Aircraft Maintenance Unit (AMU)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S6N-23-B-0001
- Agency
- Alabama National Guard Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Montgomery, Alabama 36108, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks fixed-price construction services for a new 18,000 square foot Aircraft Maintenance Unit facility at Dannelly Field Air National Guard Base in Montgomery, Alabama. The United States Property and Fiscal Officer for Alabama will award a single contract for site work, excavation, foundations, and installation of structural, mechanical, electrical and utility systems for a new two-story building. Bids were due by July 11, 2023 and will be evaluated based on price alone to the responsible bidder providing the most advantageous offer.
The procurement has a 100% small business set-aside under NAICS code 236210 for commercial and institutional building construction with a size standard of $45 million. The potential award value exceeds $10 million and the project must be completed within 450 calendar days of notice to proceed at Dannelly Field Air National Guard Base in Montgomery, Alabama. Bear Brothers, Inc. submitted the apparent low bid of $15,152,362 in response to Solicitation Number W50S6N-23-B-0001.
Notice text
8 versions
Update #8 · Latest ·
Bid Opening Abstract
RFI Responses
Amendment #5 will change the bid opening date to 11 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #4 will change the bid opening date to 6 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #3 will incorporated Addenum #3 and all RFI responses. All Amendments musts be acknowlendeged on the Standard Form 1442
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #7 ·
RFI Responses
Amendment #5 will change the bid opening date to 11 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #4 will change the bid opening date to 6 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #3 will incorporated Addenum #3 and all RFI responses. All Amendments musts be acknowlendeged on the Standard Form 1442
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #6 ·
Amendment #5 will change the bid opening date to 11 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #4 will change the bid opening date to 6 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #3 will incorporated Addenum #3 and all RFI responses. All Amendments musts be acknowlendeged on the Standard Form 1442
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #5 ·
Amendment #4 will change the bid opening date to 6 July 2023 @ 2:00 PM. All Amendments musts be acknowlendeged on the Standard Form 1442
Amendment #3 will incorporated Addenum #3 and all RFI responses. All Amendments musts be acknowlendeged on the Standard Form 1442
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #4 ·
Amendment #3 will incorporated Addenum #3 and all RFI responses. All Amendments musts be acknowlendeged on the Standard Form 1442
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #3 ·
Pre-Bid briefing and attendance roster have been attached.
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #2 ·
Addenum #2 is incorporated by Amendment #2. All Amendments musts be acknowlendeged on the Standard Form 1442
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Update #1 ·
The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 18,000 square foot building housing the Base’s Aircraft Maintenance Unit (AMU). The project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story facility at the 187th Fighter Wing Dannlley Field ANG, Montgomery, AL. 36108.
The contract duration is 450 calendar days after NTP. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236210, with a size standard of $45,000,000.00. The magnitude is more than $10,000,000.
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will include five sole source/brand name items. Specific for compatibility with existing installation systems (justifications will be included with the solicitation):
- Johnson Controls- HVAC
- Monaco- Fire alarm
- Stanley Best Access Systems – Locks
- Advantor- Security systems
- Moduline Series Paver system – Concourse
Attachments
Show all 29
Notice history
| Notice | Type | Posted |
|---|---|---|
| Aircraft Maintenance Unit (AMU) | Award Notice | |
| Aircraft Maintenance Unit (AMU) | Solicitation | |
| Aircraft Maintenance Unit (AMU) | Pre-Solicitation |