SPN-50_CDRLs_11Mar15.pdf
PDF 348 KB Posted
- Attached to
- AN-SPN-50(V)1 - Procurement Federal contract opportunity
- Solicitation number
- N00019-15-R-0081
About this file
Updated CDRLs to replace previous CDRLs posted 10 March 2015.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
LRU BIT Assesment Test Report
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW Para 4.5.1.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10,12,13: Submit 30 calendar days after testing.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
Janice Zilch
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Recommended Interim Spares
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A
5. CONTRACT REFERENCE
SOW Para 4.5.1.2, 6.1, 6.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
90 DAC
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 60 calendar days for review and comment. The Contractor will have 30 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the contractor.
Block 10,12,13: Subsequent submissions due 15 calendar days after end of quarter, to include all revisions from the previous submission.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
PMA-213
See Block 16 See Block 16
15. TOTAL
G. PREPARED BY
Roger Thomas
H. DATE
6/4/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
RELI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Reliability Prediction and Documentation of Supporting Data
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-81497
5. CONTRACT REFERENCE
SOW PARA 4.6.4, 4.7.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
(See Block 16)
12. DATE OF FIRST
SUBMISSION
Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the contractor.
Block 10, 12, 13: First submission due 60 calendar days prior to PDR. Subsequent submission due 60 calendar days prior to CDR.
Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TMSS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Manuals, Technical: Aircraft Maintenance Instructions, Technical Content Requirements (Work Package Concept)
3. SUBTITLE
Radar Installation Information
4. AUTHORITY (Data Acquisition Document No.)
MIL-DTL-81928C
5. CONTRACT REFERENCE
SOW Para 4.1.1, 4.1.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
30 DAC
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
NA
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 60 calendar days for review and comment. The Contractor will have 30 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the contractor.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14. Also deliver a CD or DVD of the deliverable.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Walter Carroll
H. DATE
6/4/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
LRU BIT Assesment Test
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW PARA 4.5.1.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 12: Submit 90 calendar days prior to testing.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Qualification Test Report
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
see block 16
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 5: SOW para 4.6.11.2, 4.6.11.3, 4.6.11.4, 4.6.11.5, 4.6.11.7,4.6.11.8, 4.6.11.9, 4.6.11.10, 4.6.11.11, 4.6.11.12, 4.6.11.13, 4.6.11.14
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 12: Submission due 30 calendar days after completion of testing.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
9/18/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Electronic Parts/Circuits Tolerence Analysis Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81734
5. CONTRACT REFERENCE
SOW Para 4.6.3
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments.
BLOCK 10, 12, 13: First submission due 60 calendar prior CDR.
Subsequent submission is due 60 calendar days after close of CDR.
Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/16/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Reliability Development Growth Test Procedures
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81629
5. CONTRACT REFERENCE
SOW PARA 4.6.11.8
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission due 60 calendar days prior to PDR. Subsequent submission due 60 calendar days prior to CDR.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
see block 16
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
A 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 5: SOW para 4.6.11.2, 4.6.11.3, 4.6.11.4, 4.6.11.5, 4.6.11.7, 4.6.11.9, 4.6.11.10, 4.6.11.11, 4.6.11.12,4.6.11.13, 4.6.11.14
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission due 60 calendar days prior to PDR. Subsequent submission due 60 calendar days prior to CDR.
Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
9/18/2014
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
MNTY
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Maintainability Predictions Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MNTY-81602
5. CONTRACT REFERENCE
SOW PARA 4.5.1.3
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
(See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 20 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Blocks 10, 12, 13: First submission due 60 calendar days prior to PDR. Quarterly thereafter up to CDR. Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
4/17/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
TMSS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Manuals, Technical: Aircraft Maintenance Instructions, Technical Content Requirements (Work Package Concept)
3. SUBTITLE
AN/SPN-50 TECH Manuals
4. AUTHORITY (Data Acquisition Document No.)
MIL-DTL-81928C
5. CONTRACT REFERENCE
SOW Para 4.9
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the contractor.
