SPN-50_Cost_Attachments_10-02-15.xlsx

XLSX spreadsheet 148 KB Posted

Attached to
AN-SPN-50(V)1 - Procurement
Solicitation number
N00019-15-R-0081
Issued by

About this file

Updated Section L Attachments for Amendment 0004

View the file

Other files

File Type Posted
SF30_Amendment_0007.pdf PDF
Questions_and_Answers_16.Nov.15_amend_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007.pdf PDF
Amend_0007_CDRLs.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007_with_track_changes.pdf PDF
One_Time_DID_CDRLS_A001_A017_A075.pdf PDF
N00019_15_R_0081_0006_10.20.15.pdf PDF
OT-16-20007_Installation_Test_Procedures_PMA213_(3)20151019.pdf PDF
OT-16-20006_LCC_ISA_Rpt_PID0002_(3)20151019.pdf PDF
OT-16-20005_SPN50_LeadTimeItems_(3)20151019(Rev1).pdf PDF
13_October_Industry_Questions.pdf PDF
N00019-15-R-0081-0005.pdf PDF
Responses_to_QAs_(formal_RFP)_10.6.15.pdf PDF
RFP_09.18.15_(track_changes).pdf PDF
2015_10_06_SPN50_CDRLS.pdf PDF
SPN-50_SOW_10.05.15.pdf PDF
SPN-50_SOW__10.05.15(tracked_changes).pdf PDF
SPN_50_Amendment_0004.pdf PDF
SPN_50_Amendment_3.pdf PDF
SPN_50_Amendment_2.pdf PDF
SPN_50_Amendment_1.pdf PDF
SPN-50_Cost_Attachments_09-21-15.xlsx XLSX spreadsheet
RFP_dated_18_September_2015.pdf PDF
N00019-15-R-0081__DRFP_3_Mar.10.15.doc DOC document
SPN-50_SOW_--draft_--dated_10_March_2015(vpa).docx DOCX document
cdrl-specs-Draft-RFP_03_4_15.pdf PDF
Statement_of_Work_for_Shipboard_Air_Traffic_Radar_(SATR)_SPN-50(V)(1).pdf PDF
CDRLs_(2).pdf PDF
SPN-50_RFP.pdf PDF
SPN-50_Questions_and_Answers.pdf PDF
SPN-43C_Capabilities.pptx PPTX presentation
Industry_Day_Mar_2015_Questions_and_Answers_dtd_4_May_2015.pdf PDF
2015_Industry_Day_General_Session_Slides.ppt PPT presentation
N00019-15-R-0081__DRFP_3_for_SPN50.doc DOC document
SPN-50_CDRLs_11Mar15.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA-1 PWBS

SECTION L COST ATTACHMENT 1
Program Work Breakdown Structure (PWBS)
AN/SPN-50(V)1 Shipboard Air Traffic Radar (Level 0)
Level 1Level 2Level 3Level 4
1.0AN/SPN-50(V)1
1.1Prime Mission Product(PMP)
1.1.1PMP Above Deck
1.1.1.1Antenna Group
1.1.1.2Antenna
1.1.1.3Receiver
1.1.1.4Pedestal
1.1.2PMP Below Deck
1.1.2.1Radar Control Group
1.1.2.2Receiver
1.1.2.3Transmitter
1.1.3PMP Local Maintenance Set Control (LMSC)
1.1.4PMP Remote Radar Set Control (RRSC)
1.1.5PMP External Connections
1.1.5.1NAVSSI
1.1.5.2ECM Blanker System (AN/SLA-10)
1.1.5.3RADDS (AN/SPQ-12)
1.1.5.4Identify Friend or Foe (IFF)
1.1.5.5Display System (TPX-42)
1.1.5.6CTCC/AATCC
1.1.6PMP Miscellaneous Components1..n
1.1.7PMP Software Release 1…n
1.1.8PMP Integration, Assembly, Test and Checkout
1.2Platform Integration, Assembly, Test and Checkout
1.2.1Installation Support
1.2.2Drawings
1.2.2.1Above Deck
1.2.2.2Below Deck

1.3 Systems Engineering

1.4 Program Management

1.5System, Test, and Evaluation
1.5.1Development Test and Evaluation
1.5.2Operational Test and Evaluation
1.5.3Mock-ups / System Integration Labs (SILs)
1.5.4Test and Evaluation Support
1.5.5Test Facilities
1.6Training
1.6.1Equipment
1.6.2Services
1.6.3Facilities
1.7Data
1.7.1Technical Publications
1.7.2Engineering Data
1.7.3Management Data
1.7.4Support Data
1.7.5Data Depository
1.8Peculiar Support Equipment
1.8.1Test and Measurement Equipment
1.8.2Support and Handling Equipment
1.9Common Support Equipment
1.9.1Test and Measurement Equipment
1.9.2Support and Handling Equipment
1.10Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Site Construction
1.10.4Site/Ship Conversion
1.10.5Sustainment/Interim Contractor Support
1.11Industrial Facilities
1.11.1Construction/Conversion/Expansion
1.11.2Equipment Acquisition or Modernization
1.11.3Maintenance (Industrial Facilities)
1.12Initial Spares and Repair Parts
1.12.1INCO-I
1.12.2INCO-R
1.12.3Repair of Repairables
1.12.4Ship Spares
1.12.5Depot Spares

&20&A

Page &P of &N

CA-1 PWBS Definitions

SECTION L COST ATTACHMENT 1
Program Work Breakdown Structure (PWBS) Dictionary
PWBSTermDefinition
1.0AN/SPN-50(V)1Replacement Shipboard Air Traffic Radar for legacy CVN/LHA/D type ships
1.1Prime Mission Product(PMP)Combined subsystem prototype to provide the system level context for Technology maturation assestment of the subsystems. A relevant environment for demonstrating subsystem maturity.
1.1.1PMP Above DeckAny component of the system that will be above deck
1.1.1.1Antenna GroupSelf Explanatory
1.1.1.2AntennaSelf Explanatory
1.1.1.3ReceiverSelf Explanatory
1.1.1.4PedestalSelf Explanatory
1.1.2PMP Below DeckAny component of the system that will be below deck
1.1.2.1Radar Control GroupSelf Explanatory
1.1.2.2ReceiverSelf Explanatory
1.1.2.3TransmitterSelf Explanatory
1.1.3PMP Local Maintenance Set Control (LMSC)Local maintenance set control will be used to control the transmitter from the radar room.
1.1.4PMP Remote Radar Set Control (RRSC)Remote Radar Set Control will be used to control the transmitter from a remote location.
1.1.5PMP External ConnectionsAny system that must connect with the PMP
1.1.5.1NAVSSIHow system will be connected...software, cable, electrical, etc
1.1.5.2ECM Blanker System (AN/SLA-10)How system will be connected...software, cable, electrical, etc
1.1.5.3RADDS (AN/SPQ-12)How system will be connected...software, cable, electrical, etc
1.1.5.4Identify Friend or Foe (IFF)How system will be connected...software, cable, electrical, etc
1.1.5.5Display System (TPX-42)How system will be connected...software, cable, electrical, etc
1.1.5.6CTCC/AATCCHow system will be connected...software, cable, electrical, etc
1.1.6PMP Miscellaneous Components1..nAny component that was not accounted for elsewhere
1.1.7PMP Software Release 1…nResources associated with the PMP subsystem for release; one or more computer software configurations that satisfies a specific set or subset of requirements
1.1.8PMP Integration, Assembly, Test and CheckoutThe resources, materials and services involved in the integration, assembly, test and checkout of the PMP at appropriate site.

1.2 Platform Integration, Assembly, Test and Checkout The effort involved in providing technical and engineering services to the platform manufacturer or integrator during the installation and integration of the PMP into the host system.

1.3 Systems Engineering The technical and management efforts of directing and controlling a totally integrated engineering effort of a system of the program.

1.4 Program Management The business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives, which are not associated with specific hardware elements and are not included in system engineering.

1.5System, Test, and EvaluationThe use of pilot, prototype, production, or specifically gabricated hardware/software to obtain or validate engineering data on the performanceof the system. It also includes all effort associated with the development of any specialized tools or data in support of the system level test program.
1.5.1Development Test and EvaluationSelf Explanatory
1.5.2Operational Test and EvaluationThe test and evaluation conducted to assess the prospective system's utility, operational effectiveness, operational suitability, logistics supportability, cost of ownership, and need for any modifications.
1.5.3Mock-ups / System Integration Labs (SILs)The design engineering and production of system or subsystem mock-ups that have special contractual or engineering significance or that are not required solely for the conduct of one of the above elements of testing.
1.5.4Test and Evaluation SupportThe support elements necessary to operate and maintain, during test and evaluation, systems and subsystems, which are not consumed during the testing phase and are not allocated to a specific phase of testing.
1.5.5Test FacilitiesThe special test facilities required for performance of the various developmental tests necessary to prove the design and reliability of the system or subsystem.
1.6TrainingDeliverable training services, devices, accessories, aids, equipment, and parts used to facilitate instruction through which personnel will learn to operate and maintain the system with maximum efficiency.
1.6.1EquipmentDistinctive deliverable end items of training equipment, assigned by either a contractor or military service required to meet specific training objectives.
1.6.2ServicesDeliverable training services, accessorites, and aids necessary to accomplish trianing objectives
1.6.3FacilitiesFacilities required for performance of the various developmentaltests necessary to prove the design and reliability of the system or subsystem
1.7DataAll data items in support of the program.
1.7.1Technical PublicationsTechnical data, providing instructions for installation, operation, maintenance, training, and support, formatted into a technical manual
1.7.2Engineering DataRecorded scientific or technical information, regardless of form or method of recording, including computer software documetation
1.7.3Management DataData items necessary for configuration management, cost, schedule, contractual data management, program management, etc., required by government
1.7.4Support DataData Items designed to document support planning in accordance with functional categories
1.7.5Data DepositoryThe facility, including storage requirements, designated to act as custodian to maintain a master engineering specification and establish a drawing repository service for government approved documents that are the property of the US Government. This facility is a distinct entity that may hold electronic or hard copy data.
1.8Peculiar Support EquipmentThe design, development, and production of those deliverable items and associated software required to support and maintain the system or portions of the system while the system is not directly engaged in the performance of its mission, and which are not common support equipment.
1.8.1Test and Measurement EquipmentThe peculiar or unique testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support.
1.8.2Support and Handling EquipmentThe deliverable tools and handling equipment used for support of the mission system.
1.9Common Support EquipmentThe items required to support and maintain the system or portions of the system while not directly engaged in the performance of its mission, and which are presently in the DoD inventory for support of other systems.
1.9.1Test and Measurement EquipmentThe common testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support.
1.9.2Support and Handling EquipmentThe deliverable tools and handling equipment used for support of the mission system.
1.10Operational/Site ActivationThe real estate, construction, conversion, utilities, and equipment to provide all facilities required to house, service, and launch prime mission equipment at the organizational and intermediate level.
1.10.1System Assembly, Installation and Checkout on SiteThe materials and services involved in integrating the AN/SPN-50(V)1 PMP equipment onto the host platform.
1.10.2Contractor Technical SupportThe materials and services provided by the contractor related to activation.
1.10.3Site ConstructionReal estate, site planning and preparation, construction, and other special-purpose facilities necessary to achieve system operational status.
1.10.4Site/Ship ConversionThe materials and services required to convert existing sites, ships, or vehicles to accommodate the mission equipment and selected support equipment directly related to the specific system.
1.10.5Sustainment/Interim Contractor SupportThe complex of equipment (hardware/software), data, and services required to operate, maintain, support and modernize prime mission product of existing operational systems done before the Material Support Date (MSD).
1.11Industrial FacilitiesThe construction, conversion, or expansion of industrial facilities for production, inventory, and contractor depot maintenance required when that service is for the specific system.
1.11.1Construction/Conversion/ExpansionThe real estate and preparation of system peculiar industrial facilities for production, inventory, depot maintenance, and other related activities.
1.11.2Equipment Acquisition or ModernizationThe production equipment acquisition, modernization, or transferal of equipment for the particular system. This pertains to Government owned and leased equipment under facilities contract.
1.11.3Maintenance (Industrial Facilities)The maintenance, preservation, and repair of industrial facilities and equipment.
1.12Initial Spares and Repair PartsSpare parts and assemblies to establish relevant inventory and support prior to the Program's Material Support Date.
1.12.1INCO-IInitial installation and check out kit
1.12.2INCO-RRecurring installation and check out kit requriements
1.12.3Repair of RepairablesAll data items in support of the program.
1.12.4Ship SparesSuggested ship sparing requirements
1.12.5Depot SparesSuggested depot sparing requirements

&20&A

Page &P of &N

CA-2 CRM (-881 App B)

SECTION L COST ATTACHMENT 2

Work Breakdown StructureCLINSOW Paragraph
LEVEL1234
1.0AN/SPN-50(V)1 Shipboard Air Traffic Radar
1.1Prime Mission Product (PMP)00034.2, 8.0, 8.1, 8.2, 8.3
1.1.1PMP Above Deck00034.2
1.1.1.1Antenna Group00034.2
1.1.1.2Antenna00034.2
1.1.1.3Receiver00034.2
1.1.1.4Pedestal00034.2
1.1.2PMP Below Deck00034.2
1.1.2.1Radar Control Group00034.2
1.1.2.2Receiver00034.2
1.1.2.3Transmitter00034.2
1.1.3PMP Local Maintenance Set Control (LMSC)00034.2
1.1.4PMP Remote Radar Set Control (RRSC)00034.2
1.1.5PMP External Connections00034.2
1.1.5.1NAVSSI00034.2
1.1.5.2ECM Blanker System (AN/SLA-10)00034.2
1.1.5.3RADDS (AN/SPQ-12)00034.2
1.1.5.4Identify Friend or Foe (IFF)00034.2
1.1.5.5Display System (TPX-42)00034.2
1.1.5.6CTCC/AATCC00034.2
1.1.6PMP Miscellaneous Components...n00034.2
1.1.6.1Component 100034.2
1.1.6.2Component 200034.2
1.1.6.3Component 300034.2
1.1.6.4Component 4…n00034.2
1.1.7PMP Software Release…n00038.0, 8.1, 8.2, 8.3
1.1.7.1SW Release 100038.0, 8.1, 8.2, 8.3
1.1.7.2SW Release 200038.0, 8.1, 8.2, 8.3
1.1.7.3SW Release 300038.0, 8.1, 8.2, 8.3
1.1.7.4SW Release 4…n00038.0, 8.1, 8.2, 8.3
1.1.8PMP Integration, Assembly, Test and Checkout00034.2
1.2Platform Integration, Assembly, Test and Checkout00034.2
1.2.1Installation00034.2
1.2.2Drawings00034.2
1.2.3Test & Checkout00034.2
1.3Systems Engineering00037.0, 7.1, 7.2, 7.3, 7.5, 7.7, 10, 10.1, 10.7, 11.1, 11.2, 13, 13.1, 13.1.5, 14.4, 14.14,
1.4Program Management00035.0, 5.1, 5.2, 5.3, 5.4, 5.5, 5.6, 5.7, 5.8, 5.9, 5.10, 5.10.1, 5.11, 5.12, 5.13, 5.13.1, 5.14, 11, 12, 12.1, 12.2, 13.1.6, 14, 14.5, 14.12, 17, 17.1, 17.2, 17.3, 17.4, 17.5
1.5System, Test, and Evaluation000310.11.1, 10.11.2, 16.1, 16.2, 16.3, 16.4, 16.5, 16.6
1.5.1Development Test and Evaluation000310.11, 10.11.1, 10.11.2
1.5.2Operational Test and EvaluationN/A
1.5.3Mock-ups / System Integration Labs (SILs)N/A
1.5.4Test and Evaluation Support000316, 16.1, 16.2, 16.3, 16.4, 16.5, 16.6
1.5.5Test FacilitiesN/A
1.6Training000313.2
1.6.1Equipment000313.2.3
1.6.2Services000313.2.1, 13.2.2, 13.2.4, 13.2.5
1.6.3FacilitiesN/A
1.7Data00036.0
1.7.1Technical Publications000314.10
1.7.2Engineering Data00036.2, 6.3, 6.4, 6.8, 10.2, 10.3, 10.6, 10.8, 10.9, 10.10, 11.3, 11.4, 13.1.1, 13.1.2, 13.1.3, 13.1.4, 14.1, 14.1.1, 14.2
1.7.3Management Data00036.8, 6.9, 12.2.1, 12.2.2, 14.11, 14.2, 14.13, 18
1.7.4Support Data00036.5, 6.6, 6.7, 9.0, 9.1, 9.2, 9.3, 10.5, 10.11.3, 10.11.4, 14.3, 14.6, 14.7, 14.8, 15, 15.1, 15.2
1.7.5Data Depository00036.1, 14.9, 14.9.1
1.8Peculiar Support Equipment000314.11
1.8.1Test and Measurement Equipment000314.11
1.8.2Support and Handling Equipment000314.11
1.9Common Support Equipment000314.11
1.9.1Test and Measurement Equipment000314.11
1.9.2Support and Handling Equipment000314.11
1.10Operational/Site ActivationN/A
1.10.1System Assembly, Installation and Checkout on SiteN/A
1.10.2Contractor Technical SupportN/A
1.10.3Site ConstructionN/A
1.10.4Site/Ship ConversionN/A
1.10.5Sustainment/Interim Contractor SupportN/A
1.11Industrial FacilitiesN/A
1.11.1Construction/Conversion/ExpansionN/A
1.11.2Equipment Acquisition or ModernizationN/A
1.11.3Maintenance (Industrial Facilities)N/A
1.12Initial Spares and Repair Parts00034.2, 15.3, 15.4
1.12.1INCO-IN/A
1.12.2INCO-RN/A
1.12.3Repair of Repairables000314.9.2, 15.3, 15.4
1.12.4Ship Spares00034.2
1.12.5Depot SparesN/A

&A

Page &P of &N

CA-3 2794, Pg 1 (CSDR Plan)

SECTION L COST ATTACHMENT 3
COST AND SOFTWARE DATA REPORTING PLANForm Approved

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-ABC-FRPINITIAL
AC-LRIPO&SCHANGE
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONRDT&E
CONTRACT (SUB)PROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

&A

Page &P of &N

CA-3 2794, Pg 2 (CSDR Plan)

SECTION L COST ATTACHMENT 3

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)

15. REMARKS

DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE

&A

Page &P of &N

CA-4 RDT - Contract

SECTION L COST ATTACHMENT 4
Resource Distribution Table (RDT)
AN/SPN-50(V)1 - Contract Plan
Prime ContractorSubcontractors
Prime Contractor or Sub-ContractorTotalIn-HouseTotalSubcontractor 1Subcontractor 2Subcontractor 3Subcontractor 4Subcontractor 5Subcontractor 6
Description
Contractor/Organization Name
Contractor/Organization Location
Contract Number
Total Program Office or Contract/Effort Value (Estimated), TY$M
Subtotal Software Contract Value (Estimated), TY$M
Program Office
CSDR Direct Reporting per CWIPT (Yes/No)
SRDR Direct Reporting per CWIPT (Yes/No)
WBS NUMBERSWBS Element Name
L1L2L3L4
1.0AN/SPN-50(V)1 Shipboard Air Traffic Radar
1.1Prime Mission Product (PMP)
1.1.1PMP Above Deck
1.1.1.1Antenna Group
1.1.1.2Antenna
1.1.1.3Receiver
1.1.1.4Pedestal
1.1.2PMP Below Deck
1.1.2.1Radar Control Group
1.1.2.2Receiver
1.1.2.3Transmitter
1.1.3PMP Local Maintenance Set Control (LMSC)
1.1.4PMP Remote Radar Set Control (RRSC)
1.1.5PMP External Connections
1.1.5.1NAVSSI
1.1.5.2ECM Blanker System (AN/SLA-10)
1.1.5.3RADDS (AN/SPQ-12)
1.1.5.4Identify Friend or Foe (IFF)
1.1.5.5Display System (TPX-42)
1.1.5.6CTCC/AATCC
1.1.6PMP Miscellaneous Components...n
1.1.6.1Component 1
1.1.6.2Component 2
1.1.6.3Component 3
1.1.6.4Component 4…n
1.1.7PMP Software Release…n
1.1.7.1SW Release 1
1.1.7.2SW Release 2
1.1.7.3SW Release 3
1.1.7.4SW Release 4…n
1.1.8PMP Integration, Assembly, Test and Checkout
1.2Platform Integration, Assembly, Test and Checkout
1.2.1Installation
1.2.2Drawings
1.2.3Run/Flight Test
1.3Systems Engineering
1.4Program Management
1.5System, Test, and Evaluation
1.5.1Development Test and Evaluation
1.5.2Operational Test and Evaluation
1.5.3Mock-ups / System Integration Labs (SILs)
1.5.4Test and Evaluation Support
1.5.5Test Facilities
1.6Training
1.6.1Equipment
1.6.2Services
1.6.3Facilities
1.7Data
1.7.1Technical Publications
1.7.2Engineering Data
1.7.3Management Data
1.7.4Support Data
1.7.5Data Depository
1.8Peculiar Support Equipment
1.8.1Test and Measurement Equipment
1.8.2Support and Handling Equipment
1.9Common Support Equipment
1.9.1Test and Measurement Equipment
1.9.2Support and Handling Equipment
1.10Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Site Construction
1.10.4Site/Ship Conversion
1.10.5Sustainment/Interim Contractor Support
1.11Industrial Facilities
1.11.1Construction/Conversion/Expansion
1.11.2Equipment Acquisition or Modernization
1.11.3Maintenance (Industrial Facilities)
1.12Initial Spares and Repair Parts
1.12.1INCO-I
1.12.2INCO-R
1.12.3Repair of Repairables
1.12.4Ship Spares
1.12.5Depot Spares
1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the
Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform
to the applicable rules established for the Program Plan RDT
2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.

&A

Page &P of &N

CA-5 1921

SECTION L COST ATTACHMENT 5
COST SUMMARY
DD 1921
Base Year ____
1. PROGRAM2. RFP NO:5.PRIME/ASSOCIATESUBCONTRACTOR
(Name and address,
3.include ZIP Code)
RESERVED FOR FUTURE USE
WBSCONTRACTNUMBERPROPOSED PRICESPERFORMANCE WORK
ELEMENTREPORTING ELEMENTSLINEOF(in Thousands $)STATEMENTRESPONSIBLE
CODEITEMUNITSNON. REC.REC.TOTALPARAGRAPH (S)ORGANIZATION
ABCDEFGHI
Note: Include WBS at the lowest level at which your estimate was developed.

&A

Page &P of &N

CA-6 1921-1

SECTION L COST ATTACHMENT 6
Functional Cost-Hour Report (Modified DD 1921-1 Form)
1. PROGRAM2.6.BASE YEAR:
RESERVED FOR FUTURE USE

A 3. DOLLARS IN 4. HOURS IN 5. RFP NO.

n
o7. PRIME/ASSOCIATESUBCONTRACTOR8. WBS REPORTING ELEMENT (S)
iNote: Include WBS at the lowest level at which your estimate was developed.
t
c
e
S
IN HOUSESUBCONTRACTORCONTRACTOR
OUTSIDE PROD. & SERV.& SUBC.
FUNCTIONAL CATEGORIESNRERECTOTALNRERECTOTALTOTAL
abcd = b + cefg = e + fh = d + g
ENGINEERING
1. DIRECT LABOR HOURS
2. DIRECT LABOR DOLLARS
3. OVERHEAD
4. MATERIAL
5. OTHER DIRECT CHARGES (Specify)
6. TOTAL ENGINEERING DOLLARS
TOOLING
7. DIRECT LABOR HOURS
8. DIRECT LABOR DOLLARS
9. OVERHEAD
B10. MATERIALS AND PURCHASED TOOLS
11. OTHER DIRECT CHARGES (Specify)
n12. TOTAL TOOLING DOLLARS
oQUALITY CONTROL
i13. DIRECT LABOR HOURS
t14. DIRECT LABOR DOLLARS
c15. OVERHEAD
e16. OTHER DIRECT CHARGES (Specify)
S17. TOTAL QUALITY CONTROL DOLLARS
MANUFACTURING
18. DIRECT LABOR HOURS
19. DIRECT LABOR DOLLARS
20. OVERHEAD
21. MATERIALS AND PURCHASED PARTS
22. OTHER DIRECT CHARGES (Specify)
23. TOTAL MANUFACTURING DOLLARS
OTHER COSTS
24. PURCHASED EQUIPMENT & SERVICES
25. MATERIAL OVERHEAD
26. OTHER COSTS NOT SHOWN ELSEWHERE (Specify)
FUNCTIONAL COST-HOUR SUMMARY
27. TOTAL COST LESS G&A
28. G&A (Total contract only)
29. TOTAL COST PLUS G&A
30. PROFIT/FEE
31. COST OF MONEY
31. TOTAL PRICE (Sum of lines 29, 30, and 31)

&A

Page &P of &N

CA-7 Substantiation

SECTION L COST ATTACHMENT 7
COST SUBSTANTIATION
WBS __Note: Include WBS at the lowest level at which your estimate was developed.____________
1. PROGRAM
LABOR / MATERIALCOST ESTIMATE TY$ANALOGOUS COST TY$
BREAKOUTABCDEFGH
1921-1ContractorContractorContractorSubcontractorSubcontractorSubcontractor1921-1ContractorContractorContractorSubcontractorSubcontractorSubcontractor
CategoryLabor HoursLabor CostMat'l CostLabor HoursLabor CostMat'l CostCategoryLabor HoursLabor CostMat'l CostLabor HoursLabor CostMat'l Cost
Nonrecurring

Recurring

TOTAL
TOTAL COST ESTIMATE (TY$) A+B+C+DTOTAL COST ANALOGOUS EFFORT (TY$) E+F+G+H

DESCRIPTION OF WORK CONTENT / TECHNICAL PARAMETERS DESCRIPTION OF DIFFERENCES IN WORK CONTENT

ESTIMATE BASE BASE COST TY$ ADJUSTMENTS / CALCULATIONS ADJUSTMENTS COST TY$ TOTAL COST ESTIMATE (TY$)

DESCRIPTION OF ESTIMATE BASE / PROCESS DESCRIPTION OF ADJUSTMENTS / CALCULATIONS OTHER (IF NECESSARY)

&A

Page &P of &N

CA-8 Software

SECTION L COST ATTACHMENT 8
SOFTWARE
SOFTWARE LINES OF CODEWBS ElementLANGUAGEMATURITY FACTORAPPLICATIONSEI RATINGNEW OR UPGRADERADAR SOFTWARE (RADAR or OTHER)PRODUCTIVITY
(Hours and Subcontract dollars)HISTORICAL BASISTOTAL EXISTING SLOCNEW SLOCREUSE SLOCMODIFIED SLOCCOTS SLOCTOTAL SLOCESLOCESLOC CALC
CSCI A0
CSCI B0
CSCI…0
TOTAL0
SW PRODUCTIVITY ELEMENTSIs this Element included in Productivity? (Yes/No)
IEEE/EIA 12207 Elements
Subsystem SW requirements analysis
Subsystem SW architectural design
Subsystem SW detailed design
Subsystem SW coding and test
Subsystem SW integration
Subsystem SW qualification testing
Additional Elements
SW quality assurance
SW configuration management
SW management
SW Productivity Map
Productivity ElementWBS ElementHours and Subcontract dollarsSubstantiation / Rationale (May use cost proposal reference)
NEW OR UPGRADE
Software Line of Code NomenclatureWBS ElementSubstantiation / Rationale (May use cost proposal reference)
CSCI A
CSCI B
CSCI…
RADAR SOFTWARE
Software Line of Code NomenclatureWBS ElementSubstantiation / Rationale (May use cost proposal reference)
CSCI A
CSCI B
CSCI…
DIRECTIONS:
1) For each WBS element provide requested data for each CSCI. Expand table as required to include all CSCIs. If SLOC estimates are done at a lower level expand table to include sub-indentured items such as CSCs or CSUs.
2) SLOC should be in LOGICAL lines of code.
3) In the SW Productivity Elements table, identify which elements are included in the proposed Productivity hours and Subcontract dollars. For ALL elements NOT included in the SW Productivity Elements table (that is, if "No" was selected in the SW Productivity Elements Table), provide the location in the cost proposal of the Productivity hours and/or subcontract dollars for these elements in the SW Productivity Map table.

DEFINITIONS:

LANGUAGE= Higher Order Language (HOL) used for coding. NOTE: Assembly Language is considered HOL for estimating purposes
MATURITY FACTOR= Assessment of how much is known about the software at time of size estimation. See Table 1 below for selections
APPLICATION= Intended use of Software. See Table 2 below
SEI RATING= CMMI rating of Organization developing software
PRODUCTIVITY= Provide productivity in terms of person hours and subcontract dollars (if applicable).
HISTORICAL BASIS= Historical basis of productivity metric.
TOTAL EXISTING SLOC= Number of Logical Source Line of Code (SLOC) of preexisting legacy Software
NEW SLOC= Number of newly developed logical source lines of code (SLOC)
REUSE SLOC= Number of existing logical source lines of code (SLOC) reused without modification
MODIFIED SLOC= Number of existing logical source lines of code (SLOC) that will be modified
COTS SLOC= Number of logical source lines of code (SLOC) of Commercial Off-The-Shelf (COTS) with which application will be integrated
TOTAL SLOC= Summation of NEW, REUSE, MODIFIED, and COTS logical source lines of code
ESLOC= Equivalent new line of code calculated from NEW, REUSE, MODIFIED, and COTS SLOC
ESLOC CALC= Formula used for ESLOC calculation. Example: ESLOC = New + x%*reuse + y%*modified + z%*COTS
BIT= Built in test
PHM= Prognostic and Health Management
Table 1: MATURITY FACTOR
The maturity factor is a means of assessing how good the size estimates for the CSCI are. It is logical that size inputs provided at the Preliminary Design Review would have much less potential for growth than the initial size estimate.
Initial Cost Estimate - Reflects a program understanding approximately 1 - 2 years prior to award and the high uncertainty surrounding requirements and sizing inputs well in advance of award.
CARD Completed - Reflects a program understanding approximately 6 months prior to award. Frequently there will be an incomplete System Segment Specification and limited inputs from potential developers.
SRR Completed - Reflects a program understanding near contract award. Typically the preliminary system segment specification is complete and all CSCIs identified. Significant knowledge of similar systems and reuse is known.
SDR Completed - Reflects a program understanding when the system functional baseline, system segment specification, and software development plan are completed. Typically software requirements and Interface specifications will still be in a preliminary stage.
SSR Completed - Reflects a program understanding when all CSCI requirements are identified and defined (functional performance, database, testing), requirement and interface specification are done and the System Allocated Baseline is complete.
PDR- Preliminary Design Review is held.
CDR- Critical Design Review is held.
End of CSCI Testing Completed - Reflects completed and delivered software.
Table 2: APPLICATION
Airborne Software - Flight Critical
Airborne Software - Mission Critical
Airborne Software - Non-Critical
Shipboard or Van Software - Flight Critical
Shipboard or Van Software - Mission Critical
Shipboard or Van Software - Non-Critical
Ground Software - Flight Critical
Ground Software - Mission Critical
Ground Software - Non-Critical
Table 3: NEW OR UPGRADE
Designate CSCI as "New" if software development effort is being estimated for a new system. CSCIs with an identifiable heritage system or requiring a significant level of reuse code should be designated as "UPGRADE"
Table 4: RADAR SOFTWARE
Designate CSCI as "Radar" when the software being developed is intended for use in a radar or similar type system (i.e. jammer systems and/or other algorithmic intensive code). NOTE: This includes but is not limited to modes, beam steering, exciter, BIT, PHM, and signal processing. Also, Software written for radars, but are support or mission related should be designated as "Other."
Yes
No

&A

Page &P of &N

CA-9 SEPM

SECTION L COST ATTACHMENT 9
SEPM Work Years Level Of Effort (LOE) Staffing Matrix
SE/PM (Equivalent Head-Counts by Yr)FY07FY08FY09FY10FY11FY12FY13FY14FY15TOTAL
Non-ILS
Systems Engineering
Prime
Sub 1
Sub 2
Sub n
Program Management
Prime
Sub 1
Sub 2
Sub n
ILS
Systems Engineering
Prime
Sub 1
Sub 2
Sub n
Program Management
Prime
Sub 1
Sub 2
Sub n

&A

Page &P of &N

CA-10 Skill Mix_Rates

SECTION L COST ATTACHMENT 10
SKILL MIX / COMPOSITE DIRECT LABOR RATE

Base Year ____

1. WBS Element1921-1 LABOR CATEGORY (1)LABOR RATE CATEGORY (2)LABOR RATE (TY$/HR) (3)SKILL MIX PERCENTADJUSTED LABOR RATE (TY$/HR)COMPOSITE LABOR RATE (TY$/HR) (4)
a.b.c.d.e.f = d*eg= Sum of f
Example:
X000EngineeringDesign Engineer40.0025%10.00
Test Engineer30.0010%3.00
General Engineer27.0050%13.50
Eng. Technician15.0015%2.2528.75
ManufacturingManufacturing 128.0060%16.80
Manufacturing 213.0040%5.2022.00
NOTES:
(1) Provide for each Fiscal Year by a minimum of Level 2 of the CWBS.
(2) Provide for all Modified DD Form 1921-1 Labor Categories as needed (i.e., Engineering, Manufacturing, Tooling, Quality Control).
(3) Provide Labor Category descriptions / titles as defined by the accounting structure with a link to specific rate negotiation agreements
(e.g., FPRAs). For example, Engineering may be divided into: Design Engineering, Test Eng., General Eng., Eng. Technician, etc.
(4) Labor Rate should trace directly to current rate notices such as FPRA, AWD or CBA.
(5) Composite Labor Rate should trace directly to Modified DD Form 1921-1 Functional Labor Category.
Labor Rate Definitions (explain what tasks are being performed under each functional labor category):

&A

Page &P of &N image1.emf image2.png

File details come from the government source that posted it. Updated .