2015_10_06_SPN50_CDRLS.pdf

PDF 3 MB Posted

Attached to
AN-SPN-50(V)1 - Procurement Federal contract opportunity
Solicitation number
N00019-15-R-0081
Issued by
Department of the Navy Naval Air Systems Command

About this file

Updated CDRLs for Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to AN-SPN-50(V)1 - Procurement, newest first.
File Type Posted
Questions_and_Answers_16.Nov.15_amend_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007.pdf PDF
Amend_0007_CDRLs.pdf PDF
SF30_Amendment_0007.pdf PDF
SPN-50_SOW_dtd_16_Nov_2015_amend_0007_with_track_changes.pdf PDF
One_Time_DID_CDRLS_A001_A017_A075.pdf PDF
OT-16-20007_Installation_Test_Procedures_PMA213_(3)20151019.pdf PDF
N00019_15_R_0081_0006_10.20.15.pdf PDF
OT-16-20005_SPN50_LeadTimeItems_(3)20151019(Rev1).pdf PDF
OT-16-20006_LCC_ISA_Rpt_PID0002_(3)20151019.pdf PDF
13_October_Industry_Questions.pdf PDF
N00019-15-R-0081-0005.pdf PDF
SPN_50_Amendment_0004.pdf PDF
SPN-50_SOW_10.05.15.pdf PDF
SPN-50_SOW__10.05.15(tracked_changes).pdf PDF
RFP_09.18.15_(track_changes).pdf PDF
SPN-50_Cost_Attachments_10-02-15.xlsx XLSX spreadsheet
Responses_to_QAs_(formal_RFP)_10.6.15.pdf PDF
SPN_50_Amendment_3.pdf PDF
SPN_50_Amendment_2.pdf PDF
SPN_50_Amendment_1.pdf PDF
SPN-50_Cost_Attachments_09-21-15.xlsx XLSX spreadsheet
RFP_dated_18_September_2015.pdf PDF
SPN-50_SOW_--draft_--dated_10_March_2015(vpa).docx DOCX document
cdrl-specs-Draft-RFP_03_4_15.pdf PDF
N00019-15-R-0081__DRFP_3_Mar.10.15.doc DOC document
CDRLs_(2).pdf PDF
Statement_of_Work_for_Shipboard_Air_Traffic_Radar_(SATR)_SPN-50(V)(1).pdf PDF
SPN-50_RFP.pdf PDF
SPN-50_Questions_and_Answers.pdf PDF
2015_Industry_Day_General_Session_Slides.ppt PPT presentation
SPN-43C_Capabilities.pptx PPTX presentation
Industry_Day_Mar_2015_Questions_and_Answers_dtd_4_May_2015.pdf PDF
N00019-15-R-0081__DRFP_3_for_SPN50.doc DOC document
SPN-50_CDRLs_11Mar15.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. b104-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

AN/SPN-50(V)1

B. EXHIBIT

A

E. CONTRACT/PR NO.

N00019-15-R-0081

IC. CATEGORY

SESS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

A001 Installation Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

OT -15-20064

7. DO 250

REO

DO

9. DIST STATEMENT

REQUIRED

8.APPCODE C

A(See Block 16)

16. REMARKS

SOW Para 4.1 4.2

10. FREQUENCY 12. DATE OF FIRST

ASREQ (See Block suBMISSION .