Block 12,13. Technical manuals to be delivered with each radar system delivery.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Walter Carroll
H. DATE
6/4/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBA
B. EXHIBIT
A
C. CATEGORY
RELI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Failed Item Analysis Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81927
5. CONTRACT REFERENCE
SOW PARA 4.6.5
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 10,12,13: Submission due 14 calendar days after failure.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Enviromental Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW Para 4.6.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10,12: Submit 90 calendar days after contract award.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
PMA213H1
AIR 2.2.1.4
DCMA-ACO
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Reliability and Maintainability (R&M) Program Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81613A
5. CONTRACT REFERENCE
SOW Para 4.6.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
90 DAC
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 60 calendar days for review and comment. The Contractor will have 30 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
RELI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Reliability Block Diagrams and Maintenance Models Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-81496
5. CONTRACT REFERENCE
SOW Para 4.6.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission 60 calendar days prior to PDR.
Subsequent submission due 60 calendar days prior to CDR.
Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
5/15/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
SESS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
Stress, Fatigue, and Fracture Analysis Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81939
5. CONTRACT REFERENCE
SOW Para 4.6.3
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12: Submission due 60 calendar days prior to CDR.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
4/17/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Logistics Management Information (LMI) Summaries
3. SUBTITLE
Bill of Materials (BOM)
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81530
5. CONTRACT REFERENCE
SOW para 4.1.1, 4.1.2, 4.7.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
30 DAC
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 12,13: Revisions, if required, to the BOM shall be provided within 15 calendar days after identification of requirement.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
PMA-213
See Block 16 See Block 16
15. TOTAL
G. PREPARED BY
Roger Thomas
H. DATE
6/4/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
RELI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-80255
5. CONTRACT REFERENCE
SOW Para 4.6.7, 4.6.8
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
QTRLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 12, 13: First submission will be at the end of the quarter after the first failure, quarterly thereafter.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
RELI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A023
2. TITLE OF DATA ITEM
Corrective Action Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-80254
5. CONTRACT REFERENCE
SOW Para 4.6.6
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
see Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
see Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 60 calendar days for review and comment. The Contractor will have 30 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: Submission due 20 calendar days after completion of Correction Action.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A024
2. TITLE OF DATA ITEM
Failure Modes Effects, and Criticality Analysis Report
3. SUBTITLE
FMECA
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-81495
5. CONTRACT REFERENCE
SOW Para 4.6.9
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 20 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission due 45 calendar days prior to PDR. Subsequent delivery due 90 calendar days prior to CDR.
Revisions due 30 calendar days after Corrective Action Plan.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
4/17/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A025
2. TITLE OF DATA ITEM
Thermal Survey Report
3. SUBTITLE
Thermal Analysis and Survey Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81592A
5. CONTRACT REFERENCE
SOW Para 4.6.10
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 20 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 12: Delivery shall be 30 calendar days after completion of Thermal Survey.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
4/17/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
NDTI
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A028
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW Para 4.6.11.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 10 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission due 60 calendar days prior to PDR. Subsequent submission due 60 calendar days prior to CDR.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.
AIR 2.2.1.4
DCMA-ACO
PMA213H1
15. TOTAL
G. PREPARED BY
Clyde Griffin
H. DATE
6/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY
MISC
D. SYSTEM/ITEM
AN/SPN-50(V)1
E. CONTRACT/PR NO.
N00019-16-P1-PMA-213-0002
F. CONTRACTOR
1. DATA ITEM NO.
A032
2. TITLE OF DATA ITEM
Parts Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81748
5. CONTRACT REFERENCE
SOw Para 4.7.6
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
D 11. AS OF DATE
n/a
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 8: The Government will have 60 calendar days for review and comment. The Contractor will have 20 calendar days to incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the Contractor.
Block 10, 12, 13: First submission due 60 calendar days prior to PDR. Subsequent delivery due 60 calendar days after CDR.
Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .