This solicitation seeks fixed-price construction services for a new 18,000 square foot Aircraft Maintenance Unit facility at Dannelly Field Air National Guard Base in Montgomery, Alabama. The project scope includes site work, excavation, foundations, and relocation of existing utilities for a new two-story building housing maintenance operations. The contract duration is 450 calendar days with a magnitude over $10 million. The solicitation will be issued on SAM.gov and is set aside 100% for small businesses under NAICS code 236210 with a $45 million size standard. Five sole source items are required for compatibility with existing systems from Johnson Controls, Monaco, Stanley Best Access, Advantor, and Moduline Series pavers.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 18 April 2023
To: CMSgt. William Hall
Subject: ADDENDUM NO. 1
Project: AIRCRAFT MAINTENANCE UNIT FACILITY
Job #: ANG# FAKZ169003 / SSL# 18153
From: David Donovan
The plans and Specifications for the Aircraft Maintenance Unit Facility, dated 01 August 2021, are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).
Item No. 1: Refer to specification section 00 0102 “Project Information and
Summary.” Delete this specification section and replace it with the attached specification section 00 0102 with a revised date of 18 April 2023.
Item No. 2: Refer to specification section 01 6000 “Product Requirements.” Delete this specification section and replace it with the attached specification section 01 6000 with a revised date of 18 April 2023.
Item No. 3: Refer to specification section 32 1413 “Precast Concrete Unit Paving.”
Delete this specification section and replace it with the attached specification section 32 1413 with a revised date of 18 April 2023.
End of Addendum #1
AIRCRAFT MAINTENANCE FACILITY 18153/FAKZ169003 AUG 01, 2021
DANNELLY FIELD, MONTGOMERY, AL TYPE B-3(100%)
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 1
SECTION 000102 - PROJECT INFORMATION AND SUMMARY
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name: Aircraft Maintenance Unit Facility, located at 187th Fighter Wing, Air National Guard (ANG) Base at Dannelly Field, Montgomery, AL.
B. Government Project Number: FAKZ169003
C. Architect's Project Number: 18153.
D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.
E. Owner's Representatives:
1. Contracting Officer: Mr. Craig Kast
2. Contracting Specialist: Mr. Stephen Shanks
3. Contracting Officer Representative: Major Adam Sanders, Base Civil Engineer
4. Alternate Contracting Officer Representative: Major Nathan Brock, Deputy Base Civil Engineer
1.02 CONTRACT DURATION
A. 450 calendar days from notice to proceed to Beneficial Occupancy, this is in addition to 30 days for the punch list to be completely accomplished. The Government intends to occupy the building upon Beneficial Occupancy. The Contractor will be responsible for coordinating punch list activities around the Government's activities if both are occurring at the same time.
1.03 PROJECT DESCRIPTION
A. Project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two story facility with mechanical platform and associated sitework per the contract documents. The proposed project includes the following:
1. Vertical construction will consist of work on one facility. The Aircraft Maintenance Facility will be an approximate 18,000 square foot building housing the Base's Aircraft Maintenance Unit (AMU). Within the new Aircraft Maintenance facility, special facilities include non-secure office space, tool storage space, secure storage room, conference and ready rooms, locker rooms, and a break room.
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 2
2. Special attention will need to be paid to layout, erosion control, and laydown operations due to the limitations of the site and existing utilities on site. Scope of work will include the rerouting of underground utilities.
3. The new building’s structural system includes slab on grade with engineered fill soil stabilization, structural steel framing as well as load bearing masonry, composite floor slab, open web joists, and accoustical roof decking. The roof will have both low slope components with tapered insulation and thermoplastic roofing, sloped standing seam roofing. The exterior walls include veneer brick, cast stone, aluminm curtainwall, and metal wall panels.
4. Major building systems include a 4 pipe chilled and hot water system with associated boiler, chillers, and pumps.
5. Specialty equipment included in the project includes metal lockers and tool storage solutions.
6. Underground utility work will include all building necessary power, sanitary, storm, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, storm, gas, water, and data.
7. Site work will comprise of on-site parking, pedestrian paving, landscape and retaining walls, sodding, and landscape planting
B. Antiterrorism and Building Standoff Requirements:
1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.
C. Special Access Program Facilities (SAPF)
1. The project contains SAPF areas. These facilities are designed and shall be constructed in accordance with ICD 705-1 and IC Tech Spec for ICD/ICS 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities. These manuals establish physical and automated security design and construction standards for governing the construction, protection, and security of SAPF and SAPCA. Refer to the drawings and specifications for related scope of work including, but not limited to, physical construction of perimeter walls, floors, and ceilings ; Intrusion Detection System (IDS) and Closed Circuit Television (CCTV) System. The Contractor shall fully
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 3
familiarize himself with relevant requirements and provide the necessary information and instruction to all subcontractors, installers, and suppliers.
D. Intrusion Detection System (IDS) and CCTV:
1. The Secure Storage room is designed to be equipped with an ICD 705 compliant Instruction Detection System and CCTV.
2. The IDS system must be fully compatible with the existing USAF approved Advantor IDS Annunciator located in the 187th SFS BDOC.
3. As part of the base bid, the contractor is responsible for engaging Advantor Systems Cooperation (which is a sole source security system) for the procurement (purchase) and installation of the IDS and CCTV systems. Refer to limited source justification included in the solicitation documents furnished by the Government.
4. The base bid shall include all plant, labor, and materials to provide all collateral support as required by Advantor (in addition to collateral support indicated in the contract documents) for installation of a fully operational IDS and CCTV systems as defined by Advantor System Corporation.
5. The required scope of work is as outlined in the drawings. Advantor systems assisted in the design of the security systems and have furnished a "quote" as part of the design process. The "quote" is included in the project specifications for reference and identification of the required devices/materials. The Contractor shall contact ADVANTOR and receive an updated "quote" as part of the bid process.
All costs to install a complete and operation IDS and CCTV systems shall be included in the Contractor's bid.
E. Sustainability Design and Energy Conservation:
1. The project design incorporates Sustainability Concepts to achieve optimum resource efficiency, constructibility, sustainability, and energy conservation.
2. This project hass been registered with the USGBCI for guiding principals assesment recognition process.
3. The Contractor is responsible for ensuring all specified sustainable and energy conservation goals are achieved and fully implemented. Refer to section 01 3329 for sustainability reporting requirements. Refer to technical specifications for specific product requirements.
F. Building Systems Commissioning:
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 4
1. Refer to specification section 01 9113 - General Commissioning Requirements, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.
G. Government Furnished Furniture, furnishings and Equipment (FF&E):
1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI). (Deleted by Addendum No. 1)
1.04 PERMITS, FEES AND NOTICES
A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.
1. City of Montgomery Building Permit will not be required.
B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.
1.05 USE OF SITE AND MISC. REQUIREMENTS
A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.
1. Other areas are off limits to all construction personnel.
B. Access to site will be limited; obtain Government's approval of proposed routes of access.
C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.
D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 5
1. Contractor will be limited to the areas included within the project limits shown on the civil drawings.
E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.
1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. A fence along the project limits is anticipated at a minimum. However, exact location/extents of fencing is at the discretion of the Contractor. Removal of project boundary fencing along the Northern boundary of the project limits and connection of project fencing with fencing of the adjacent base supply project would be acceptable if agreed upon by both Contractors.
F. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.
G. Comply with the Government's security requirements - refer to specification section 01 3553.
H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.
1. Where indicated on the drawings work outside of the site extents may be required to connect to existing/new utilities.
1.06 UTILITY OUTAGES AND SHUTDOWN
A. All electrical and communication shut downs shall be performed on a non-working day for the Government(Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Contracting Officer Representative.
B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.
C. Prevent accidental disruption of utility services to other facilities.
1.07 PHASING OF WORK
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 6
adjacent to the project site remain open and accessible for use by the Government.
1.08 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer Representative.
B. Rerouting of existing utilities shown on the drawings must be properly sequenced with work associated with undercutting of the building pad so that shutdown of utility services is limited. Rerouting of existing utilities shall take place prior to the undercutting of the building pad. Rerouting of waterlines shall take place prior to the rerouting of the sanitary sewer. Storm water may be partially rerouted prior to starting the work associated with undercutting the building pad and commence again after undercutting is complete. Order and schedule of sequencing of this work shall be determined by the Contractor and coordinated with the Government.
1. Do not remove from service existing utilities serving adjacent facilities until new service can be established. Provide temporary service if necessary to allow construction to proceed prior to establishing new permanent service(s).
C. The contractor shall be responsible for all means, methods, sequencing of work, demolition, and reparations to the property and facilities as required to accomplish the work. This shall include but is not imited to the installation of all equiment furnishings, and materials.
1.09 PROJECT CONSULTANTS
A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..
1. Address: 1115 South Court Street.
2. City, State, Zip: Montgomery AL 36104.
3. Phone/Fax: 334-263-5162 334-263-5170.
4. Project Manager: Jake Johnson, AIA
5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP
B. Architect's Consultants:
1. Civil Engineering:
a. Professional Engineering Consultants
b. Address: 822 South McDonough St..
Revised 18 April 2023
PROJECT INFORMATION AND SUMMARY 000102 - 7
c. City, State, Zip: Montgomery, AL, 36104.
d. Phone/Fax: 334-262-7307 / 334-262-7309.
e. Contact: Steve Green - Pat Moseley
2. Structural Engineering:
a. Blackburn Daniels O'Barr, Inc.
b. Address: 8805 County Rd. 40E
c. City, State, Zip: Lowndesboro, AL, 36752.
d. Phone/Fax: 334-265-0206 / 334-265-0207.
e. Contact: Mark O'Barr
3. Plumbing, Mechanical & Fire Suppression Engineering:
a. HHB Engineers, P.C.
b. Address: 104 Josie Run
c. City, State, Zip: Prattville, AL, 36066
d. Phone: 334-358-2707
e. Contact: Tom Hattemer, P.E.
4. Electrical Engineering:
a. Gunn & Associates, P.C.
b. Address: 3102 Hwy 14
c. City, State, Zip: Millbrook, AL 36054
d. Phone: 334-285-1273
e. Contact: Barry Gravlee, P.E.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 1
SECTION 016000 - PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Re-use of existing products.
C. Transportation, handling, storage and protection.
D. Product option requirements.
E. Limited Source Product Requirements
F. Substitution limitations.
G. Procedures for Government-supplied products.
H. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 RELATED REQUIREMENTS
A. Section 011000 - Summary: Lists of products to be removed from existing building.
B. Section 014000 - Quality Requirements: Product quality monitoring.
C. Section 016116 - Volatile Organic Compound (VOC) Content Restrictions:
Requirements for VOC-restricted product categories.
1.03 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 2
1.04 SUBMITTAL SCHEDULE
A. At the beginning of the project, generate a comprehensive list of products requiring submittals by the specifications.
B. In the schedule, include the following information for each product:
1. Specification section for the product.
2. Type of submittal (i.e. shop drawings, product data, samples, mock-up)
3. Date submitted (to be filled in during construction)
4. Action taken by Government (to be filled in during construction)
5. Date Approved (to be filled in during construction)
6. Comments
7. Critical Relationships
C. Coordinate product submittal schedule with project construction schedule.
D. Submit schedule to the Government for review within 15 days of Notice to Proceed.
E. If necessary, revise schedule as requested by the Government
F. Schedule will be utilized at each progress meeting to review status of required submittals and coordination with project construction schedule.
1. Update submittal schedule and submit to the Government 48 hours prior to each scheduled progress meeting.
1.05 QUALITY ASSURANCE
A. Source Limitations: To the fullest extent possible, provide products of the same kind, from a single source.
B. Each prime Contractor is responsible for providing products and construction methods that are compatible with products and construction methods of other prime or separate Contractors.
C. If a dispute arises between prime Contractors over concurrently selectable, but incompatible products, the Government will determine which products shall be retained and which are incompatible and must be replaced.
D. Nameplates: Except for required labels and operating data, do not attach or imprint manufacturer's or producer's nameplates or trademarks on exposed surfaces of products
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 3
which will be exposed to view in occupied spaces or on the exterior.
E. Labels: Locate required product labels and stamps on a concealed surface or, where required for observation after installation, on an accessible surface that is not conspicuous.
PART 2 PRODUCTS
2.01 EXISTING PRODUCTS
A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.
B. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the Owner, or otherwise indicated as to remain the property of the Owner, become the property of the Contractor; remove from site.
2.02 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by the Contract Documents.
B. DO NOT USE products having any of the following characteristics:
1. Made using or containing CFC's or HCFC's.
2. Made of wood from newly cut old growth timber.
C. Where all other criteria are met, Contractor shall give preference to products that:
2.03 PRODUCT SELECTION
A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise indicated, unused at the time of installation.
B. Provide products complete with all accessories, trim, finish, safety guards and other devices and details needed for a complete installation and for the intended use and effect.
C. Standard Products: Where available, provide standard products of types that have been produced and used successfully in similar situations on other projects.
D. Product Selection Procedures: Product selection is governed by the Contract Documents and governing regulations, not by previous Project experience. Procedures governing product selection include the following:
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 4
E. Where products or manufacturers are specified by name, accompanied by the term "or equal," or "or approved equal" comply with the Contract Document provisions concerning "substitutions" to obtain approval for use of an unnamed product, unless noted otherwise in specific specification section.
F. Non-Proprietary Specifications: When the Specifications list products or manufacturers that are available and may be incorporated in the Work, but do not restrict the Contractor to use of these products only, the Contractor may propose any available product that complies with Contract requirements. Comply with Contract Document provisions concerning "substitutions" to obtain approval for use of an unnamed product.
G. Descriptive Specification Requirements: Where Specifications describe a product or assembly, listing exact characteristics required, with or without use of a brand or trade name, provide a product or assembly that provides the characteristics and otherwise complies with Contract requirements.
H. Compliance with Standards, Codes and Regulations: Where the Specifications only require compliance with an imposed code, standard or regulation, select a product that complies with the standards, codes or regulations specified.
I. Visual Matching: Where Specifications require matching an established Sample, the Architect's decision will be final on whether a proposed product matches satisfactorily.
J. Where no product available within the specified category matches satisfactorily and also complies with other specified requirements, comply with provisions of the Contract Documents concerning "substitutions" for selection of a matching product in another product category, or for noncompliance with specified requirements.
K. Visual Selection: Where specified product requirements include the phrase "...as selected from manufacturer's standard colors, patterns, textures..." or a similar phrase, select a product and manufacturer that complies with other specified requirements. The Government will select the color, pattern and texture from the product line selected.
2.04 PRODUCT OPTIONS
A. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.
B. Compatibility of Options: When the Contractor is given the option of selecting between two or more products for use on the Project, the product selected shall be compatible with products previously selected, even if previously selected products were also options.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 5
2.05 LIMITED SOURCE PRODUCT REQUIREMENTS
A. The following products/manufacturers are require to be provided, by name, with substitutions not allowed
1. Johnson Controls, Inc., for building automation and energy management systems and equipment.
2. ADVANTOR Systems for furnishing and installation of Intrusion Detection, Access Control, and Closed Circuit TV systems.
3. Monaco Enterprises, Inc., for fire alarm transceiver antennae for communication with existing base fire alarm reporting systems.
4. BEST Access Keying Systems (Patented MX-8 Keying System) for all key cores.
All cylinders/hardware must be compatible with and able to recieve BEST MX-8 key cores,
5. Belgard Moduline precast concrete unit pavers as specified in section 32 1413 to match existing pavers at the adjacent Supply and Simulator facilities. (Added by Addendum No. 1)
B. Refer to the Government's limited source justification(s) included with the project solicitation for additional information.
2.06 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
PART 3 EXECUTION
3.01 SUBSTITUTION LIMITATIONS
A. The Government will consider requests for substitutions only within 30 days after date established in Notice to Proceed.
1. Substitutions received after this time period may be considered or rejected at the discretion of the Government.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 6
C. A request for substitution constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.
2. Will provide the same warranty for the substitution as for the specified product.
3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to the Government.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
5. Will reimburse the Government for review or redesign services associated with re-approval by authorities.
D. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.
E. Substitution Submittal Procedure:
1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.
3. The Government will notify Contractor in writing of decision to accept or reject request.
F. Conditions: The Contractor's substitution request will be received and considered by the Government only when one or more of the following conditions are satisfied, as determined by the Government; otherwise requests will be returned without action except to record noncompliance with these requirements.
1. Extensive revisions to Contract Documents are not required.
2. Proposed changes are in keeping with the general intent of Contract Documents.
3. The request is timely, fully documented and properly submitted.
4. The request is directly related to an "or equal" clause or similar language in the Contract Documents.
5. The specified product or method of construction cannot receive necessary approval by a governing authority, and the requested substitution can be approved.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 7
6. A substantial advantage is offered the Government, in terms of cost, time, energy conservation or other considerations of merit
7. The specified product or method of construction cannot be provided in a manner that is compatible with other materials, and where the Contractor certifies that the substitution will overcome the incompatibility.
8. The specified product or method of construction cannot be coordinated with other materials, and where the Contractor certifies that the proposed substitution can be coordinated.
9. The specified product or method of construction cannot provide a warranty required by the Contract Documents and where the Contractor certifies that the proposed substitution provide the required warranty.
G. The Government reserves the right to reject any substitutions.
3.02 GOVERNMENT-SUPPLIED PRODUCTS
A. The Government's Responsibilities
1. Arrange for and deliver Government reviewed shop drawings, product data and samples, to Contractor.
2. Arrange and pay for product delivery to site unless specifically noted otherwise.
3. On delivery, inspect products jointly with Contractor.
4. Submit claims for transportation damage and replace damaged, defective, or deficient items.
5. Arrange for manufacturers' warranties, inspections and service.
B. Contractor's Responsibilities:
1. Review Government reviewed shop drawings, product data, and samples.
2. Receive and unload products at site; inspect for completeness or damage jointly with the Government
3. Handle, store, install and finish products.
4. Repair or replace items damaged after receipt.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 8
3.03 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.04 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. If approved by the Government, provide bonded off-site storage and protection when site does not permit on-site storage or protection.
G. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
Revised 18 April 2023
PRODUCT REQUIREMENTS 016000 - 9
H. Comply with manufacturer's warranty conditions, if any.
I. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
J. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.
K. Prevent contact with material that may cause corrosion, discoloration, or staining.
L. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
M. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
N. Store heavy materials away from the Project structure in a manner that will not endanger the supporting construction.
O. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of construction spaces.
P. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other losses.
Q. Store heavy materials away from the Project structure in a manner that will not endanger the supporting construction.
Revised 18 April 2023
PRECAST CONCRETE UNIT PAVING 321413 - 1
SECTION 321413 - PRECAST CONCRETE UNIT PAVING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Interlocking concrete paver units.
B. Sand setting bed.
C. Polymeric sand joint filler.
D. Edge restraints.
1.02 RELATED REQUIREMENTS
A. Section 01 2300 - Bid Options
B. Section 31 2210 - Earthwork
C. Section 32 1314 - Cement Concrete Paving
1.03 REFERENCE STANDARDS
A. ASTM C33/C33M - Standard Specification for Concrete Aggregates 2013.
B. ASTM C144 - Standard Specification for Aggregate for Masonry Mortar 2011.
C. ASTM C936/C936M - Standard Specification for Solid Concrete Interlocking Paving Units 2018.
1.04 SUBMITTALS
A. See Section 01 3001 - Submittals, for submittal procedures.
B. Product Data: Provide characteristics of paver unit, dimensions, and special shapes.
C. Product Data: Provide characteristics of polymeric sand, including base material, additive(s), compressive strength, and color.
D. Samples: Submit two samples of each paver type, illustrating style, size, color range and surface texture of units being provided.
E. Manufacturer's Installation Instructions: Indicate substrate requirements and installation methods.
F. Maintenance Materials: Provide the following for Government's use in maintenance of project.
Revised 18 April 2023
PRECAST CONCRETE UNIT PAVING 321413 - 2
1. See Section 016000 - Product Requirements, for additional provisions.
2. Extra Pavers: 10 of each type and size.
PART 2 PRODUCTS
2.01 MATERIALS
A. Interlocking Concrete Pavers: Hydraulically pressed concrete, configured for interlocking with adjacent units and complying with ASTM C936/C936M.
1. Provide Belgard Moduline paver as required to match existing paver at the adjacent Supply and Simulator facilities.
a. Refer to specification section 01 6000 Product Requirements and the Government's solicitation documents for limited source justification associated with the listed product/manufacturer. (Added by Addendum No.
1)
2. Thickness:
a. 2-3/8" (60 mm) for pedestrian applications
b. 3-1/8" (80 mm) for vehicular applications.
3. Size:
a. Provide manufacturer's standard sizes to provide pattern indicated on the drawings which utilizes a 12" x 12", 6" x 6", and 4" x 18" size units.
b. Provide manufacturer's standard sizes to provide pattern equal to the Belgard HH pattern which utilizes a 12" x 12", 6" x 6", and 4" x 18" size units.
(Deleted by Addendum No. 1)
4. Finsh: Smooth (Deleted by Addendum No. 1)
5. Compressive Strength: 8000 pounds per square inch (55 MPa) average, with minimum of 7200 pounds per square inch (50 MPa).(Deleted by Addendum No. 1)
6. Absorption: 5 percent average, with maximum of 7 percent.(Deleted by Addendum No. 1)
7. Type: Rectangular.(Deleted by Addendum No. 1)
8. Color: Selected from manufacturer's full range. (Deleted by Addendum No. 1)
Revised 18 April 2023
PRECAST CONCRETE UNIT PAVING 321413 - 3
9. Color: Provide custom color, if required, to match existing paver at the adjacent Supply and Simulator facilities. (Added by Addendum No. 1)
B. Sand for Setting Bed: Clean washed natural sand or crushed stone complying with gradation requirements of ASTM C33/C33M for fine aggregates.
C. Polymeric Sand: Fine sand complying with ASTM C144 combined with polymer binders for creating semi-solid joints between pavers.
1. Color: as selected from manufacturer's full range .
D. Edging: Concrete curb, as detailed.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that substrate is level or to correct gradient, smooth, capable of supporting pavers and imposed loads, and ready to receive work of this Section.
B. Verify gradients and elevations of substrate are correct.
C. Verify dry weather forecast without rain for a minimum of 24 hours with temperatures above 55 degrees Fahrenheit (13 degrees Celsius).
D. Verify that pavers are completely dry prior to polymeric sand installation.
3.02 INSTALLATION OF SOLID PAVER UNITS
A. Spread sand bedding evenly over prepared substrate surface to a maximum thickness of 1 inch (25 mm) .
B. Dampen and roller compact sand to level and even surface.
C. Place paver units in pattern equal to the Belgard HH pattern creating staggered joints, from straight reference edge.
D. Cut paver units at edges with masonry saw.
E. Place half units at edge and interruptions. Maintain tight joints.
F. Spread polymeric sand uniformly over surface. Use a push broom to fill joints and remove excess while not sweeping long distances. Sweep all excess with a fine bristle brush and remove residues with a leaf blower.
G. Tamp and level paver units with mechanical vibrator until units are firmly bedded, level, and to correct elevation and gradients. Do not tamp unrestrained edges.
Revised 18 April 2023
PRECAST CONCRETE UNIT PAVING 321413 - 4
3.03 CLEANING
A. Do not clean pavers until pavers and mortar are dry.
B. Clean soiled surfaces using cleaning solution. Do not harm pavers, joint materials, or adjacent surfaces.
C. Use non-metallic tools in cleaning operations.
D. Rinse surfaces with clean water.
E. Broom clean paving surfaces. Dispose of excess sand.
3.04 PROTECTION
A. Do not permit traffic over unprotected paver surface.
B. Protect paver surface with sheets of plywood.
C. Do not permit traffic for 48 hours after pavement placement.
| ADD#1 |
| Blank Page |
| 000102-RIB-Project Information and Summary-04-18-2023 |
| 016000-RIB-Product Requirements-04-18-2023 |
| Blank Page |
| 321413-RIB-Precast Concrete Unit Paving-04-18-2023 |
| Blank Page |
| 2023-04-18T16:13:44-0500 | |
| David Donovan |