Amend_0007_CDRLs.pdf

PDF 249 KB Posted

Attached to
AN-SPN-50(V)1 - Procurement Federal contract opportunity
Solicitation number
N00019-15-R-0081
Issued by
Department of the Navy Naval Air Systems Command

About this file

Updated CDRLs - Amendment 0007 as follows A001 A002 A003 A007 A047 A053 A086

View the file

Other files for this federal contract opportunity

Other files attached to AN-SPN-50(V)1 - Procurement, newest first.
File Type Posted
SPN-50_SOW_dtd_16_Nov_2015_amend_0007_with_track_changes.pdf PDF
Questions_and_Answers_16.Nov.15_amend_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007.pdf PDF
SF30_Amendment_0007.pdf PDF
OT-16-20005_SPN50_LeadTimeItems_(3)20151019(Rev1).pdf PDF
OT-16-20006_LCC_ISA_Rpt_PID0002_(3)20151019.pdf PDF
N00019_15_R_0081_0006_10.20.15.pdf PDF
One_Time_DID_CDRLS_A001_A017_A075.pdf PDF
OT-16-20007_Installation_Test_Procedures_PMA213_(3)20151019.pdf PDF
13_October_Industry_Questions.pdf PDF
N00019-15-R-0081-0005.pdf PDF
RFP_09.18.15_(track_changes).pdf PDF
SPN-50_SOW_10.05.15.pdf PDF
SPN-50_SOW__10.05.15(tracked_changes).pdf PDF
2015_10_06_SPN50_CDRLS.pdf PDF
SPN_50_Amendment_0004.pdf PDF
SPN-50_Cost_Attachments_10-02-15.xlsx XLSX spreadsheet
Responses_to_QAs_(formal_RFP)_10.6.15.pdf PDF
SPN_50_Amendment_3.pdf PDF
SPN_50_Amendment_2.pdf PDF
SPN_50_Amendment_1.pdf PDF
SPN-50_Cost_Attachments_09-21-15.xlsx XLSX spreadsheet
RFP_dated_18_September_2015.pdf PDF
SPN-50_SOW_--draft_--dated_10_March_2015(vpa).docx DOCX document
cdrl-specs-Draft-RFP_03_4_15.pdf PDF
N00019-15-R-0081__DRFP_3_Mar.10.15.doc DOC document
CDRLs_(2).pdf PDF
Statement_of_Work_for_Shipboard_Air_Traffic_Radar_(SATR)_SPN-50(V)(1).pdf PDF
SPN-50_RFP.pdf PDF
SPN-50_Questions_and_Answers.pdf PDF
Industry_Day_Mar_2015_Questions_and_Answers_dtd_4_May_2015.pdf PDF
SPN-43C_Capabilities.pptx PPTX presentation
2015_Industry_Day_General_Session_Slides.ppt PPT presentation
N00019-15-R-0081__DRFP_3_for_SPN50.doc DOC document
SPN-50_CDRLs_11Mar15.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form A~fcroved (1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hpurs per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining th~ data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any C)ther aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washingtor:i Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlir;&ton, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT ,C.CATEGORYI

0004 A MISC ,

D. SYSTEM/ITEM E. CONTRACT/PR NO.

F. CONTRACTOR

AN/SPN-50<V)1 N00019-15-R-0081 ',

1. DATA ITEM NO. , 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Eauipment Installation Instructions

4. AUTHORITY {Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MISC-81321A SOW Para 4.1 4.2 NAWCAD 6.6.2.6

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ (See Block SUBMISSION

b. COPIES DD 16) See Block 16

a. ADDRESSEE Final

8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

See Block 16 Draft Repro

Block Reg.

16)

16. REMARKS

NAWCAD 6.6.2.6 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government will have 30 calendar days after DCMA-ACO submission for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 10, 12, 13: Submission 60 calendar days prior to delivery of the Pre-CDR Configuration EDM Radar System #1 and 60 calendar days prior to delivery of the CDR Compliant EDM Radar System #3.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

I

I

I i

I i

~5. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

Roger Thomas 11/16/2015

JaO~-~~ hA-:C;,,q - ti NN {.:;

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. c 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DO 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V) 1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Technical Report - Study/Services Facilities Site Survey and Radar Component Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-MISC-80508B SOW oara 4.1 4.2 NAWCAD 6.6.2.6

7. DD250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ SUBMISSION

b. COPIES DD See Block 16

a. ADDRESSEE Final 8.APPCODE c 11.AS OF DATE 13. DATE OF SUBSEQUENT

A (See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 30 calendar days for review DCMA-ACO and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government Final Disposition is required 15 calendar days after incorporation of

' comments by the contractor.

Blocks 10, 12, 13: The facilities site survey required by SOW paragraph 4.1 shall be submitted 90 calendar days after contract award. The Pre-CDR Configuration EDM Radar System #1 Non- Compliances and radar component information required by SOW paragraph 4.1 shall be submitted 60 calendar days prior to delivery of the Pre-CDR Configuration EDM Radar System #1. The updated system component information required by SOW paragraph 4.2 shall be submitted 60 calendar days prior to delivery of the CDR i Compliant EDM Radar System #3.

BLOCK 14:All data shall be posted to the PMA213 Electronic data ' repository with notification to the distribution list in Block 14. !

I

15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

11/16/2015

Ja~~~J~ .... cP~ I gNw 1'5 . P::t!X - v--

I :

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. cl (j

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. b104-0188

Public reporting burden for this collection of information is estimated to average 11 O hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any ot~er aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington' Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC, 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

AN/SPN-50(V)1

1. DATA ITEM NO.

A003

B. EXHIBIT

A

E. CONTRACT/PR NO.

N00019-15-R-0081

2. TITLE OF DATA ITEM

Product Drawings/Models And Associated Lists

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE Dl-SESS-81000E (see block 16) SOW oara 4.1 4.2 14.1.1

7. DD 250

REQ

DD

9. DIST STATEMENT

REQUIRED

8.APPCODE C

A(See Block 16)

16. REMARKS

10. FREQUENCY 12. DATE OF FIRST

ASREQ (See Block suBMissioN

16) SEE BLOCK 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

PID: N00019-16-P1-PMA-213-0002

BLOCK 8: The Government will have 30 calendar days for review and comment . The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval is required 15 calendar days after incorporation of comments by the contractor.

Block 10, 12, 13: Submissions due, in digital format, 60 calendar days prior to the delivery of the Pre-CDR Configuration EDM Radar System #1 and 60 calendar days prior to delivery of the CDR Compliant EDM Radar System #3.

BLOCK 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

I

I

F. CONTRACTOR

3. SUBTITLE

Product Drawings and Associated Lists

6. REQUIRING OFFICE

.NAWCAD 6.6.2.6

14. DISTRIBUTION

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

: NAWCAD 6.6.2.6

PMA213H1

DC MA-A CO

I!

!15, TOTAL

G. PREPARED BY H. DATE I. APPROVED BY i J. DATE Janice Zilch rill .

Roger Thomas 11/16/2015

~e~

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST Form A~rcroved < 1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 ho1Jrs per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the ~ata needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any ot er aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington I Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC' 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contraating Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY :

0004 A ILSS ·

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50lV)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A007 As Built Confiauration List (ABCL) Bill of Materials (BOM)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-SESS-81830 SOW oara 4.1 4.2 14.4 NAWCAD 6.6.2.6

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ (See Block SUBMISSION

b. COPIES DD 16) see Block 16

a. ADDRESSEE Final

8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A (See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS NAWCAD 6.6.2.6 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government will have 30 calendar days for review and DC MA-A CO comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 10, 12, 13: Submissions due 60 calendar days prior to the Pre- !

CDR Configuration EDM Radar System #1 and 60 calendar days prior to delivery of the CDR Compliant EDM Radar System #3.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

I

15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

R~ 11/16/2015 Janice Zilch ' ...... ' ~.~ Q J, {8?JW Is /PA "' -DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. () u

17. PRICE GROUP

( 1 Data Item)

Form Approved OMB No. bt04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for · reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any ou:ier aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC !20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the ContracUPR No. Listed in Block E. , IC. CATEGORY

NDTI

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. S. SUBTITLE

A047 1

2. TITLE OF DATA ITEM

Test Procedure Svstem Ooeration Verification Test

4. AUTHORITY (Data Acquisition Document No.)

Dl-NDTl-80603A

5. CONTRACT REFERENCE

SOW oara4.2

~- REQUIRING OFFICE

liA.IR4.1.10.1

7. DD 250

REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

DD

ASREQ (See Block suBM1ss10N

16) See Block 16 1--~~~~~-;-~~~~~~-11

11. AS OF DATE 13. DATE OF SUBSEQUENT 8.APPCODE C

a. ADDRESSEE

A(See Block 16)

16. REMARKS

N/ A SUBMISSION

N/A

Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.

Block 12: Submit 90 calendar days prior to Systems Operation and Verification Test.

Block 14: All data shall be posted to the PMA213 Electronic data

:AIR4.1.10.1

IDCMA-ACO

:pMA213H1 repository with notification to the distribution list in Block 14. i

G. PREPARED BY

Walter Carroll

~-.L

DD FORM 1423-1, FEB 2001

H.DATE

11/17/2015

PREVIOUS EDITION MAY BE USED.

I. APPROVED BY

Janice Zilch

I i

115. TOTAL

o!J~'v-l u

b. COPIES

Final

Draft Reg. Repro

J. DATE

/ 8/VU / ')

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 11 O hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the pata needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any o~her aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington! Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DO 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contra¢ting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY '

0004 A NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A053 Test/lnsoection Reoort SOVT Reoort

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

Dl-NDTl-80809B SOW Para4.2 AIR4.11.7.6

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ (See Block SUBMISSION

b. COPIES DD 16) See Block 16

a. ADDRESSEE Final

8.APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16. REMARKS AIR-4.11.7.6 Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate DC MA-A CO Government comments. Government final disposition is required 15 PMA213H1 calendar days after incorporation of comments by the Contractor.

Block 12: Submission is due 30 calendar days after each System Operation Verification Test (SOVT).

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

i

I

I

! 15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY ! J.DATE

Walter Carroll 11/16/2015 Janice Zilch ' I

~ :L d. " ?j)rt- (8Na11E; - ~ ... ·~~ '; :

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l u!

17. PRICE GROUP

( 1 Data Item)

Form Approved OMB No. 0104-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DO 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contra6ting Officer for the Contract/PR No. Listed in Block E. ·

I T~ATEGORY : A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

D. SYSTEM/ITEM E. CONTRACT/PR NO.

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO.

A086 1

2. TITLE OF DATA ITEM

Software Technical Manuals

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW oara 4.1 4.2 Dl-IPSC-81443A

7. DD 250

REQ

DD

9. DIST STATEMENT

REQUIRED

8.APPCODE C

A(See Block 16)

16. REMARKS

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

PIO: N00019-16-P1-PMA-213-0002

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

F. CONTRACTOR

3. SUBTITLE

SATR Software Ooeration Manual

6. REQUIRING OFFICE

AIR-4.11.7.6

14. DISTRIBUTION

b.COPIES

a. ADDRESSEE Final

Draft Reg. Re pro

AIR-4.11.7.6

• PMA213H1

Block 8: The Government shall have 30 calendar days for review i DCMA-ACO and comment. The Contractor will have 15 calendar days to 1---~----1----+--t---incorporate Government comments. Subsequent Government final i•!---------+--1----+--i disposition is due 15 calendar days after incorporation of comments by the Contractor.

Block 10, 12, 13: Submission 60 calendar days prior to delivery of the i...---------+---+----1--i Pre-CDR Configuration EDM Radar System #1 and 60 calendar days prior to delivery of the CDR Compliant EDM Radar System #3. 1'""

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

G. PREPARED BY H. DATE

Walter Carroll 11/16/2015

I. APPROVED BY

Janice Zilch i

!,15. TOTAL

~~ev/l--.1 ,.t::"e1~ 0!XJ! .. L

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l (j

J.DATE

17. PRICE GROUP

File details come from the government source that posted it. Updated .