CA-1 PWBS
| SECTION L COST ATTACHMENT 1 | ||||
| Program Work Breakdown Structure (PWBS) | ||||
| AN/SPN-50(V)1 Shipboard Air Traffic Radar (Level 0) | ||||
| Level 1 | Level 2 | Level 3 | Level 4 | |
| 1.0 | AN/SPN-50(V)1 | |||
| 1.1 | Prime Mission Product(PMP) | |||
| 1.1.1 | PMP Above Deck | |||
| 1.1.1.1 | Antenna Group | |||
| 1.1.1.2 | Antenna | |||
| 1.1.1.3 | Receiver | |||
| 1.1.1.4 | Pedestal | |||
| 1.1.2 | PMP Below Deck | |||
| 1.1.2.1 | Radar Control Group | |||
| 1.1.2.2 | Receiver | |||
| 1.1.2.3 | Transmitter | |||
| 1.1.3 | PMP Local Maintenance Set Control (LMSC) | |||
| 1.1.4 | PMP Remote Radar Set Control (RRSC) | |||
| 1.1.5 | PMP External Connections | |||
| 1.1.5.1 | NAVSSI | |||
| 1.1.5.2 | ECM Blanker System (AN/SLA-10) | |||
| 1.1.5.3 | RADDS (AN/SPQ-12) | |||
| 1.1.5.4 | Identify Friend or Foe (IFF) | |||
| 1.1.5.5 | Display System (TPX-42) | |||
| 1.1.5.6 | CTCC/AATCC | |||
| 1.1.6 | PMP Miscellaneous Components1..n | |||
| 1.1.7 | PMP Software Release 1…n | |||
| 1.1.8 | PMP Integration, Assembly, Test and Checkout |
| 1.2 | Platform Integration, Assembly, Test and Checkout | ||
| 1.2.1 | Installation Support | ||
| 1.2.2 | Drawings | ||
| 1.2.2.1 | Above Deck | ||
| 1.2.2.2 | Below Deck |
1.3 Systems Engineering
1.4 Program Management
| 1.5 | System, Test, and Evaluation | |
| 1.5.1 | Development Test and Evaluation | |
| 1.5.2 | Operational Test and Evaluation | |
| 1.5.3 | Mock-ups / System Integration Labs (SILs) | |
| 1.5.4 | Test and Evaluation Support | |
| 1.5.5 | Test Facilities |
| 1.6 | Training | |
| 1.6.1 | Equipment | |
| 1.6.2 | Services | |
| 1.6.3 | Facilities |
| 1.7 | Data | |
| 1.7.1 | Technical Publications | |
| 1.7.2 | Engineering Data | |
| 1.7.3 | Management Data | |
| 1.7.4 | Support Data | |
| 1.7.5 | Data Depository |
| 1.8 | Peculiar Support Equipment | |
| 1.8.1 | Test and Measurement Equipment | |
| 1.8.2 | Support and Handling Equipment |
| 1.9 | Common Support Equipment | |
| 1.9.1 | Test and Measurement Equipment | |
| 1.9.2 | Support and Handling Equipment |
| 1.10 | Operational/Site Activation | |
| 1.10.1 | System Assembly, Installation and Checkout on Site | |
| 1.10.2 | Contractor Technical Support | |
| 1.10.3 | Site Construction | |
| 1.10.4 | Site/Ship Conversion | |
| 1.10.5 | Sustainment/Interim Contractor Support |
| 1.11 | Industrial Facilities | |
| 1.11.1 | Construction/Conversion/Expansion | |
| 1.11.2 | Equipment Acquisition or Modernization | |
| 1.11.3 | Maintenance (Industrial Facilities) |
| 1.12 | Initial Spares and Repair Parts | |
| 1.12.1 | INCO-I | |
| 1.12.2 | INCO-R | |
| 1.12.3 | Repair of Repairables | |
| 1.12.4 | Ship Spares | |
| 1.12.5 | Depot Spares |
&20&A
Page &P of &N
CA-1 PWBS Definitions
| SECTION L COST ATTACHMENT 1 | ||
| Program Work Breakdown Structure (PWBS) Dictionary | ||
| PWBS | Term | Definition |
| 1.0 | AN/SPN-50(V)1 | Replacement Shipboard Air Traffic Radar for legacy CVN/LHA/D type ships |
| 1.1 | Prime Mission Product(PMP) | Combined subsystem prototype to provide the system level context for Technology maturation assestment of the subsystems. A relevant environment for demonstrating subsystem maturity. |
| 1.1.1 | PMP Above Deck | Any component of the system that will be above deck |
| 1.1.1.1 | Antenna Group | Self Explanatory |
| 1.1.1.2 | Antenna | Self Explanatory |
| 1.1.1.3 | Receiver | Self Explanatory |
| 1.1.1.4 | Pedestal | Self Explanatory |
| 1.1.2 | PMP Below Deck | Any component of the system that will be below deck |
| 1.1.2.1 | Radar Control Group | Self Explanatory |
| 1.1.2.2 | Receiver | Self Explanatory |
| 1.1.2.3 | Transmitter | Self Explanatory |
| 1.1.3 | PMP Local Maintenance Set Control (LMSC) | Local maintenance set control will be used to control the transmitter from the radar room. |
| 1.1.4 | PMP Remote Radar Set Control (RRSC) | Remote Radar Set Control will be used to control the transmitter from a remote location. |
| 1.1.5 | PMP External Connections | Any system that must connect with the PMP |
| 1.1.5.1 | NAVSSI | How system will be connected...software, cable, electrical, etc |
| 1.1.5.2 | ECM Blanker System (AN/SLA-10) | How system will be connected...software, cable, electrical, etc |
| 1.1.5.3 | RADDS (AN/SPQ-12) | How system will be connected...software, cable, electrical, etc |
| 1.1.5.4 | Identify Friend or Foe (IFF) | How system will be connected...software, cable, electrical, etc |
| 1.1.5.5 | Display System (TPX-42) | How system will be connected...software, cable, electrical, etc |
| 1.1.5.6 | CTCC/AATCC | How system will be connected...software, cable, electrical, etc |
| 1.1.6 | PMP Miscellaneous Components1..n | Any component that was not accounted for elsewhere |
| 1.1.7 | PMP Software Release 1…n | Resources associated with the PMP subsystem for release; one or more computer software configurations that satisfies a specific set or subset of requirements |
| 1.1.8 | PMP Integration, Assembly, Test and Checkout | The resources, materials and services involved in the integration, assembly, test and checkout of the PMP at appropriate site. |
1.2 Platform Integration, Assembly, Test and Checkout The effort involved in providing technical and engineering services to the platform manufacturer or integrator during the installation and integration of the PMP into the host system.
1.3 Systems Engineering The technical and management efforts of directing and controlling a totally integrated engineering effort of a system of the program.
1.4 Program Management The business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives, which are not associated with specific hardware elements and are not included in system engineering.
| 1.5 | System, Test, and Evaluation | The use of pilot, prototype, production, or specifically gabricated hardware/software to obtain or validate engineering data on the performanceof the system. It also includes all effort associated with the development of any specialized tools or data in support of the system level test program. |
| 1.5.1 | Development Test and Evaluation | Self Explanatory |
| 1.5.2 | Operational Test and Evaluation | The test and evaluation conducted to assess the prospective system's utility, operational effectiveness, operational suitability, logistics supportability, cost of ownership, and need for any modifications. |
| 1.5.3 | Mock-ups / System Integration Labs (SILs) | The design engineering and production of system or subsystem mock-ups that have special contractual or engineering significance or that are not required solely for the conduct of one of the above elements of testing. |
| 1.5.4 | Test and Evaluation Support | The support elements necessary to operate and maintain, during test and evaluation, systems and subsystems, which are not consumed during the testing phase and are not allocated to a specific phase of testing. |
| 1.5.5 | Test Facilities | The special test facilities required for performance of the various developmental tests necessary to prove the design and reliability of the system or subsystem. |
| 1.6 | Training | Deliverable training services, devices, accessories, aids, equipment, and parts used to facilitate instruction through which personnel will learn to operate and maintain the system with maximum efficiency. |
| 1.6.1 | Equipment | Distinctive deliverable end items of training equipment, assigned by either a contractor or military service required to meet specific training objectives. |
| 1.6.2 | Services | Deliverable training services, accessorites, and aids necessary to accomplish trianing objectives |
| 1.6.3 | Facilities | Facilities required for performance of the various developmentaltests necessary to prove the design and reliability of the system or subsystem |
| 1.7 | Data | All data items in support of the program. |
| 1.7.1 | Technical Publications | Technical data, providing instructions for installation, operation, maintenance, training, and support, formatted into a technical manual |
| 1.7.2 | Engineering Data | Recorded scientific or technical information, regardless of form or method of recording, including computer software documetation |
| 1.7.3 | Management Data | Data items necessary for configuration management, cost, schedule, contractual data management, program management, etc., required by government |
| 1.7.4 | Support Data | Data Items designed to document support planning in accordance with functional categories |
| 1.7.5 | Data Depository | The facility, including storage requirements, designated to act as custodian to maintain a master engineering specification and establish a drawing repository service for government approved documents that are the property of the US Government. This facility is a distinct entity that may hold electronic or hard copy data. |
| 1.8 | Peculiar Support Equipment | The design, development, and production of those deliverable items and associated software required to support and maintain the system or portions of the system while the system is not directly engaged in the performance of its mission, and which are not common support equipment. |
| 1.8.1 | Test and Measurement Equipment | The peculiar or unique testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support. |
| 1.8.2 | Support and Handling Equipment | The deliverable tools and handling equipment used for support of the mission system. |
| 1.9 | Common Support Equipment | The items required to support and maintain the system or portions of the system while not directly engaged in the performance of its mission, and which are presently in the DoD inventory for support of other systems. |
| 1.9.1 | Test and Measurement Equipment | The common testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support. |
| 1.9.2 | Support and Handling Equipment | The deliverable tools and handling equipment used for support of the mission system. |
| 1.10 | Operational/Site Activation | The real estate, construction, conversion, utilities, and equipment to provide all facilities required to house, service, and launch prime mission equipment at the organizational and intermediate level. |
| 1.10.1 | System Assembly, Installation and Checkout on Site | The materials and services involved in integrating the AN/SPN-50(V)1 PMP equipment onto the host platform. |
| 1.10.2 | Contractor Technical Support | The materials and services provided by the contractor related to activation. |
| 1.10.3 | Site Construction | Real estate, site planning and preparation, construction, and other special-purpose facilities necessary to achieve system operational status. |
| 1.10.4 | Site/Ship Conversion | The materials and services required to convert existing sites, ships, or vehicles to accommodate the mission equipment and selected support equipment directly related to the specific system. |
| 1.10.5 | Sustainment/Interim Contractor Support | The complex of equipment (hardware/software), data, and services required to operate, maintain, support and modernize prime mission product of existing operational systems done before the Material Support Date (MSD). |
| 1.11 | Industrial Facilities | The construction, conversion, or expansion of industrial facilities for production, inventory, and contractor depot maintenance required when that service is for the specific system. |
| 1.11.1 | Construction/Conversion/Expansion | The real estate and preparation of system peculiar industrial facilities for production, inventory, depot maintenance, and other related activities. |
| 1.11.2 | Equipment Acquisition or Modernization | The production equipment acquisition, modernization, or transferal of equipment for the particular system. This pertains to Government owned and leased equipment under facilities contract. |
| 1.11.3 | Maintenance (Industrial Facilities) | The maintenance, preservation, and repair of industrial facilities and equipment. |
| 1.12 | Initial Spares and Repair Parts | Spare parts and assemblies to establish relevant inventory and support prior to the Program's Material Support Date. |
| 1.12.1 | INCO-I | Initial installation and check out kit |
| 1.12.2 | INCO-R | Recurring installation and check out kit requriements |
| 1.12.3 | Repair of Repairables | All data items in support of the program. |
| 1.12.4 | Ship Spares | Suggested ship sparing requirements |
| 1.12.5 | Depot Spares | Suggested depot sparing requirements |
&20&A
Page &P of &N
CA-2 CRM (-881 App B)
SECTION L COST ATTACHMENT 2
| Work Breakdown Structure | CLIN | SOW Paragraph | ||||
| LEVEL | 1 | 2 | 3 | 4 | ||
| 1.0 | AN/SPN-50(V)1 Shipboard Air Traffic Radar | |||||
| 1.1 | Prime Mission Product (PMP) | 0003 | 4.2, 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.1 | PMP Above Deck | 0003 | 4.2 | |||
| 1.1.1.1 | Antenna Group | 0003 | 4.2 | |||
| 1.1.1.2 | Antenna | 0003 | 4.2 | |||
| 1.1.1.3 | Receiver | 0003 | 4.2 | |||
| 1.1.1.4 | Pedestal | 0003 | 4.2 | |||
| 1.1.2 | PMP Below Deck | 0003 | 4.2 | |||
| 1.1.2.1 | Radar Control Group | 0003 | 4.2 | |||
| 1.1.2.2 | Receiver | 0003 | 4.2 | |||
| 1.1.2.3 | Transmitter | 0003 | 4.2 | |||
| 1.1.3 | PMP Local Maintenance Set Control (LMSC) | 0003 | 4.2 | |||
| 1.1.4 | PMP Remote Radar Set Control (RRSC) | 0003 | 4.2 | |||
| 1.1.5 | PMP External Connections | 0003 | 4.2 | |||
| 1.1.5.1 | NAVSSI | 0003 | 4.2 | |||
| 1.1.5.2 | ECM Blanker System (AN/SLA-10) | 0003 | 4.2 | |||
| 1.1.5.3 | RADDS (AN/SPQ-12) | 0003 | 4.2 | |||
| 1.1.5.4 | Identify Friend or Foe (IFF) | 0003 | 4.2 | |||
| 1.1.5.5 | Display System (TPX-42) | 0003 | 4.2 | |||
| 1.1.5.6 | CTCC/AATCC | 0003 | 4.2 | |||
| 1.1.6 | PMP Miscellaneous Components...n | 0003 | 4.2 | |||
| 1.1.6.1 | Component 1 | 0003 | 4.2 | |||
| 1.1.6.2 | Component 2 | 0003 | 4.2 | |||
| 1.1.6.3 | Component 3 | 0003 | 4.2 | |||
| 1.1.6.4 | Component 4…n | 0003 | 4.2 | |||
| 1.1.7 | PMP Software Release…n | 0003 | 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.7.1 | SW Release 1 | 0003 | 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.7.2 | SW Release 2 | 0003 | 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.7.3 | SW Release 3 | 0003 | 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.7.4 | SW Release 4…n | 0003 | 8.0, 8.1, 8.2, 8.3 | |||
| 1.1.8 | PMP Integration, Assembly, Test and Checkout | 0003 | 4.2 | |||
| 1.2 | Platform Integration, Assembly, Test and Checkout | 0003 | 4.2 | |||
| 1.2.1 | Installation | 0003 | 4.2 | |||
| 1.2.2 | Drawings | 0003 | 4.2 | |||
| 1.2.3 | Test & Checkout | 0003 | 4.2 | |||
| 1.3 | Systems Engineering | 0003 | 7.0, 7.1, 7.2, 7.3, 7.5, 7.7, 10, 10.1, 10.7, 11.1, 11.2, 13, 13.1, 13.1.5, 14.4, 14.14, | |||
| 1.4 | Program Management | 0003 | 5.0, 5.1, 5.2, 5.3, 5.4, 5.5, 5.6, 5.7, 5.8, 5.9, 5.10, 5.10.1, 5.11, 5.12, 5.13, 5.13.1, 5.14, 11, 12, 12.1, 12.2, 13.1.6, 14, 14.5, 14.12, 17, 17.1, 17.2, 17.3, 17.4, 17.5 | |||
| 1.5 | System, Test, and Evaluation | 0003 | 10.11.1, 10.11.2, 16.1, 16.2, 16.3, 16.4, 16.5, 16.6 | |||
| 1.5.1 | Development Test and Evaluation | 0003 | 10.11, 10.11.1, 10.11.2 | |||
| 1.5.2 | Operational Test and Evaluation | N/A | ||||
| 1.5.3 | Mock-ups / System Integration Labs (SILs) | N/A | ||||
| 1.5.4 | Test and Evaluation Support | 0003 | 16, 16.1, 16.2, 16.3, 16.4, 16.5, 16.6 | |||
| 1.5.5 | Test Facilities | N/A | ||||
| 1.6 | Training | 0003 | 13.2 | |||
| 1.6.1 | Equipment | 0003 | 13.2.3 | |||
| 1.6.2 | Services | 0003 | 13.2.1, 13.2.2, 13.2.4, 13.2.5 | |||
| 1.6.3 | Facilities | N/A | ||||
| 1.7 | Data | 0003 | 6.0 | |||
| 1.7.1 | Technical Publications | 0003 | 14.10 | |||
| 1.7.2 | Engineering Data | 0003 | 6.2, 6.3, 6.4, 6.8, 10.2, 10.3, 10.6, 10.8, 10.9, 10.10, 11.3, 11.4, 13.1.1, 13.1.2, 13.1.3, 13.1.4, 14.1, 14.1.1, 14.2 | |||
| 1.7.3 | Management Data | 0003 | 6.8, 6.9, 12.2.1, 12.2.2, 14.11, 14.2, 14.13, 18 | |||
| 1.7.4 | Support Data | 0003 | 6.5, 6.6, 6.7, 9.0, 9.1, 9.2, 9.3, 10.5, 10.11.3, 10.11.4, 14.3, 14.6, 14.7, 14.8, 15, 15.1, 15.2 | |||
| 1.7.5 | Data Depository | 0003 | 6.1, 14.9, 14.9.1 | |||
| 1.8 | Peculiar Support Equipment | 0003 | 14.11 | |||
| 1.8.1 | Test and Measurement Equipment | 0003 | 14.11 | |||
| 1.8.2 | Support and Handling Equipment | 0003 | 14.11 | |||
| 1.9 | Common Support Equipment | 0003 | 14.11 | |||
| 1.9.1 | Test and Measurement Equipment | 0003 | 14.11 | |||
| 1.9.2 | Support and Handling Equipment | 0003 | 14.11 | |||
| 1.10 | Operational/Site Activation | N/A | ||||
| 1.10.1 | System Assembly, Installation and Checkout on Site | N/A | ||||
| 1.10.2 | Contractor Technical Support | N/A | ||||
| 1.10.3 | Site Construction | N/A | ||||
| 1.10.4 | Site/Ship Conversion | N/A | ||||
| 1.10.5 | Sustainment/Interim Contractor Support | N/A | ||||
| 1.11 | Industrial Facilities | N/A | ||||
| 1.11.1 | Construction/Conversion/Expansion | N/A | ||||
| 1.11.2 | Equipment Acquisition or Modernization | N/A | ||||
| 1.11.3 | Maintenance (Industrial Facilities) | N/A | ||||
| 1.12 | Initial Spares and Repair Parts | 0003 | 4.2, 15.3, 15.4 | |||
| 1.12.1 | INCO-I | N/A | ||||
| 1.12.2 | INCO-R | N/A | ||||
| 1.12.3 | Repair of Repairables | 0003 | 14.9.2, 15.3, 15.4 | |||
| 1.12.4 | Ship Spares | 0003 | 4.2 | |||
| 1.12.5 | Depot Spares | N/A |
&A
Page &P of &N
CA-3 2794, Pg 1 (CSDR Plan)
| SECTION L COST ATTACHMENT 3 | |
| COST AND SOFTWARE DATA REPORTING PLAN | Form Approved |
OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | ||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||
| Pre-A | B | C-FRP | INITIAL | ||||||||
| A | C-LRIP | O&S | CHANGE | ||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS |
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||
| PROGRAM | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | RDT&E | |||||
| CONTRACT (SUB) | PROCUREMENT | ||||||||
| O&M |
| 11. WBS ELEMENT CODE | 12. | ||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||
| (X if applicable) | DD 1921-3 (CBDR): |
| a. PROGRAM/ | |||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | ||
| SUBCONTRACT | a. CWBS | ||
| DICTIONARY | b. DD 1921 | ||
| (CDSR) | c. DD 1921-1 | ||
| (FCHR) | d. DD 1921-2 | ||
| (PCR) | e. DD 1921-4 | ||
| (CSR) | f. SRDR |
FORMATS
DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE
&A
Page &P of &N
CA-3 2794, Pg 2 (CSDR Plan)
SECTION L COST ATTACHMENT 3
| 14. CSDR SUBMISSION DATES | ||||
| a. | ||||
| SUBMISSION | b. | |||
| FORM(S) | c. | |||
| EVENT | d. AS OF DATE | e. DUE DATE | ||
| (YYYYMMDD) | (YYYYMMDD) |
15. REMARKS
DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE
&A
Page &P of &N
CA-4 RDT - Contract
| SECTION L COST ATTACHMENT 4 | ||||||||||||||
| Resource Distribution Table (RDT) | ||||||||||||||
| AN/SPN-50(V)1 - Contract Plan | ||||||||||||||
| Prime Contractor | Subcontractors | |||||||||||||
| Prime Contractor or Sub-Contractor | Total | In-House | Total | Subcontractor 1 | Subcontractor 2 | Subcontractor 3 | Subcontractor 4 | Subcontractor 5 | Subcontractor 6 | |||||
| Description | ||||||||||||||
| Contractor/Organization Name | ||||||||||||||
| Contractor/Organization Location | ||||||||||||||
| Contract Number | ||||||||||||||
| Total Program Office or Contract/Effort Value (Estimated), TY$M | ||||||||||||||
| Subtotal Software Contract Value (Estimated), TY$M | ||||||||||||||
| Program Office | ||||||||||||||
| CSDR Direct Reporting per CWIPT (Yes/No) | ||||||||||||||
| SRDR Direct Reporting per CWIPT (Yes/No) | ||||||||||||||
| WBS NUMBERS | WBS Element Name | |||||||||||||
| L1 | L2 | L3 | L4 | |||||||||||
| 1.0 | AN/SPN-50(V)1 Shipboard Air Traffic Radar | |||||||||||||
| 1.1 | Prime Mission Product (PMP) | |||||||||||||
| 1.1.1 | PMP Above Deck | |||||||||||||
| 1.1.1.1 | Antenna Group | |||||||||||||
| 1.1.1.2 | Antenna | |||||||||||||
| 1.1.1.3 | Receiver | |||||||||||||
| 1.1.1.4 | Pedestal | |||||||||||||
| 1.1.2 | PMP Below Deck | |||||||||||||
| 1.1.2.1 | Radar Control Group | |||||||||||||
| 1.1.2.2 | Receiver | |||||||||||||
| 1.1.2.3 | Transmitter | |||||||||||||
| 1.1.3 | PMP Local Maintenance Set Control (LMSC) | |||||||||||||
| 1.1.4 | PMP Remote Radar Set Control (RRSC) | |||||||||||||
| 1.1.5 | PMP External Connections | |||||||||||||
| 1.1.5.1 | NAVSSI | |||||||||||||
| 1.1.5.2 | ECM Blanker System (AN/SLA-10) | |||||||||||||
| 1.1.5.3 | RADDS (AN/SPQ-12) | |||||||||||||
| 1.1.5.4 | Identify Friend or Foe (IFF) | |||||||||||||
| 1.1.5.5 | Display System (TPX-42) | |||||||||||||
| 1.1.5.6 | CTCC/AATCC | |||||||||||||
| 1.1.6 | PMP Miscellaneous Components...n | |||||||||||||
| 1.1.6.1 | Component 1 | |||||||||||||
| 1.1.6.2 | Component 2 | |||||||||||||
| 1.1.6.3 | Component 3 | |||||||||||||
| 1.1.6.4 | Component 4…n | |||||||||||||
| 1.1.7 | PMP Software Release…n | |||||||||||||
| 1.1.7.1 | SW Release 1 | |||||||||||||
| 1.1.7.2 | SW Release 2 | |||||||||||||
| 1.1.7.3 | SW Release 3 | |||||||||||||
| 1.1.7.4 | SW Release 4…n | |||||||||||||
| 1.1.8 | PMP Integration, Assembly, Test and Checkout | |||||||||||||
| 1.2 | Platform Integration, Assembly, Test and Checkout | |||||||||||||
| 1.2.1 | Installation | |||||||||||||
| 1.2.2 | Drawings | |||||||||||||
| 1.2.3 | Run/Flight Test | |||||||||||||
| 1.3 | Systems Engineering | |||||||||||||
| 1.4 | Program Management | |||||||||||||
| 1.5 | System, Test, and Evaluation | |||||||||||||
| 1.5.1 | Development Test and Evaluation | |||||||||||||
| 1.5.2 | Operational Test and Evaluation | |||||||||||||
| 1.5.3 | Mock-ups / System Integration Labs (SILs) | |||||||||||||
| 1.5.4 | Test and Evaluation Support | |||||||||||||
| 1.5.5 | Test Facilities | |||||||||||||
| 1.6 | Training | |||||||||||||
| 1.6.1 | Equipment | |||||||||||||
| 1.6.2 | Services | |||||||||||||
| 1.6.3 | Facilities | |||||||||||||
| 1.7 | Data | |||||||||||||
| 1.7.1 | Technical Publications | |||||||||||||
| 1.7.2 | Engineering Data | |||||||||||||
| 1.7.3 | Management Data | |||||||||||||
| 1.7.4 | Support Data | |||||||||||||
| 1.7.5 | Data Depository | |||||||||||||
| 1.8 | Peculiar Support Equipment | |||||||||||||
| 1.8.1 | Test and Measurement Equipment | |||||||||||||
| 1.8.2 | Support and Handling Equipment | |||||||||||||
| 1.9 | Common Support Equipment | |||||||||||||
| 1.9.1 | Test and Measurement Equipment | |||||||||||||
| 1.9.2 | Support and Handling Equipment | |||||||||||||
| 1.10 | Operational/Site Activation | |||||||||||||
| 1.10.1 | System Assembly, Installation and Checkout on Site | |||||||||||||
| 1.10.2 | Contractor Technical Support | |||||||||||||
| 1.10.3 | Site Construction | |||||||||||||
| 1.10.4 | Site/Ship Conversion | |||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | |||||||||||||
| 1.11 | Industrial Facilities | |||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | |||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | |||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | |||||||||||||
| 1.12 | Initial Spares and Repair Parts | |||||||||||||
| 1.12.1 | INCO-I | |||||||||||||
| 1.12.2 | INCO-R | |||||||||||||
| 1.12.3 | Repair of Repairables | |||||||||||||
| 1.12.4 | Ship Spares | |||||||||||||
| 1.12.5 | Depot Spares |
| 1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the |
| Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform |
| to the applicable rules established for the Program Plan RDT |
| 2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included. |
&A
Page &P of &N
CA-5 1921
| SECTION L COST ATTACHMENT 5 | |
| COST SUMMARY | |
| DD 1921 | |
| Base Year ____ |
| 1. PROGRAM | 2. RFP NO: | 5. | PRIME/ASSOCIATE | SUBCONTRACTOR | ||
| (Name and address, | ||||||
| 3. | include ZIP Code) | |||||
| RESERVED FOR FUTURE USE |
| WBS | CONTRACT | NUMBER | PROPOSED PRICES | PERFORMANCE WORK | ||||
| ELEMENT | REPORTING ELEMENTS | LINE | OF | (in Thousands $) | STATEMENT | RESPONSIBLE | ||
| CODE | ITEM | UNITS | NON. REC. | REC. | TOTAL | PARAGRAPH (S) | ORGANIZATION | |
| A | B | C | D | E | F | G | H | I |
| Note: Include WBS at the lowest level at which your estimate was developed. |
&A
Page &P of &N
CA-6 1921-1
| SECTION L COST ATTACHMENT 6 |
| Functional Cost-Hour Report (Modified DD 1921-1 Form) |
| 1. PROGRAM | 2. | 6. | BASE YEAR: | |
| RESERVED FOR FUTURE USE |
A 3. DOLLARS IN 4. HOURS IN 5. RFP NO.
| n | ||||||||
| o | 7. PRIME/ASSOCIATE | SUBCONTRACTOR | 8. WBS REPORTING ELEMENT (S) | |||||
| i | Note: Include WBS at the lowest level at which your estimate was developed. | |||||||
| t | ||||||||
| c | ||||||||
| e | ||||||||
| S | ||||||||
| IN HOUSE | SUBCONTRACTOR | CONTRACTOR | ||||||
| OUTSIDE PROD. & SERV. | & SUBC. | |||||||
| FUNCTIONAL CATEGORIES | NRE | REC | TOTAL | NRE | REC | TOTAL | TOTAL |
| a | b | c | d = b + c | e | f | g = e + f | h = d + g | |
| ENGINEERING | ||||||||
| 1. DIRECT LABOR HOURS | ||||||||
| 2. DIRECT LABOR DOLLARS | ||||||||
| 3. OVERHEAD | ||||||||
| 4. MATERIAL | ||||||||
| 5. OTHER DIRECT CHARGES (Specify) | ||||||||
| 6. TOTAL ENGINEERING DOLLARS | ||||||||
| TOOLING | ||||||||
| 7. DIRECT LABOR HOURS | ||||||||
| 8. DIRECT LABOR DOLLARS | ||||||||
| 9. OVERHEAD | ||||||||
| B | 10. MATERIALS AND PURCHASED TOOLS | |||||||
| 11. OTHER DIRECT CHARGES (Specify) | ||||||||
| n | 12. TOTAL TOOLING DOLLARS | |||||||
| o | QUALITY CONTROL | |||||||
| i | 13. DIRECT LABOR HOURS | |||||||
| t | 14. DIRECT LABOR DOLLARS | |||||||
| c | 15. OVERHEAD | |||||||
| e | 16. OTHER DIRECT CHARGES (Specify) | |||||||
| S | 17. TOTAL QUALITY CONTROL DOLLARS | |||||||
| MANUFACTURING | ||||||||
| 18. DIRECT LABOR HOURS | ||||||||
| 19. DIRECT LABOR DOLLARS | ||||||||
| 20. OVERHEAD | ||||||||
| 21. MATERIALS AND PURCHASED PARTS | ||||||||
| 22. OTHER DIRECT CHARGES (Specify) | ||||||||
| 23. TOTAL MANUFACTURING DOLLARS | ||||||||
| OTHER COSTS | ||||||||
| 24. PURCHASED EQUIPMENT & SERVICES | ||||||||
| 25. MATERIAL OVERHEAD | ||||||||
| 26. OTHER COSTS NOT SHOWN ELSEWHERE (Specify) | ||||||||
| FUNCTIONAL COST-HOUR SUMMARY | ||||||||
| 27. TOTAL COST LESS G&A | ||||||||
| 28. G&A (Total contract only) | ||||||||
| 29. TOTAL COST PLUS G&A | ||||||||
| 30. PROFIT/FEE | ||||||||
| 31. COST OF MONEY | ||||||||
| 31. TOTAL PRICE (Sum of lines 29, 30, and 31) |
&A
Page &P of &N
CA-7 Substantiation
| SECTION L COST ATTACHMENT 7 |
| COST SUBSTANTIATION |
| WBS __Note: Include WBS at the lowest level at which your estimate was developed.____________ | ||||||||||||||
| 1. PROGRAM | ||||||||||||||
| LABOR / MATERIAL | COST ESTIMATE TY$ | ANALOGOUS COST TY$ | ||||||||||||
| BREAKOUT | A | B | C | D | E | F | G | H | ||||||
| 1921-1 | Contractor | Contractor | Contractor | Subcontractor | Subcontractor | Subcontractor | 1921-1 | Contractor | Contractor | Contractor | Subcontractor | Subcontractor | Subcontractor | |
| Category | Labor Hours | Labor Cost | Mat'l Cost | Labor Hours | Labor Cost | Mat'l Cost | Category | Labor Hours | Labor Cost | Mat'l Cost | Labor Hours | Labor Cost | Mat'l Cost | |
| Nonrecurring |
Recurring
| TOTAL | ||
| TOTAL COST ESTIMATE (TY$) A+B+C+D | TOTAL COST ANALOGOUS EFFORT (TY$) E+F+G+H |
DESCRIPTION OF WORK CONTENT / TECHNICAL PARAMETERS DESCRIPTION OF DIFFERENCES IN WORK CONTENT
ESTIMATE BASE BASE COST TY$ ADJUSTMENTS / CALCULATIONS ADJUSTMENTS COST TY$ TOTAL COST ESTIMATE (TY$)
DESCRIPTION OF ESTIMATE BASE / PROCESS DESCRIPTION OF ADJUSTMENTS / CALCULATIONS OTHER (IF NECESSARY)
&A
Page &P of &N
CA-8 Software
| SECTION L COST ATTACHMENT 8 | |||||||||||
| SOFTWARE | |||||||||||
| SOFTWARE LINES OF CODE | WBS Element | LANGUAGE | MATURITY FACTOR | APPLICATION | SEI RATING | NEW OR UPGRADE | RADAR SOFTWARE (RADAR or OTHER) | PRODUCTIVITY | |||
| (Hours and Subcontract dollars) | HISTORICAL BASIS | TOTAL EXISTING SLOC | NEW SLOC | REUSE SLOC | MODIFIED SLOC | COTS SLOC | TOTAL SLOC | ESLOC | ESLOC CALC | ||
| CSCI A | 0 | ||||||||||
| CSCI B | 0 | ||||||||||
| CSCI… | 0 | ||||||||||
| TOTAL | 0 |
| SW PRODUCTIVITY ELEMENTS | Is this Element included in Productivity? (Yes/No) | ||
| IEEE/EIA 12207 Elements | |||
| Subsystem SW requirements analysis | |||
| Subsystem SW architectural design | |||
| Subsystem SW detailed design | |||
| Subsystem SW coding and test | |||
| Subsystem SW integration | |||
| Subsystem SW qualification testing | |||
| Additional Elements | |||
| SW quality assurance | |||
| SW configuration management | |||
| SW management | |||
| SW Productivity Map | |||
| Productivity Element | WBS Element | Hours and Subcontract dollars | Substantiation / Rationale (May use cost proposal reference) |
| NEW OR UPGRADE | ||
| Software Line of Code Nomenclature | WBS Element | Substantiation / Rationale (May use cost proposal reference) |
| CSCI A | ||
| CSCI B | ||
| CSCI… |
| RADAR SOFTWARE | ||
| Software Line of Code Nomenclature | WBS Element | Substantiation / Rationale (May use cost proposal reference) |
| CSCI A | ||
| CSCI B | ||
| CSCI… |
| DIRECTIONS: |
| 1) For each WBS element provide requested data for each CSCI. Expand table as required to include all CSCIs. If SLOC estimates are done at a lower level expand table to include sub-indentured items such as CSCs or CSUs. |
| 2) SLOC should be in LOGICAL lines of code. |
| 3) In the SW Productivity Elements table, identify which elements are included in the proposed Productivity hours and Subcontract dollars. For ALL elements NOT included in the SW Productivity Elements table (that is, if "No" was selected in the SW Productivity Elements Table), provide the location in the cost proposal of the Productivity hours and/or subcontract dollars for these elements in the SW Productivity Map table. |
DEFINITIONS:
| LANGUAGE= Higher Order Language (HOL) used for coding. NOTE: Assembly Language is considered HOL for estimating purposes |
| MATURITY FACTOR= Assessment of how much is known about the software at time of size estimation. See Table 1 below for selections |
| APPLICATION= Intended use of Software. See Table 2 below |
| SEI RATING= CMMI rating of Organization developing software |
| PRODUCTIVITY= Provide productivity in terms of person hours and subcontract dollars (if applicable). |
| HISTORICAL BASIS= Historical basis of productivity metric. |
| TOTAL EXISTING SLOC= Number of Logical Source Line of Code (SLOC) of preexisting legacy Software |
| NEW SLOC= Number of newly developed logical source lines of code (SLOC) |
| REUSE SLOC= Number of existing logical source lines of code (SLOC) reused without modification |
| MODIFIED SLOC= Number of existing logical source lines of code (SLOC) that will be modified |
| COTS SLOC= Number of logical source lines of code (SLOC) of Commercial Off-The-Shelf (COTS) with which application will be integrated |
| TOTAL SLOC= Summation of NEW, REUSE, MODIFIED, and COTS logical source lines of code |
| ESLOC= Equivalent new line of code calculated from NEW, REUSE, MODIFIED, and COTS SLOC |
| ESLOC CALC= Formula used for ESLOC calculation. Example: ESLOC = New + x%*reuse + y%*modified + z%*COTS |
| BIT= Built in test |
| PHM= Prognostic and Health Management |
| Table 1: MATURITY FACTOR |
| The maturity factor is a means of assessing how good the size estimates for the CSCI are. It is logical that size inputs provided at the Preliminary Design Review would have much less potential for growth than the initial size estimate. |
| Initial Cost Estimate - Reflects a program understanding approximately 1 - 2 years prior to award and the high uncertainty surrounding requirements and sizing inputs well in advance of award. | |
| CARD Completed - Reflects a program understanding approximately 6 months prior to award. Frequently there will be an incomplete System Segment Specification and limited inputs from potential developers. | |
| SRR Completed - Reflects a program understanding near contract award. Typically the preliminary system segment specification is complete and all CSCIs identified. Significant knowledge of similar systems and reuse is known. | |
| SDR Completed - Reflects a program understanding when the system functional baseline, system segment specification, and software development plan are completed. Typically software requirements and Interface specifications will still be in a preliminary stage. | |
| SSR Completed - Reflects a program understanding when all CSCI requirements are identified and defined (functional performance, database, testing), requirement and interface specification are done and the System Allocated Baseline is complete. | |
| PDR- Preliminary Design Review is held. | |
| CDR- Critical Design Review is held. | |
| End of CSCI Testing Completed - Reflects completed and delivered software. | |
| Table 2: APPLICATION | |
| Airborne Software - Flight Critical | |
| Airborne Software - Mission Critical | |
| Airborne Software - Non-Critical | |
| Shipboard or Van Software - Flight Critical | |
| Shipboard or Van Software - Mission Critical | |
| Shipboard or Van Software - Non-Critical | |
| Ground Software - Flight Critical | |
| Ground Software - Mission Critical | |
| Ground Software - Non-Critical | |
| Table 3: NEW OR UPGRADE | |
| Designate CSCI as "New" if software development effort is being estimated for a new system. CSCIs with an identifiable heritage system or requiring a significant level of reuse code should be designated as "UPGRADE" | |
| Table 4: RADAR SOFTWARE | |
| Designate CSCI as "Radar" when the software being developed is intended for use in a radar or similar type system (i.e. jammer systems and/or other algorithmic intensive code). NOTE: This includes but is not limited to modes, beam steering, exciter, BIT, PHM, and signal processing. Also, Software written for radars, but are support or mission related should be designated as "Other." | |
| Yes | |
| No |
&A
Page &P of &N
CA-9 SEPM
| SECTION L COST ATTACHMENT 9 | ||||||||||
| SEPM Work Years Level Of Effort (LOE) Staffing Matrix | ||||||||||
| SE/PM (Equivalent Head-Counts by Yr) | FY07 | FY08 | FY09 | FY10 | FY11 | FY12 | FY13 | FY14 | FY15 | TOTAL |
| Non-ILS | ||||||||||
| Systems Engineering | ||||||||||
| Prime | ||||||||||
| Sub 1 | ||||||||||
| Sub 2 | ||||||||||
| Sub n | ||||||||||
| Program Management | ||||||||||
| Prime | ||||||||||
| Sub 1 | ||||||||||
| Sub 2 | ||||||||||
| Sub n | ||||||||||
| ILS | ||||||||||
| Systems Engineering | ||||||||||
| Prime | ||||||||||
| Sub 1 | ||||||||||
| Sub 2 | ||||||||||
| Sub n | ||||||||||
| Program Management | ||||||||||
| Prime | ||||||||||
| Sub 1 | ||||||||||
| Sub 2 | ||||||||||
| Sub n |
&A
Page &P of &N
CA-10 Skill Mix_Rates
| SECTION L COST ATTACHMENT 10 |
| SKILL MIX / COMPOSITE DIRECT LABOR RATE |
Base Year ____
| 1. WBS Element | 1921-1 LABOR CATEGORY (1) | LABOR RATE CATEGORY (2) | LABOR RATE (TY$/HR) (3) | SKILL MIX PERCENT | ADJUSTED LABOR RATE (TY$/HR) | COMPOSITE LABOR RATE (TY$/HR) (4) |
| a. | b. | c. | d. | e. | f = d*e | g= Sum of f |
| Example: | ||||||
| X000 | Engineering | Design Engineer | 40.00 | 25% | 10.00 | |
| Test Engineer | 30.00 | 10% | 3.00 | |||
| General Engineer | 27.00 | 50% | 13.50 | |||
| Eng. Technician | 15.00 | 15% | 2.25 | 28.75 | ||
| Manufacturing | Manufacturing 1 | 28.00 | 60% | 16.80 | ||
| Manufacturing 2 | 13.00 | 40% | 5.20 | 22.00 |
| NOTES: |
| (1) Provide for each Fiscal Year by a minimum of Level 2 of the CWBS. |
| (2) Provide for all Modified DD Form 1921-1 Labor Categories as needed (i.e., Engineering, Manufacturing, Tooling, Quality Control). |
| (3) Provide Labor Category descriptions / titles as defined by the accounting structure with a link to specific rate negotiation agreements |
| (e.g., FPRAs). For example, Engineering may be divided into: Design Engineering, Test Eng., General Eng., Eng. Technician, etc. |
| (4) Labor Rate should trace directly to current rate notices such as FPRA, AWD or CBA. |
| (5) Composite Labor Rate should trace directly to Modified DD Form 1921-1 Functional Labor Category. |
| Labor Rate Definitions (explain what tasks are being performed under each functional labor category): |