pdf PDF
One_Time_DID_CDRLS_A001_A017_A075.pdf PDF
OT-16-20007_Installation_Test_Procedures_PMA213_(3)20151019.pdf PDF
13_October_Industry_Questions.pdf PDF
N00019-15-R-0081-0005.pdf PDF
SPN-50_SOW_10.05.15.pdf PDF
SPN-50_SOW__10.05.15(tracked_changes).pdf PDF
SPN-50_Cost_Attachments_10-02-15.xlsx XLSX spreadsheet
Responses_to_QAs_(formal_RFP)_10.6.15.pdf PDF
RFP_09.18.15_(track_changes).pdf PDF
2015_10_06_SPN50_CDRLS.pdf PDF
SPN_50_Amendment_0004.pdf PDF
SPN_50_Amendment_3.pdf PDF
SPN_50_Amendment_2.pdf PDF
SPN-50_Cost_Attachments_09-21-15.xlsx XLSX spreadsheet
SPN_50_Amendment_1.pdf PDF
RFP_dated_18_September_2015.pdf PDF
N00019-15-R-0081__DRFP_3_Mar.10.15.doc DOC document
SPN-50_SOW_--draft_--dated_10_March_2015(vpa).docx DOCX document
cdrl-specs-Draft-RFP_03_4_15.pdf PDF
Statement_of_Work_for_Shipboard_Air_Traffic_Radar_(SATR)_SPN-50(V)(1).pdf PDF
SPN-50_RFP.pdf PDF
SPN-50_Questions_and_Answers.pdf PDF
CDRLs_(2).pdf PDF
SPN-43C_Capabilities.pptx PPTX presentation
Industry_Day_Mar_2015_Questions_and_Answers_dtd_4_May_2015.pdf PDF
2015_Industry_Day_General_Session_Slides.ppt PPT presentation
N00019-15-R-0081__DRFP_3_for_SPN50.doc DOC document
SPN-50_CDRLs_11Mar15.pdf PDF
Show all 36

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity