One_Time_DID_CDRLS_A001_A017_A075.pdf

PDF 109 KB Posted

Attached to
AN-SPN-50(V)1 - Procurement Federal contract opportunity
Solicitation number
N00019-15-R-0081
Issued by
Department of the Navy Naval Air Systems Command

About this file

One-Time Data Item Descriptions (DID) CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to AN-SPN-50(V)1 - Procurement, newest first.
File Type Posted
SPN-50_SOW_dtd_16_Nov_2015_amend_0007_with_track_changes.pdf PDF
Questions_and_Answers_16.Nov.15_amend_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007.pdf PDF
Amend_0007_CDRLs.pdf PDF
SF30_Amendment_0007.pdf PDF
OT-16-20005_SPN50_LeadTimeItems_(3)20151019(Rev1).pdf PDF
OT-16-20006_LCC_ISA_Rpt_PID0002_(3)20151019.pdf PDF
OT-16-20007_Installation_Test_Procedures_PMA213_(3)20151019.pdf PDF
N00019_15_R_0081_0006_10.20.15.pdf PDF
13_October_Industry_Questions.pdf PDF
N00019-15-R-0081-0005.pdf PDF
RFP_09.18.15_(track_changes).pdf PDF
2015_10_06_SPN50_CDRLS.pdf PDF
SPN_50_Amendment_0004.pdf PDF
SPN-50_SOW_10.05.15.pdf PDF
SPN-50_SOW__10.05.15(tracked_changes).pdf PDF
SPN-50_Cost_Attachments_10-02-15.xlsx XLSX spreadsheet
Responses_to_QAs_(formal_RFP)_10.6.15.pdf PDF
SPN_50_Amendment_3.pdf PDF
SPN_50_Amendment_2.pdf PDF
SPN_50_Amendment_1.pdf PDF
SPN-50_Cost_Attachments_09-21-15.xlsx XLSX spreadsheet
RFP_dated_18_September_2015.pdf PDF
SPN-50_SOW_--draft_--dated_10_March_2015(vpa).docx DOCX document
cdrl-specs-Draft-RFP_03_4_15.pdf PDF
N00019-15-R-0081__DRFP_3_Mar.10.15.doc DOC document
CDRLs_(2).pdf PDF
Statement_of_Work_for_Shipboard_Air_Traffic_Radar_(SATR)_SPN-50(V)(1).pdf PDF
SPN-50_RFP.pdf PDF
SPN-50_Questions_and_Answers.pdf PDF
Industry_Day_Mar_2015_Questions_and_Answers_dtd_4_May_2015.pdf PDF
2015_Industry_Day_General_Session_Slides.ppt PPT presentation
SPN-43C_Capabilities.pptx PPTX presentation
N00019-15-R-0081__DRFP_3_for_SPN50.doc DOC document
SPN-50_CDRLs_11Mar15.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form A~fcroved (1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50<V)1 NOOO 19-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A075 Lead Time Items List

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

OT-16-20005 SOW Para 15.1 NAWCAD 6.6.2.6

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ SUBMISSION

b.COPIES

DD 60DAC

a. ADDRESSEE Final 8.APPCODE c 11.AS OF DATE 13. DATE OF SUBSEQUENT

A (See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS NAWCAD 6.6.2.6 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 30 calendar days for review DC MA-A CO and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 13: Subsequent submissions due 5 calendar days following identification as a Lead Time candidate.

BLOCK 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

Roger Thomas 10/1/2015 Janice Zilch f o{t'1/tS-~-~--/ ~~ C)vb2}! CL-- --~ ~ff"

(~' CJ DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

(1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the ContracVPR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DA TA ITEM 3. SUBTITLE

A017 Life Cycle Cost (LCC) and Independent System Life Cycle Cost Estimate Schedule Assessment llSA) Reoort and Model

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

OT-16-20006 SOW Para 5.5 AIR4.2

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED See Block 16 SUBMISSION

b. COPIES

DD 60DAC

a. ADDRESSEE Final 8.APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block See Block 16 Draft Reg. Re pro

16)

16. REMARKS

AIR 4.2.1.2 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 25 calendar days for review DCMA-ACO and comment. The Contractor will have 14 calendar days to incorporate Government comments. Government final disposition required 20 calendar days following incorporation of Government comments.

BLOCK 10, 12, & 13: Frequency is quarterly following first submission, if revised from previous deliverable, through four quarterly deliverables. The LCCE shall be briefed at all Program Management Reviews throughout the duration of the contract.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

In addition to above instructions, deliver one (1) digital data copy in Microsoft Excel for Windows format on CD-ROM media to:

Department of Navy Naval Air Systems Command 4 7254 Davis Spur Road Patuxent River, MD 20670 Attn: 4.2.1.2 Division I PMA213 Cost Team

15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

Jordan~~· 10/1/2015 Janc;l02#U-- /O {tq /16 =-;! ' ~: '-z . ;..cc· . d~

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. C) u

17. PRICE GROUP

( 1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT IC. CATEGORY

0004 A SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Installation Test Procedures Installation and Acceptance Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

OT-16-20007 SOW Para 4.1 4.2 NAWCAD 6.6.2.6

7.'DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ (See Block SUBMISSION

b. COPIES DD 16) See Block 16

a. ADDRESSEE Final

8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PIO: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government will have 30 calendar days after DC MA-A CO submission for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 10, 12, 13: Submission 30 working days after installation/operational checkout of the SIL facility at Webster Field Annex.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

Margaret Fitzgeral . . µ'"' 10/5/2015 Janice Zilch • f o{' '{15' - . ./ ~ c .. __ ~lL----- y re-n /

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. G u

17. PRICE GROUP

File details come from the government source that posted it. Updated .