16) See Block 16

11.ASOFDATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

PID: N00019-16-P1-PMA-213-0002

Block 8: The Government will have 30 calendar days after submission for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 10, 12,13: Submission 30 working days after installation/operational checkout of the SIL facility at Webster Field Annex.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

G. PREPARED BY

Margaret Fitzgerald

H. DATE

10/5/2015

I. APPROVED BY

F. CONTRACTOR

3. SUBTITLE

Installation and Acceptance Test Plan

6. REQUIRING OFFICE

NAWCAD 6.6.2.6

14. DISTRIBUT;.::IO:.:.;N ____ _

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

NAWCAD 6.6.2.6

PMA213H1

DCMA-ACO

15. TOTAL

J.DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

~~-rrw ~ 1-z.- Janice~~, 1 / )<JR.~ OCT 0 6 20JS DO FORM 1423·1, FEB 2001 PREVIOUS EDITION MAY BE USED. l) 0

CONTRACT DATA REQUIREMENTS LIST Form A~fcroved (1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081 c"

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Technical Report- Study/Services Facilities Requirements Document I (FRO l and Site Survey

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B SOW para4.1 NAWCAD 6.6.2.6

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ONE/R SUBMISSION

b. COPIES

DD 90DAC

a. ADDRESSEE Final S.APP CODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PID: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 30 calendar days for review DCMA-ACO and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government Final Disposition is required 15 calendar days after incorporation of comments by the contractor.

BLOCK 14:AII data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Roger Thomas 10/5/2015 Janice Zilch

··/ ~ ]\.~-/ . 0 ?p_~ OCT 0 6 2

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE. USED. G 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

_(_ 1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information .. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlin8'on, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT l C. CATEGORY

0004 A OTHER SE

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A003 Product Drawings/Models And Associated Product Drawings and Associated Lists Lists

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000E (see block 16 SOW oara 4.1 4.2 14.1.1 NAWCAD 6.6.2.6

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REO REQUIRED ONE/R SUBMISSION

b. COPIES

DD SEE BLOCK 16

a. ADDRESSEE Final S.APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block SEE BLOCK 16 Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PID: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 30 calendar days for review DCMA-ACO and comment . The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval is required 15 calendar days after incorporation of comments by the contractor.

Block 12, 13: Submissions due, in digital format, 40 calendar days prior to the start of all SETR events.

BLOCK 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Roger Thomas 10/5/2015 Janice Zilch

~ 9!J<;!(;__ PCT 06 201~

DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l u

17. PRICE GROUP

18. ESTIMATED

( 1 Data Item) OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlinton, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT l C. CATEGORY

0004 A TM

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. .12. TITLE OF DATA ITEM 3. SUBTITLE

A004 Technical Manuals SATR IETM and Technical Manuals

4. AUTHORITY (Data Acquisilion Documenl No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-TMSS-81814A SOW oara 14.10 NAWCAD 6.6.2.6

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ASREQ SUBMISSION

b. COPIES DO See Block 16

a. ADDRESSEE Final 8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PID: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government shall have 90 calendar days for review DCMA-ACO and comment. The Contractor will have 30 calendar days to incorporate Government comments. Subsequent Government final disposition is due 60 calendar days after incorporation of comments by the Contractor.

Block 12,13: Draft deliveries required throughout development to support In Process Reviews (IPRs). Final delivery due 30 calendar days prior to the Functional Configuration Audit (FCA).

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Roger Thomas 10/5/2015 Janice Zilch , ~~r~ Q)j:<f~ I DCT 0 6 20h DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. G u

17. PRICE GROUP

( 1 Data Item)

Form Approved OMB No. 0104-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

I c. CATEGORY

IPS

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

D. SYSTEM/ITEM E. CONTRACT/PR NO.

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

A005 Scientific and Technical Reports

4. AUTHORITY (Dala Acquisition Document No.) 5. CONTRACT REFERENCE

DI-MISC-80711A SOW para 14.9.1 14.9.2

7. DO 250

REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

DD

8.APPCODE C

A (See Block 16)

16. REMARKS

ONE/R

11. AS OF DATE

N/A

PID: N00019-16-P1-PMA-213-0002

See block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Block 12, 13: First submission 60 calendar days prior to FCA.

BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval is required 15 calendar days after incorporation of comments by the contractor.

BLOCK 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

H. DATE I. APPROVED BY

F. CONTRACTOR

3. SUBTITLE

Packaging, Handling, Storage and Distribution (PHS& T) Plan

6. REQUIRING OFFICE

NAWCAD 6.6.2.6

14. DISTRIBUT;.::IO;:..:N ____ _

b. COPIES

a. ADDRESSEE Final

Draft Reg. Repro

NAWCAD 6.6.2.6

PMA213H1

DCMA-ACO

15. TOTAL

J. DATE G. PREPARED BY

Roger Thomas

10/5/2015 Janice Zilch , ~"\.&~~ CA!J~t- OCT 0 6 2015

DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. U L)

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST I Form A~fcroved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Hitway, Suite 1204, Arlinton, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (070 -0188), Washington, D 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E. · A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MFFP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A006 Corrosion Prevention and Control Plan Corrosion Control Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUiRING OFFICE

DI-MFFP-81403 SOW para 13.1.5 NAWCAD 6.6.2.6

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ONE/R SUBMISSION

b. COPIES

DD SEE BLOCK 16

a. ADDRESSEE Final 8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A (See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PID: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government will have 30 calendar days for review and DCMA-ACO comment. The Contractor will have 15 calendar days to incorporate .

Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 12: Submission 40 calendar days prior to FCA.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

i

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY I J. DATE

Roger Thomas 10/5/2015 Janice Zilch 1 , f2~r·~ 9ij~llrr-- CT 0 6 201~ DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. ll l J

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT ,C. CATEGORY

0004 A ILSS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)_1 N00019-15-R-0081

1. DATA ITEM NO. I~· TITLE OF DATA ITEM 3. SUBTITLE

A007 As Built Configuration List (ABCL) (MIL-STD- Bill of Materials (BOM) 3046)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81830 SOW para 4.1 4.2 14.4 NAWCAD 6.6.2.6

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ONE/R SUBMISSION

b. COPIES DD see Block 16

a. ADDRESSEE Final 8.APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block See Block 16 Draft Reg. Repro

16)

16. REMARKS

NAWCAD 6.6.2.6 PID: N00019-16-P1-PMA-213-0002

PMA213H1

Block 8: The Government will have 30 calendar days for review and DCMA-ACO comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 12,13: Submissions due 60 calendar days prior to each SETR event.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Roger Thomas 10/5/2015 Janice Zilch '

--~~··-, () ~211 c-- 7 !\.

I CT 0 6 20H

DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l u

17. PRICE GROUP

(1 Data Item) ·

Form A~Pcroved OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A EMCS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 Spectrum Certification Spectral Characteristics Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-EMCS-81827 SOW para 4.1, 4.2, 9.1, 9.2, AIR4.1.M.3 9.3

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ONE/R SUBMISSION

b. COPIES

DD SEE BLOCK 16

a. ADDRESSEE Final S.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block SEE BLOCK 16 Draft Reg. Repro

16)

16. REMARKS

AIR4.1.M.3 PID: N00019-16-P1-PMA-213-0002

PMA213H1

BLOCK 8: The Government will have 30 calendar days for review DCMA-ACO and comment. The Contractor shall have 15 calendar days to incorporate Government comments. Subsequent Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

Block 12, 13: First submission of the EL CID data shall be as soon as the equipment characteristics, nomenclature and operational environments are known, but no later than 60 calendar days after contract award. The subsequent submission shall occur 180 calendar days prior to Milestone C.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

10/1/2015 Janice Zilch

I~ CT 0 6 201~

~ QJJ£~~

DO FORM 1423-1, FEB 2001 PREVIOU!'EDITION MAY BE USED. G u

17. PRICE. GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A009 Contractor's ConfiQuration ManaQement Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80858B SOW para 4.2 6.1 6.2 AIR-1.3.3

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REO REQUIRED ONCE SUBMISSION

b. COPIES

DD 60DAC

a. ADDRESSEE Final S.APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16. REMARKS

AIR 1.3.3 PID: N00019-16-P1-PMA-213-0002

AIR 2.2.1.4

Block 8: The Government will have 30 calendar days to review and PMA213H1 comment The Contractor will have 30 calendar days to incorporate

DCMA-ACO Government comments. Subsequent Government Final Disposition is required 20 calendar days after incorporation of comments by the Contractor.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Brian Know~d, d 10/1/2015 Janice Zilch

~:A ~I!~ 91j~Jc,- OCT 0 6 201

DD FoRM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l u

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I~· CATEGORY

0004 A CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. ,2. TITLE OF DATA ITEM 3. SUBTITLE

A010 Baseline Description Document Confiouration Item List

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81121A SOW para 4.2 6.2 AIR-1.3.3

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REO REQUIRED ONCE SUBMISSION

b. COPIES

DD SEE BLOCK 16

a. ADDRESSEE Final 8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A(See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16.REMARKS

AIR 1.3.3 PID: N00019-16-P1-PMA-213-0002

DCMA-ACO

Block 4: See also, DID DI-SESS-81879 (Army), for reference. PMA-213H

BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Government final disposition is required 20 calendar days after incorporation of comments.

BLOCK 12: Submission due 90 calendar days after CDR.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Brian Knownon L 10/1/2015 Janice Zilch

~-{K"·~. 9~~~ ( CT 0 6 2015 ..rr ....... - DD FORM 1423-c1, FEB 2001 PREVIOUS EDITION MAY BE USED. C) u

17. PRICE GROUP

_i 1 Data Item) OMS No. 04-0188

Public reporting burden for this collection of information is estimated to average 11 0 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlinton, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT l C. CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 NOOO 19-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011 Contract Work Breakdown Structure Contractor Cost and Software Data Reoortina (CSDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81334D (See Block 16) SOW Para 5. 1 5. 11 AIR4.2

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED See Block 16 SUBMISSION

b. COPIES

LT SEE BLOCK 16

a. ADDRESSEE Final B.APPCODE c 11.AS OF DATE 13. DATE OF SUBSEQUENT

N/A SEE BLOCK 16 SUBMISSION

Draft Reg. Repro

SEE BLOCK 16

16. REMARKS

AIR 4.2.1.2 PID: N00019-16-P1-PMA-213-0002

PMA213H1

Block 4: Prepare the CWBS in accordance with DI-MGMT-81334D, ACO the CSDR Manual (DoDM 5000.04-M-1 ), and the OSD Deputy

DC ARC Director, Cost Assessment-approved contract CSDR Plan.

Block 10,11, 12,13: Deliver in accordance with CSDR Manual (DoD 5000.4M-1 ). The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs

Contractors shall be required to submit CCD reports at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. All CCD reports shall be submitted electronically using the CSDR Submit-Review System. The required file format for each CCD report is specified in its Data Item Description {DID). The CWBS Index and Dictionary must be submitted in Microsoft Word-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. DCARC Portal users with a DoD-issued CAC shall be able to register their CAC with their DCARC Portal account, enabling CAC login. Prime Contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

JooJ"Z:/Cft/1 10/1/2015 Janice Zilch

Q!)~'c-- ~CT 0 6 201 DO FORM t3-1, FE~O<k' !.pREVIOUS EDITION MAY BE USED. () 0

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT l C; CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A012 Mana~:~ement Plan lnte~:~rated Master Plan (IMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT -80004A SOW para 5.2 AIR-1.3.3

7. DD 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED ONCE SUBMISSION

b. COPIES DD lisee block 16)

a. ADDRESSEE Final B.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

A (See N/A SUBMISSION

Block N/A Draft Reg. Repro

16)

16. REMARKS

AIR 1.3.3 PID: N00019-16-P1-PMA-213-0002

DCMA-ACO

BLOCK 8: The Government will have 40 calendar days for review PMA213H1 and comment. The Contractor will have 20 calendar days to

AIR 2.2.1.4 incorporate Government comments. Government final disposition is required 15 calendar days after incorporation of comments by the contractor.

BLOCK 12: Within ten working days after contract award.

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Micha~ 10/6/2015 Janice Zilch .

---;> J ~0 9 !) ?!! c,_-- 0( T 0 6 2015 DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. l u

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST Form A~rcroved (1 Data Item) · OMB No. 04-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A CONTRACT LINE ITEM NO. B. EXHIBIT _lc. CATEGORY

0004 A FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V}1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 Cost Data Summary Report (DD Form 1921) Contractor Cost and Software Data Reportinq (CSDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81565C (See Block 16) SOW Para 5.2 5.3 AIR4.2

7. DD250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED See Block 16 SUBMISSION

b. COPIES LT See Block 16

a. ADDRESSEE Final 8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

N/A See Block 16 SUBMISSION Repro

See Block 16 Draft Reg.

16. REMARKS

AIR 4.2.1.2 PID: N00019-16-P1-PMA-213-0002

DCARC

Blocks 10 - 13: Prepare the Cost Data Summary Report (CDSR) in PMA213H1 accordance with DI~FNCL-81565C (or the most recently approved

AIR 4.2.1.2 version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81565C, is DCMA-ACO available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.

All CCDRs shall be submitted electronically using the CSDR Submit -Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This il')cludes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

15. TOTAL

The prime contractor shall be required to work with the .CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.

~;~2Jii~/l

H. DATE I. APPROVED BY J. DATE

10/1/2015 Janice Zilch ' 0( T 0 6 2015

CA!J~c-- I I' v

G (j

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 Cost Data Summary Report (DD Form 1921) Contractor Cost and Software Data ReportinQ (CSDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81565C (See Block 16) SOW Para 5.2 5.3 AIR4.2

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED See Block 16 SUBMISSION

b. COPIES LT See Block 16

a. ADDRESSEE Final 8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

Reg., Repro N/A See Block 16 SUBMISSION

See Block 16 Draft

Block 14: All data shall be posted to the PMA213 Electronic data reoositorv with notification to the distribution list in Block 14.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE Joc;;ng CfJ I 10/1/2015 Janice Zilch

901Jic-- ( CT 0 6 201 ~

DO FORM.A'423-1, FEB 2ojf f/REVIOUS EDITION MAY BE USED. G (J

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Hitway, Suite 1204, Arlin8ton, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (070 -0188), Washington, D 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT lC. CATEGORY

0004 A FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 12. TITLE OF DATA ITEM 3. SUBTITLE

A014 Functional Cost-Hour Report (DD Form 1921- Contractor Cost and Software Data

1) Reoortino (CSDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81566C (See Block 16) SOW Para 5.4 AIR4.2

7. DD250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REO REQUIRED See Block 16 SUBMISSION

b. COPIES

LT SEE BLOCK 16

a. ADDRESSEE Final

8. APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

N/A SEE BLOCK 16 SUBMISSION Repro

(See Block 16) Draft Reg.

16. REMARKS

AIR4.2.1.2 PID: N00019-16-P1-PMA-213-0002

DCMA-ACO

Blocks 10 - 13: Prepare the Functional Cost Hour Report (FCHR) in PMA213H1 accordance with DI-FNCL-81566C (or the most recently approved

DCARC version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81566C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plans are included as contract attachments.

Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan

All CCDRs shall be submitted electronically using the CSDR Submit -Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID}. Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

15. TOTAL

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Joroan ?JAg cJ, 10/1/2015 Janice Zilch ( CT 0 6 2015 u ~4-t~-t----7'\

I I v u u

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B.' EXHIBIT I c. CATEGORY

0004 A FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. ,2. TITLE OF DATA ITEM 3. SUBTITLE

A014 Functional Cost-Hour Report (DO Form 1921- Contractor Cost and Software Data

1) Reportina (CSDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81566C (See Block 16) SOW Para 5.4 AIR4.2

7. DD250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED See Block 16 SUBMISSION

b. COPIES

LT SEE BLOCK 16

a. ADDRESSEE Final

8. APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

Reg., Re~ro N/A SEE BLOCK 16 SUBMISSION

(See Block 16) Draft

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14. All contractor sustainment report (CSR) related forms must be electronically submitted to the Central Repository at the DCARC web site at http://dcarc.cape.osd.mil

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Jordana1g C1J

10/1/2015 Janice Zilch .

9D~~U-- OCT 0 6 201~

DD FORM 1(23-1, FEB 2001/ {.fiEVIOUS EDITION MAY BE USED. G' u

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT JG. CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. ,2. TITLE OF DATA ITEM 3. SUBTITLE

A015 Software Resources Data Report: Initial Software Resources Data Reporting Developer Report and Data Dictionary '(SRDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81739B ._(see Block 16) SOW Para 5.4 AIR4.2

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED (See Block 16) SUBMISSION

b. COPIES

LT SEE BLOCK 16

a. ADDRESSEE Final

8. APPCODE c 11. AS OF DATE 13. DATE OF SUBSEQUENT

N/A See Block 16 SUBMISSION Repro

SEE BLOCK 16

Draft Reg.

16. REMARKS

AIR 4.2.1.2 PID: N00019-16-P1-PMA-213-0002

DCMA-ACO

Blocks 10 - 13: Prepare the Initial Software Resources Data Report PMA213H1 (SRDR) in accordance with DI-MGMT-81739B (or the most recently

DC ARC approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT- 81739B, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit SRDRs at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.

All SRDRs shall be submitted electronically using the CSDR Submit- Review System. The required file format for each SRDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes

15. TOTAL

requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE JoZ/tgliW 10/1/2015 Janice Zilch

' I OCT 0 6 201

Q0~~

I , ~ u

17. PRICE GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. ,2. TITLE OF DATA ITEM 3. SUBTITLE

A015 Software Resources Data Report: Initial Software Resources Data Reporting Developer Report and Data Dictionary I(SRDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81739B (see Block 16} SOW Para 5.4 AIR4.2

7. DD250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED (See Block 16) SUBMISSION

b. COPIES LT SEE BLOCK 16

a. ADDRESSEE Final

8.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

Reg.J Re~ro N/A See Block 16 SUBMISSION

SEE BLOCK 16

Draft

Block 14: All data shall be posted to the PMA213 Electronic data repository with notification to the distribution list in Block 14.

G. PREPARED BY H. DATE I. APPROVED BY J.DATE

Jorna"(}in~ j 10/1/2015 Janice Zilch

~O?fe'a- per o 6 20h DD FORM 1423-1, FEB lo1 1./ PREVIOUS EDITION MAY BE USED. l) u

CONTRACT DATA REQUIREMENTS LIST Form A~?croved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT I c. CATEGORY

0004 A MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AN/SPN-50(V)1 N00019-15-R-0081

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016 Software Resources Data Reporting: Final Software Resources Data Reporting Developer Report and Data Dictionary_ (SRDR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81740A (see Block 16) SOW Para 5.4 AIR4.2

7. DO 250 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQ REQUIRED (See Block 16) SUBMISSION

b. COPIES

LT SEE BLOCK 16

a. ADDRESSEE Final B.APPCODE c 11.ASOFDATE 13. DATE OF SUBSEQUENT

N/A SEE BLOCK 16 SUBMISSION Repro

SEE BLOCK 16

Draft Reg.

16. REMARKS

AIR4.2.1.2 PID: N00019-16-P1-PMA-213-0002

DCMA-ACO

Blocks 10- 13: Prepare the Final Software Resources Data Report PMA213H1 (SRDR) in accordance with DI-MGMT-81740A (or the most recently

DC ARC approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT- 817 40A, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs . The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit SRDRs at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed.